706- PCI Water Treatment Plant UV replacement

Closed State & local contract opportunity Posted

Solicitation number
SRC0000037153
State
Ohio
Responses due

Opportunity facts

Opportunity details come from ohiobuys.ohio.gov. Updated .

About this opportunity

Pickaway Correctional Institution, an Ohio Department of Rehabilitation and Correction facility located in Ross County, is procuring the replacement of an ultraviolet (UV) disinfection system at its on-site wastewater treatment plant. The current UV system has reached the end of its operational life and must be replaced to maintain compliance with Ohio Environmental Protection Agency requirements. The project involves the supply and installation of a new UV disinfection system that will enable the facility's wastewater treatment plant to continue operating effectively and meeting all applicable regulatory standards. The primary objective is to ensure the replacement system is fully operational no later than May 1, 2026, making this a time-sensitive procurement. The solicitation was posted on March 2, 2026, with a proposal due date of March 17, 2026, providing potential bidders with 15 days to develop and submit their responses. While specific technical specifications and detailed requirements are contained in the Scope of Work document (PCI WWTP UV SOW.pdf), the accessible summaries indicate that vendors must demonstrate the capability to procure, install, test, and commission the new UV system within the compressed timeline. No specific evaluation criteria, site visit schedules, or pre-bid conference information is detailed in the available documentation.

The contract opportunity documentation includes an Affirmation and Disclosure Form that bidders must complete as part of the procurement process, though specific set-aside designations for disadvantaged enterprises or restrictions on eligible organization types are not detailed in the accessible file summaries. No incumbent vendors or current contractors are identified in the provided documentation, nor are details regarding existing infrastructure or technology requirements specified. The procurement documents reference Executive Orders (EO 2019-12D and EO 2022-02D) that establish the authorization framework for this project, and participation through Ohio's centralized OhioBuys procurement platform is required. Budget allocations, award values, or specific pricing parameters are not disclosed in the available documentation summaries. Interested vendors should consult the complete solicitation documents and Scope of Work to obtain detailed pricing information, bonding requirements, insurance specifications, and other material terms and conditions necessary to prepare competitive proposals.

Opportunity text

Pickaway Correctional Institution operates an on-site wastewater treatment plant that must remain in compliance with Ohio EPA requirements. The current ultraviolet (UV) disinfection system has reached the end of its useful life and must be replaced. This project is time sensitive and must be fully operational no later than May 1, 2026.

Files

File Type Posted
OhioBuys Fact Sheet for Bidders_Suppliers.pdf PDF
EO 2019-12D.pdf PDF
PCI WWTP UV SOW.pdf PDF
EO_2022-02D (1).pdf PDF
04-Affirmation and Disclosure Form_3-4-22.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity