751/21294. TAP; Sturgeon River Sloughs Bridge

Closed State & local contract opportunity Posted

Solicitation number
RFQ - 171 - 230000000210
State
Michigan
Responses due

Opportunity facts

Updated .

About this opportunity

The State of Michigan, through the Michigan Department of Natural Resources (MDNR), is procuring a contract for the Sturgeon River Sloughs Bridge Replacement project in Houghton County and the Chesaning Village jurisdiction. The project involves demolishing the existing steel bridge with a wood deck, removing the existing log abutments, and installing new concrete abutments, a steel superstructure, timber decking and wearing surface, guardrail, signs, gravel approaches, riprap, erosion control measures, and slope restoration. The project must achieve substantial completion by August 25, 2023 and final completion by September 15, 2023. Bidders must have experience with similar projects and provide a bid guarantee, performance bond, and payment bond. Bid submissions must be uploaded to the SIGMA VSS system by March 8, 2023 at 2:00 pm local time. A mandatory virtual pre-bid meeting was held on February 14, 2023.

The contract has a 10% pricing preference for qualified disabled veteran-owned businesses. No incumbents or existing infrastructure integration requirements are specified. The contract will be awarded to the responsive and responsible best value bidder, and the project is funded by the MDNR. No specific award values or budget ranges are provided in the documentation.

Opportunity text

Please do not submit online questions via VSS, all questions should be emailed to Steve Wright, at swright@upea.com. Bid attachments MUST be uploaded to SIGMA VSS - hard copies will not be accepted. If you have questions or experience issues with your electronic submission, please contact the SIGMA Help Desk either by telephone at 888.734.9749 or by email at sigma-procurement-helpdesk@michigan.gov Please remember that Individual attachments can be no larger than 6 mb. Please notify the Office of Design and Construction if you are having SIGMA VSS issues. Include your SIGMA ticket number in an email to our contract specialists, Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov ). You may be asked to email your proposal. Emailed submissions will require DCD approval and will be handled on a case-by-case basis. Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity