Addendum 1 20249.pdf
PDF 138 KB Posted
- Solicitation number
- RFQ 171 200000000379 3
- Issued by
- Barry County, Michigan
About this file
This is a Construction Bid Addendum No. 1 issued by the Department of Technology, Management and Budget (DTMB), State Facilities Administration Design and Construction Division for the Coldwater MSP Detachment Utility Improvements project (File Number 551/20249.CDP). The project involves utility improvements including water main installation and sanitary sewer work, with professional engineering services provided by NFE Engineers under Project Director Chris Parsons, P.E. The addendum clarifies project requirements and phases with staggered completion dates: water main work must be completed and operational within 30 calendar days of the Notice to Proceed, sanitary sewer work must be operational within 90 calendar days, and asphalt pavement placement and greenbelt restoration must be completed no later than May 14, 2021. The bid opening date was October 7, 2020, and the addendum was issued on October 1, 2020.
The addendum specifies that permit and inspection fees charged by the Coldwater Board of Public Utilities or Branch County Road Commission shall be paid by the contractor and are eligible for direct reimbursement through a Provisional Allowance, while all other permit costs remain the contractor's responsibility. The project includes removal and disposal of a large pine tree adjacent to the water main installation on Sheet C2. Aggregate base shall be installed to top of pavement to allow winter use and snow plowing during the parking area shutdown period, then removed to permit asphalt placement in 2021. Bidders are required to acknowledge this addendum in the Bid Summary and Bid Form, with failure to do so potentially resulting in bid rejection. The addendum was approved on October 1, 2020, and becomes part of the contract documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PreBid SignIn 20249.pdf | ||
| Advertisement.pdf | ||
| Plans.pdf | ||
| Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 12/17)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
10/1/2020
PROJECT NAME
Coldwater MSP Detachment – Utility Improvements
FILE NUMBER
551/20249.CDP
PROFESSIONAL
NFE Engineers
PROJECT DIRECTOR
Chris Parsons, P.E.
BID OPENING DATE:
10/7/2020
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
• Any permit and inspection fees charged by either Coldwater Board of Public Utilities or Branch County Road Commission shall be paid by the contractor and will be eligible for direct reimbursement using the Provisional Allowance. All other permit costs shall be the responsibility of the Contractor and will not be paid for separately.
• Sheet C2 outlines the installation of water main directly adjacent to a large pine tree. The tree will require removal as a part of the installation process and removal and disposal shall be included in the project.
• The project shall include phases, with differing completion date requirements, including:
All water main work shall be completed and main shall be operational and available for Owner use within 30 Calendar Days of the issued Notice to Proceed.
All sanitary sewer work shall be completed and main shall be operational and available for Owner use within 90 Calendar Days of the issued Notice to Proceed.
All asphalt pavement placement and greenbelt restoration shall be completed no later than May 14, 2021. Aggregate base shall be installed to top of pavement to allow for use and snow plowing of the parking area during the winter shut down period, and then removed to allow for asphalt placement in 2021.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Steve Sutton DATE: 10/1/2020
APPROVED BY:
PROJECT DIRECTOR: Chris Parsons, P.E. DATE: 10/1/2020 http://www.michigan.gov/SIGMAVSS