This document is an Addendum to the bid specifications for the Sturgeon River Sloughs Bridge Replacement project in Houghton County, Michigan, issued by U.P. Engineers & Architects, Inc. on behalf of the Michigan Department of Natural Resources. The addendum clarifies, modifies, and changes the original plans and specifications, including details related to the bridge decking and railing materials, connections, and hole sizes. It also provides responses to bidder questions regarding acceptable materials, including clarification that Douglas Fir or Southern Pine #1 grade pressure-treated lumber can be used for the bridge decking and wearing surface. Additionally, the addendum includes an updated list of attendees from the pre-bid meeting held on February 14, 2023.

The project does not have Buy America restrictions, and the contract is being procured through the State of Michigan's procurement system. Bid submissions must be uploaded to the SIGMA VSS system, and any issues with the electronic submission process should be communicated to the State's design and construction team.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100 Portage Street Houghton, MI 49931

906-482-4810 • 800-562-7684 • Fax: 906-482-9799

Office also in:

Iron Mountain

Ishpeming

Marinette

Marquette

Sault Ste Marie

U.P. Engineers & Architects, Inc.

www.UPEA.com

ADDENDUM # 1

File No. 751/21294.TAP

Michigan Department of Natural Resources

Sturgeon River Sloughs Bridge Replacement

Houghton County, Michigan

This ADDENDUM NO. 1, issued on February 21, 2023 is to clarify, modify and/or change the original plans and specifications issued by U.P. Engineers & Architects, Inc. and is hereby made a part of the bidding documents.

Bidders are required to acknowledge receipt of this ADDENDUM NO. 1 on the appropriate place on the Bid Form.

Pre-Bid Meeting

1. Attendance Record is attached to this Addendum.

Bidder Questions and Answers

1. Q: Can the 6x6 CuNAP Timbers be Douglass-Fir instead of Southern Pine?

A: Yes. Bridge decking and wearing surface can be either pressure treated Southern Pine

#1 or Doug-Fir #1. In addition, the decking can be white oak.

2. Q: In the meeting you mentioned smooth wall HDPE for the approach rail post tubes.

Based on two other projects last summer the smooth wall HDPE was very difficult to get and very pricy. We had to modify to the HDPE double wall culvert pipe with a second option of Schedule 35 PVC at locations with space issues.

A: HDPE double wall corrugated pipe and Schedule 35 PVC pipe are acceptable alternatives.

3. Q: Timber 6x6 spacing, 10” and 8” shown. Please advise which is correct.

A: 8”.

4. Q: Will the flange holes be shop drilled or field-drilled? If shop drilled, what size hole?

Also how many holes per connection, 2 total or 2 per each side of beam (4 total)? This connection could be very labor intensive. You may want to consider using hcp clips, see attached. The bolt would be countersunk to facilitate the wear plank decking. The HCP clips would allow an offset connection and negate the need for flange holes and future corrosion concerns with drilling holes in the flange.

A: Holes can be either field and shop drilled. Hole size shall be 3/8” dia. through the steel flange. There are two (2) screws into each 6x6 at each beam flange. HCP clips will not be allowed.

5. Q: Does this project have Buy America restrictions?

A: No.

ADDENDUM NO. 1

751/21294.TAP Sturgeon River Sloughs Bridge – Addendum #1 February 21, 2023

6. Q: What size is the curb. Looks large (3x12) on S101, however in D5 on S102 it is called out as 2x4?

A: Curbs are 3x8 to match the wearing surface.

7. Q: The HSS6x3x1/2” top rail is not an available rolled size in weathering steel. This was a conflict on a different DTMB job. Suggest changing to a different size. Project mentioned changed to 6x4x3/8. The 2.5 x 2.5 x 3/16” is also a “non-standard size” that can be more difficult to source. 2x2x1/4” would be more readily available and far more cost-effective if open to changes and works for the railing design.

A: The top rail shall be a HSS6x4x3/8”. The intermediate horizontal rails may be

2.5x2.5x3/16” or 2.5x2.5x1/4”. A 2x2x1/4” is not an option.

8. Q: Would Douglas Fir #1 be acceptable for approach railing material, at least for the post?

A: Yes.

9. Q: Railpost to beam connection detail has a C12x20.7 standoff. The width of a Cx12.20.7 is ~3-inches, however the railing post is only 2-inches wide (6x2x1/4”). What is the expectation for this weld?

A: The web of the C12x20.7 shall line up with the wall of the railing post. The flange can run past the railing post. Weld all around with 3/16” fillet welds.

Specifications

1. Section 06 10 00 – Rough Carpentry – Typo fixed on page 140. UC4C, not UC4A. See attached revised sheet.

Plans (see attached)

1. Sheet C001, revise the following note:

a. Design Data:

i. BRIDGE WEARING SURFACE (3x8’S): WHITE OAK, DOUG-FIR OR

SOUTHERN PINE #1 GRADE OR BETTER. SOUTHERN PINE AND

DOUG-FIR SHALL BE PRESSURE TREATED.

ii. BRIDGE DECKING (6x6’S): DOUG-FIR OR SOUTHERN PINE #1

GRADE OR BETTER, PRESSURE TREATED.

iii. ALL OTHER DIMENSION LUMBER: SP OR DF # GRADE OR

BETTER, PRESSURE TREATED.

2. Sheet S101, revise the following notes:

a. SECTION THROUGH DECK: 6X6 RC CuNAP TIMBERS (8” SPACING TYP)

b. SECTION THROUGH ABUTMENT: 3X8 RC WHITE OAK OR SOUTHERN

PINE TREATED DECKING

3. Sheet S102

a. Detail A4: Revise HDPE smooth wall note.

b. DetailD5: Revise top rail size and curb.

END OF ADDENDUM NO. 1

Attachments:

Pre-bid Meeting Attendance Record

ADDENDUM NO. 1

751/21294.TAP Sturgeon River Sloughs Bridge – Addendum #1 February 21, 2023

751-21294.TAP Sturgeon River Sloughs Photos

751-21294.TAP Sturgeon River Sloughs Specs Pg 140

751-21294.TAP Sturgeon River Sloughs AS-BUILT PLANS C001

751-21294.TAP Sturgeon River Sloughs AS-BUILT PLANS S101

751-21294.TAP Sturgeon River Sloughs AS-BUILT PLANS S102

DTMB-0441 (R 19.02)

MEETING ATTENDANCE RECORD

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration

Design and Construction Division

PROJECT DESCRIPTION/LOCATION

Sturgeon River Sloughs Bridge, Houghton County, MI

DATE

2023-02-14

TIME

9:00 A.M.

FILE NUMBER

751/21294.TAP

CONTRACT NUMBER

Y21442

MEETING PLACE

Virtual Pre-Bid Meeting via. Microsoft Teams

PLEASE PRINT YOUR NAME

FIRM YOU REPRESENT

EMAIL ADDRESS

TELEPHONE NUMBER

Bill Casagranda

FA Industrial Services, Inc.

b.casagranda@fais.build

906-265-2100

Thomas Bergquist

Snow Country Contracting, Inc.

karenj@snowcountryhomes.com

906-932-1411

Will Rajala

WR Construction, LLC rajalaw@wrcmqt.com

906-362-2371

Jamie Hammerstrom

MJO Contracting, Inc.

jhammerstrom@mjocontracting.co

906-482-8965

Clay Palosaari

DP Construction Inc.

clayp@up.net

906-370-0686

Brett Hebert

Hebert Construction Co.

pm@hebertconstructionco.com

906-265-5157

Jacob Gravina

Grand River Construction, Inc.

MPrice@grandriverconstruction.

