25-043 S2102 ITS Fire Station #3

Closed State & local contract opportunity Posted

Solicitation number
PE-66098-NONST-2025-000000086
State
Georgia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The City of Sandy Springs in Fulton County, Georgia, is seeking a pre-qualified Prime Contractor for the S2102 ITS Fire Station #3 project, which involves installing advanced fiber optic infrastructure. The procurement will implement a comprehensive telecommunications network, including over 8,500 linear feet of conduit, more than 5,400 linear feet of 144-fiber optic cable, and associated networking equipment such as fiber distribution cabinets, field switches, and modules. The project requires directional bore installation methods connecting intersections along Heards Ferry Drive, utilizing communication infrastructure improvements for the municipal fire station. Bidders must be pre-qualified by the Georgia Department of Transportation and capable of performing at least 51% of the work directly. The bid is due on June 17, 2025, at 2:00 PM EST, with a non-mandatory pre-bid conference scheduled for May 22, 2025, at 11:00 AM. Evaluation will likely consider technical capability, compliance with specifications, and adherence to project requirements.

The contract is funded through the Sandy Springs Transportation Special Purpose Local Option Sales Tax (TSPLOST) program, with a project duration of 365 calendar days from the Notice to Proceed. While no specific disadvantaged enterprise requirements are explicitly detailed, contractors must submit comprehensive documentation including bid bonds, insurance certificates, drug-free workplace certifications, and immigration compliance forms. The project includes a $40,000 miscellaneous construction allowance and provisions for liquidated damages of $500 per day for unexcused project delays. The city will provide field switches, which the selected contractor will be responsible for installing. Though a specific total contract value is not specified, the extensive infrastructure work and technological components suggest a significant investment in municipal communications infrastructure. The project is entirely located within Congressional District No. 13 and will require coordinating with local utility services to ensure minimal disruption to existing communications and transportation systems.

Opportunity text

This project includes installation of new fiber from the intersection of Heards Ferry Drive and Riverside Drive to the intersection of Heards Ferry Drive and Raider Drive to the City of Sandy Springs Fire Station #3. The project will install the new fiber via directional bore and will include more than 8,500 LF of conduit, more than 5,400 LF of 144 fiber optic cable, and other associated appurtenances such as FDCs, field switches, and modules as required. The project is to be funded through the Sandy Springs TSPLOST funding.

Files

File Type Posted
0016272 ITS Sandy Springs Firestation _3 (sta.pdf PDF
Special Provisions.pdf PDF
25_043 S2102 ITS Fire Station _3.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity