The state of Michigan, through the Department of Technology, Management & Budget (DTMB) on behalf of the Michigan Department of Corrections, is seeking proposals for a Phase 100 Electrical Infrastructure Assessment at the Newberry Correctional Facility in Luce County, Michigan. The project scope includes a comprehensive evaluation of the facility's primary loop, distribution gear, transfer switches, substation equipment, and lightning arrestors, which have been experiencing failures due to outdated equipment. The selected professional services contractor will be required to provide planning, assessment, and recommendations for upgrading the electrical infrastructure to meet current code requirements. A mandatory pre-proposal meeting is scheduled for June 14, 2023, and proposals are due by June 29, 2023, with a contract expected to be awarded within 30 days. The proposal will be evaluated 80% on technical qualifications and 20% on cost, and the selected firm must be licensed to practice in Michigan.

The RFP does not mention any set-aside designations or restrictions on the types of organizations that can respond. The incumbent contractor is not identified, and the project's funding source and requirements are not detailed in the provided information. The RFP indicates that consultants and testing can be included as reimbursable expenses, but it does not provide a specific award value or budget range.

Files

File Type Posted
23312 Project Statement.pdf PDF
23312 RFP Billable Rate.pdf PDF
SAMPLE Billable Rate Contract (Rev 221207).pdf PDF
23312 LEIN Request.pdf PDF
23312 Addendum 1.pdf PDF
23312 Facility One Line Diagram.pdf PDF