616-669-5611

John Coponen

Coponen Concrete coponenconcrete@gmail.com

906-370-6015

Dan Puska

IMS Contracting dpuska@imscontracting.com

906-280-5537

Michael Delene

MD Contracting mdcontracting@gmail.com

906-353-7228

Brian Lindberg

Associated Constructors jerjoe88081@gmail.com

906-251-8704

Jake Silkey

Wheeler jsilkey@wheeler1892.com

262-229-4068

Brendan Fosgitt

Blue Restoration LLC bluerestorationllc@yahoo.com

989-615-4682

Thomas Pawlowski

DTMB

PawlowskiT@@michigan.gov

517-242-0973

Danielle Newman

DTMB

NewmanD6@michigan.gov

517-331-5369

John DePue

DNR

DePueJ1@michigan.gov

906-353-6651

Jeff Kakuk kakukj@michigan.gov

906-563-9247

Steve Wright

UPEA

swright@upea.com

906-315-1355

Matthew LaVallee

UPEA

mlavallee@upea.com

906-315-1325

DTMB-0441 (R 19.02)

MEETING ATTENDANCE RECORD

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration

Design and Construction Division

PROJECT DESCRIPTION/LOCATION

Sturgeon River Sloughs Bridge, Houghton County, MI

DATE

2023-02-14

TIME

9:00 A.M.

FILE NUMBER

751/21294.TAP

CONTRACT NUMBER

Y21442

MEETING PLACE

Virtual Pre-Bid Meeting via. Microsoft Teams

PLEASE PRINT YOUR NAME

FIRM YOU REPRESENT

EMAIL ADDRESS

TELEPHONE NUMBER

Brad Johnson

JOHNSONB@michigan.gov

906-353-6651

Bill Scullon

SCULLONH@michigan.gov

906-563-9247 mlavallee Image mlavallee Snapshot mlavallee Text Box Photo Taken from Existing Bridge Looking West mlavallee

Photo Taken from Existing Bridge Looking East mlavallee

Photo Taken from Existing Bridge Looking South mlavallee

Photo Taken from Existing Bridge Looking North mlavallee

Photo Taken from Underneath Bridge Looking at Abutment mlavallee

Photo Taken from Underneath Bridge Looking at Abutment mlavallee

Photo Taken from Underneath Bridge Looking at Typical Abutment Damage

[M12-01629]

Rough Carpentry

06 10 00 - 3

PART 2 PRODUCTS

2.1 LUMBER MATERIALS

A. Lumber Grading Rules: RIS SPIB WCLIB WRCA WWPA NFPA.

B. Wearing Surface: Stress Group A, White Oak, Doug Fir or Southern Pine, Rough Sawn, No. 1 grade, 19 percent maximum moisture content. Doug Fir or Southern Pine shall be CuNAP treated.

C. Bridge Decking: Stress Group A, Southern Pine (S.P.) species, CuNAP treated (UC4B), Rough

Sawn, No. 1 grade, 19 percent maximum moisture content.

D. Miscellaneous Framing: Stress Group A, Southern Pine (S.P.) species, pressure treated (UC4A), No. 2 grade, 19 percent maximum moisture content.

2.2 FACTORY WOOD TREATMENT

A. Wood Preservative (Pressure Treatment): AWPA UC4C, Commodity Specifications A-Sawn

Products or F-Wood Composites, using oil based Copper Naphthenate preservative. Approach rail may be treated with Micronized Copper Quat (MCQ) preservative, AWPA UC4C.

B. Moisture Content after Treatment: Kiln dried (KDAT).

C. Lumber: Maximum 19 percent.

2.3 ACCESSORIES

A. Fasteners and Anchors:

1. Fasteners: ASTM A153, hot-dip galvanized steel for high-humidity and treated wood locations.

2. Fasteners, Coated: Coated structural and deck screws by any of the following manufacturers.

a. GRK Fasteners

b. Big Timber

c. Or equal – submit for approval.

PART 3 EXECUTION

3.1 APPLICATION

A. Framing:

1. Carefully select all members. Select individual pieces so that knots and defects will not interfere with placement of bolts, when nailing or making connections.

2. Discard defective pieces.

3. Set structural members level and plumb, in correct position.

4. Fasten framing according to applicable code.