25CRDLWBMALDR-002 - Pammel SP, Harmon Tunnel Repairs (26-04-61-01) REBID

Awarded State & local contract opportunity Posted

Solicitation number
25CRDLWBMALDR-002 REBID
State
Iowa
Responses due

Opportunity facts

Jurisdiction

Updated .

About this opportunity

The Iowa Department of Natural Resources (DNR) is seeking architectural and engineering services for a critical preservation project at Pammel State Park's historic Harmon Tunnel. This Request for Proposal (RFP) solicits a qualified Architectural, Engineering, and Construction (AEC) firm to design repairs for the tunnel's stone facade and retaining walls, with a primary focus on maintaining the site's historical integrity. The project requires a comprehensive design approach that minimizes demolition, prioritizes material reuse, and ensures compliance with the Secretary of the Interior Standards for Rehabilitation. Proposals are due on November 19, 2025, at 4:00 PM CST, and must include separate technical and cost proposal files. The tunnel, originally hand-dug by a mill operator and later expanded by Civilian Conservation Corps veterans in the 1930s, represents a unique vehicular highway tunnel in Iowa that demands specialized preservation techniques. Prospective firms must demonstrate expertise in historical restoration, architectural conservation, and detailed documentation of proposed repair methodologies. All proposed repair work will undergo review by the State Historic Preservation Office (SHPO) to ensure historical accuracy and preservation standards.

While the RFP does not explicitly specify set-aside designations or disadvantaged enterprise requirements, interested firms must thoroughly document their technical capabilities and proposed approach to the tunnel's restoration. The contract represents a rebid of a previous solicitation, suggesting potential prior interest from engineering and architectural firms specializing in historical infrastructure restoration. Although no specific budget range is mentioned in the available documentation, the complexity of preserving a hand-dug, historically significant tunnel implies a substantial project investment. The primary point of contact for this RFP is Colton Lullmann, who can provide additional details about the solicitation. Firms interested in this opportunity should carefully review the full contract terms and conditions available on the Iowa DNR website, paying close attention to the nuanced requirements for historical preservation and minimal intervention strategies. The project's success will depend on a contractor's ability to balance technical restoration expertise with a deep respect for the tunnel's historical significance.

Opportunity text

Architectural & Engineering services from a qualified AEC firm for the design of the repair of architectural stone façade and retaining walls for Harmon Tunnel at Pammel State Park in Madison County.

Files

File Type Posted
RFP - Exceptions Form.docx DOCX document
25CRDLWBMALDR-002 Pammel Harmon Tunnel-IMPACS RFP REBID.pdf PDF
1344765-event.pdf PDF
25CRDLWBMALDR-002 - Cost Proposal.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors