472/25256. JBB; Alger CF - Cooler/Freezer & Roof Rplcmnt

Closed State & local contract opportunity Posted

Solicitation number
RFP-171-250000003010-3
State
Michigan
Responses due

Opportunity facts

Jurisdiction

Updated .

About this opportunity

The Michigan Department of Technology, Management and Budget (DTMB) and Department of Corrections (MDOC) are seeking professional architectural and engineering services for the Alger Correctional Facility located in Munising, Michigan. The procurement involves two primary scopes: replacing the 35-year-old warehouse cooler/freezer with updated mechanical equipment and replacing deteriorating roofs on the Spruce Housing Unit and 300 Building that are currently experiencing active leaks. The project requires comprehensive professional services including Phase 500, 600, and 700 services, with specific deliverables such as design development, construction documents, bid advertisement, and construction administration. Proposals will be evaluated by an Ad Hoc Advisory Committee, with 80% weight on the technical proposal and 20% on the cost proposal. A mandatory pre-proposal meeting was scheduled for September 10, 2025, at 10:00 a.m. EST, with proposal submissions due on September 25, 2025, at 2:00 p.m. Eastern Time. All contractor representatives must submit a Law Enforcement Information Network (LEIN) request form five business days prior to the meeting, and proposals must be uploaded to SIGMA VSS with a single attachment not exceeding 30mb.

The contract does not explicitly indicate specific set-aside designations or restrictions for disadvantaged enterprises. The project does require bidders to demonstrate they are a Michigan-based business and meet responsibility criteria, including no criminal convictions or contract terminations in the past three years. The total construction budget is $1,100,000, with $750,000 allocated for cooler/freezer replacement and $350,000 for roof replacements. Additional project requirements include replicating existing cooler/freezer alarms in the warehouse, connecting the cooler and freezer to the MDOC Starnet system, and conducting a phase 100 study of existing light pole concrete and luminaire bases to assess stability and potential replacement needs. Reimbursable items include LARA plan review ($2,000), roof coring/temporary patch ($10,000), BFS coordination ($1,000), and hazardous material testing and air monitoring ($10,000). The anticipated construction timeline is projected for spring/summer 2026, with the professional service contract aimed to start as soon as possible after contract award.

Opportunity text

472/25256.JBB; Alger CF - Cooler/Freezer & Roof Rplcmnt

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity