751/19151. BDW; Au Gres River Mouth BAS - Pavement Rehab
Awarded State & local contract opportunity Posted
- Solicitation number
- RFQ 171 220000000339 2
- State
- Michigan
- Responses due
Opportunity facts
- Jurisdictions
- UNSPSC codes
- 72121000 New industrial building and warehouse construction services
- 72121500 Industrial plant construction services
- 72121001 Dry cleaning plant construction and remodeling service
- 72121003 Grain elevator construction and remodeling service
- 72121401 Bank building construction service
- 72121502 Mine loading and discharging station construction service
- 72121507 Tank construction and servicing
- 72121508 Preparation plant construction service
- 95122403 Warehouse store
- 95121600 Transport buildings and structures
Show all 19
- 72121002 Food product manufacturing or packing plant construction and remodeling service
- 72121007 Truck and automobile assembly plant constructionand remodeling service
- 72121008 Warehouse construction and remodeling service
- 95122400 Industrial buildings and structures
- 72121005 Pharmaceutical manufacturing plant construction and remodeling service
- 95122401 Workshop
- 72121004 Paper or pulp mill construction and remodeling service
- 72121501 Chemical plant construction service
- 95122402 Cold storage installation
Updated .
About this opportunity
The State of Michigan Department of Technology, Management and Budget (DTMB) is procuring construction services for the Au Gres River Mouth Boating Access Site Pavement Rehabilitation project (File No. 751/19151.BDW) located in Au Gres, Michigan, in Arenac County. This construction project involves comprehensive pavement rehabilitation including pulverizing and removal of existing concrete and bituminous pavement surfaces across approximately 4.90 acres, site grading and preparation, installation of 126,500 square feet of new MDOT bituminous mix asphalt in base and surface courses for boat trailer parking areas, ADA-accessible parking improvements with associated signage and pavement markings, culvert construction, storm sewer infrastructure installation, and implementation of soil erosion and sedimentation control measures in accordance with Michigan regulations. Deliverables include complete site restoration with topsoil placement, seeding, and mulching, utility coordination with AT&T, Consumers Energy, and Charter Communications, and all work must comply with Michigan Occupational Safety and Health Act (MIOSHA) regulations and local permit requirements. The contract duration is 90 calendar days from the Notice-to-Proceed with a target substantial completion date of September 30, 2022, and the contract end date of October 30, 2022, with liquidated damages of $500.00 per calendar day assessed for delays. A mandatory pre-bid meeting and site tour was held on May 10, 2022, at 2:00 PM Eastern time at the River Mouth Boating Access Site, and electronic bids were required to be submitted through the SIGMA VSS system by May 18, 2022, at 2:00 PM Eastern time, with questions accepted until May 12, 2022, at 12:00 PM Eastern time. Required qualifications include a 5% bid security, performance and payment bonds for contracts exceeding $50,000, compliance with Michigan prevailing wage requirements with rates established for multiple trade classifications, and Michigan residency requirements mandating that 50 percent of workers be Michigan residents for at least one year.
This procurement is subject to Michigan prevailing wage requirements with hourly rates established for carpenters, laborers, operating engineers, electricians, and specialized trades, including overtime provisions at time-and-one-half and double-time rates. Contractors and subcontractors must post prevailing wage rates conspicuously on the construction site and maintain accurate payroll records subject to state inspection. No specific set-aside designations for disadvantaged enterprises are noted in the procurement documents, nor are incumbent vendors or current contractors identified. The project is funded by the Department of Natural Resources (DNR) through Funding Code 1117, and special working conditions apply as a DNR facility, including restrictions on work during September and requirements for minimal interference with normal boating access site operations, with the DNR required to approve all access routes. The base bid must include a $7,500 cash allowance for construction testing and a $2,500 contingency allowance, with all bonds, insurance, permits, and general conditions costs the responsibility of the bidder. While no specific award value is disclosed in the procurement documents, the project scope and bonding requirements for contracts exceeding $50,000 suggest a substantial contract value, with the professional services consultant William A. Kibbe & Associates, Inc., available at 989.752.5000 or jwheeler@kibbe.com for additional project information.
Opportunity text
751/19151.BDW; Au Gres River Mouth BAS - Pavement Rehab
Files
| File | Type | Posted |
|---|---|---|
| Addendum 1 with Attachments.pdf | ||
| Plans 19151.pdf | ||
| Specifications 19151.pdf | ||
| Advertisement 19151.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity