26-022 Construction Manager At Risk for Fire Stations No. 1 and No. 4
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66098-NONST-2026-000000110
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 90638 General Construction - Architectural
- 90924 Building Construction, Commercial And Institutional
- 91114 C.i.p., Construction Contingency
- 91116 C.i.p., Construction/Rehabilitation, Buildings
- 91147 C.i.p., Preconstruction Reimbursable
- 91148 C.i.p., Pre-Construction Services
- 91831 Construction Consulting
- 92544 General Construction: Management, Scheduling, Cost Estimation - Engineering
- UNSPSC codes
- 72121100 Commercial and office building construction services
- 95121700 Public buildings and structures
- 72111104 New dormitory construction service
- 72111105 New hotel or motel construction service
- 72121101 Commercial and office building new construction service
- 72141128 Public square construction and or remodelling service
- 95121702 Police station
- 95121603 Bus station
- 95122106 Hostel
- 95121505 Shopping center
Show all 34
- 95121504 Shop building
- 95121714 Public changing room and shower facility
- 95121507 Market
- 95121706 Ambulance station
- 72121105 Shopping center and mall construction service
- 72141401 Detention facility construction service
- 95121604 Bus garage
- 95121607 Railway depot
- 95121605 Automotive repair or servicing building
- 95121711 Civic center
- 95121500 Commercial and entertainment buildings and structures
- 95121704 Prison building
- 95121503 Cafeteria
- 95121703 Court building
- 95121606 Railway station
- 95121701 Post office
- 72141400 Detention facility construction and repair services
- 72121104 Restaurant construction service
- 95121712 Art gallery
- 95121608 Underground railway station
- 95121501 Shopping mall
- 95121715 Public toilet facility
- 95121506 Theater
- 95121705 Fire station
- Point of contact
-
- Edward McAdoo emcadoo@sandyspringsga.gov (770) 206-1448
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Sandy Springs, Georgia, is seeking Statements of Qualifications from Construction Manager at Risk (CM at Risk) firms through a two-phase procurement process for the renovation/replacement and new construction of two fire stations. Fire Station No. 1 is a 20,500 square-foot replacement facility at 1425 Spalding Drive, while Fire Station No. 4 is a 20,500 square-foot new facility at 5275 Roswell Road; both will be two-story structures with three-bay apparatus bays, support areas, living quarters, and associated spaces constructed with structural steel frames, metal studs, concrete masonry units, brick, and metal composite panels. Respondents must demonstrate a minimum bonding capacity of $30 million per project, possess a Georgia Commercial General Contractors License, and include a Georgia Business License in their qualifications submission. The CM will function as a consultant during early design phases, providing input on constructability, schedule, cost analysis, and value management, and must deliver a guaranteed maximum price (GMP) before completion of construction documents in an open-book contract format where all estimates, subcontractor quotes, subcontracts, and financial reports are available to the City. Phase 1 responses are due by January 22, 2026, at 2:00 PM EST through the Bonfire Interactive portal, with written questions due by January 6, 2026 and answers posted by January 12, 2026; award is expected in February 2026, with schematic drawings provided to shortlisted firms before Phase 2 presentations, Fire Station No. 4 construction commencing in September 2026, and Fire Station No. 1 beginning approximately two months thereafter. Respondents must complete all exhibits except Exhibits F and G, with failure to do so resulting in non-responsiveness, and cost proposals are not required during the qualifications phase.
The procurement does not indicate specific set-aside designations for disadvantaged enterprises or restrictions limiting the types of organizations that can respond. Respondents must comply with extensive insurance requirements, including workers' compensation, commercial general liability insurance with a $2,000,000 minimum, professional liability insurance with a $3,000,000 minimum, builders risk insurance, and fidelity bonds. Additional mandatory compliance requirements include E-Verify registration, Georgia Security and Immigration Compliance Act compliance, drug-free workplace certification, and adherence to all federal and state laws, including the Civil Rights Act of 1964 and Americans with Disabilities Act. The City's architect, Hussey Gay Bell, will provide design and contract administration support throughout the project. No pricing information is established in this qualifications phase; pricing will be determined during Phase 2 proposals. The contract will extend through project completion upon written approval of the City and successful Respondent, with no specific budget range or award value disclosed in the initial solicitation.
Opportunity text
This is a qualifications and proposal based procurement process. The purpose of this RFQC is to seek Statements of Qualifications from highly qualified contractors to provide all personnel, materials, equipment, labor and services necessary to perform Construction Management at Risk (¿CM at Risk¿) services for Fire Stations No. 1 and No. 4, as more fully described in Section 3 of this RFQC. Firms submitting Responses shall follow the process described herein. The City intends to enter into a contract with the successful Respondent to complete the Project in accordance with the terms, conditions, and specifications contained in this RFQC.
Files
| File | Type | Posted |
|---|---|---|
| Addendum 1.pdf | ||
| Construction Manager At Risk for Fire Station.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity