PCI WWTP UV SOW.pdf

PDF 62 KB Posted

Attached to
706- PCI Water Treatment Plant UV replacement
Solicitation number
SRC0000037153
Issued by
Ross County, Cincinnati City, Ohio

About this file

This is a Scope of Work document for the Pickaway Correctional Institution (PCI) Water Treatment Plant UV replacement project in Ohio. The project involves the replacement of the facility's ultraviolet disinfection system at the on-site wastewater treatment plant, which has reached the end of its operational life. The current system must be replaced to maintain compliance with Ohio EPA requirements. The project is time-sensitive with a deadline for full operational status no later than May 1, 2026. The document outlines the technical specifications and requirements necessary for the UV system replacement to ensure the wastewater treatment plant continues to operate effectively and meets all regulatory standards.

The specific pricing terms, set-asides, and detailed funding sources are not provided in the file content accessed. However, this project represents critical infrastructure maintenance for a correctional facility's essential wastewater treatment operations. The urgency of the May 1, 2026 deadline indicates that procurement should proceed expeditiously to allow adequate time for equipment procurement, installation, testing, and commissioning of the new UV disinfection system prior to the operational deadline.

View the file

Other files

File Type Posted
EO+2019-12D.pdf PDF
EO_2022-02D (1).pdf PDF
04-Affirmation and Disclosure Form_3-4-22.pdf PDF
OhioBuys Fact Sheet for Bidders_Suppliers.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Navigate to the previous page Access to navigation history

Download public

Print

Close

Reason :

Cancel Confirm

Close messages

Hide TabsDisplay Tabs

Hide TabsDisplay Tabs

File details come from the government source that posted it. Updated .