551/20249. CDP-MSP Coldwater Detachment-Utility Improvements
Awarded State & local contract opportunity Posted
- Solicitation number
- RFQ 171 200000000379 3
- State
- Michigan
- Responses due
Opportunity facts
- Jurisdiction
- UNSPSC codes
- 72121000 New industrial building and warehouse construction services
- 72121500 Industrial plant construction services
- 72121001 Dry cleaning plant construction and remodeling service
- 72121003 Grain elevator construction and remodeling service
- 72121401 Bank building construction service
- 72121502 Mine loading and discharging station construction service
- 72121507 Tank construction and servicing
- 72121508 Preparation plant construction service
- 95122403 Warehouse store
- 72121004 Paper or pulp mill construction and remodeling service
Show all 19
- 72121501 Chemical plant construction service
- 95122402 Cold storage installation
- 95121600 Transport buildings and structures
- 72121002 Food product manufacturing or packing plant construction and remodeling service
- 72121007 Truck and automobile assembly plant constructionand remodeling service
- 72121008 Warehouse construction and remodeling service
- 95122400 Industrial buildings and structures
- 72121005 Pharmaceutical manufacturing plant construction and remodeling service
- 95122401 Workshop
Updated .
About this opportunity
The Michigan Department of Technology, Management and Budget seeks qualified contractors to perform utility improvements at the Michigan State Police Coldwater Detachment facility located at 186 East State Street, Coldwater, Michigan, under project number 551/20249.CDP. This construction project involves the abandonment of existing post sewer and well system connections, installation of new water main and water service, installation of a sewage grinder station with associated electrical upgrades, pavement repairs, HDPE pipe installation via open cut trenching and directional drilling methods, and site restoration. The scope encompasses civil engineering work including topographic surveys, demolition planning, and utility improvements, as well as electrical system upgrades including conduit and raceway installation, conductor installation, low-voltage transformer installation (3KVA with 208V primary and 240V secondary), and a 240V single-phase 1HP grinder pump system. Contractors must comply with the National Electrical Code, NEMA standards, UL requirements, local building codes, ASTM and ANSI standards, prevailing wage requirements for Branch County, and Michigan OSHA standards. The project includes staggered completion dates with water main work required within 30 calendar days of Notice to Proceed and all remaining work within 90 calendar days, with asphalt pavement and greenbelt restoration completed no later than May 14, 2021. A mandatory pre-bid conference and site tour was held on September 28, 2020 at 11:00 a.m., questions were accepted until September 30, 2020 at 5:00 p.m., and electronic bids were due October 7, 2020 at 2:00 p.m. through the SIGMA VSS website. The contract requires a lump sum base bid plus a $20,000 provisional allowance for construction contingency, with bid security equal to 5 percent of the base bid and mandatory performance and payment bonds for contracts exceeding $50,000.
Contractors bidding over $100,000 must complete a Certification of Michigan Based Business, indicating a potential set-aside or preference for Michigan-based businesses. All contractor personnel are required to undergo background checks through CJIS-008 forms to comply with Michigan State Police security protocols. Liquidated damages of $750 per calendar day will be assessed for delays beyond substantial completion dates. Insurance requirements include Commercial General Liability with a minimum $1,000,000 coverage limit, worker's compensation insurance, and employer's liability insurance, with the State of Michigan named as an additional insured. The contract documents indicate funding through code 5512231FACILITIES, though specific award values or budget ranges are not disclosed in the publicly available materials. All permit and inspection fees charged by the Coldwater Board of Public Utilities or Branch County Road Commission shall be paid by the contractor and reimbursed through the provisional allowance, while contractors remain responsible for all other permit costs.
Opportunity text
551/20249.CDP-MSP Coldwater Detachment-Utility Improvements
Files
| File | Type | Posted |
|---|---|---|
| Plans.pdf | ||
| Specifications.pdf | ||
| Addendum 1 20249.pdf | ||
| PreBid SignIn 20249.pdf | ||
| Advertisement.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity