0016272 ITS Sandy Springs Firestation _3 (sta.pdf
PDF 7 MB Posted
- Attached to
- 25-043 S2102 ITS Fire Station #3
- Solicitation number
- PE-66098-NONST-2025-000000086
- Issued by
- Fulton County, Georgia
About this file
The project involves Intelligent Transportation Systems (ITS) infrastructure installation for City of Sandy Springs Fire Station #3, located in Fulton County, Georgia. The project encompasses fiber optic cable installation, conduit work, and communications infrastructure along Heards Ferry Road NW, Riverside Drive, and Raider Drive, with a project length of 0.790 miles. The work includes installing 144-fiber loose tube single-mode fiber optic cables, directional boring, conduit placement, pull boxes, splice closures, and associated communications equipment at the fire station and along the specified roadways. The project is designed to enhance municipal communications infrastructure and is scheduled for completion by August 12, 2024.
The project is funded through the City of Sandy Springs Public Works Department and will be executed by Atlas Technical Consultants. The total project is located 100% within Congressional District No. 13 and will involve coordinating with local utility services, maintaining existing traffic signal and communications infrastructure, and ensuring minimal disruption to current operations. The design incorporates Georgia State Highway Department standards, includes erosion control measures, and requires specific coordination with city departments for field switch selection and communication downtime management. The contract appears to be a lump sum bid with comprehensive requirements for installation, splicing, and integration of fiber optic communications systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Special Provisions.pdf | ||
| 25_043 S2102 ITS Fire Station _3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
28-0001
PROJECT LOCATION
@ RIVERSIDE DR
HEARDS FERRY DR NW
PROJECT LIMITS BEGIN
STATION 00+00.00
@ RIVERSIDE DR
HEARDS FERRY DR NW
PROJECT LIMITS BEGIN
STATION 07+78.02
RAIDER DR @ FIRESTATION #3
PROJECT LIMITS END
8/12/2024
Kyle.Wagner
GPLOT-ORD
gplotborder-ORD-PO.tbl
28-0001.dgn
5:51:55 PM
GPLN4/28/2016
DRAWING No.
P.I. No.
770.263.5945 Duluth, Georgia 30096
Suite 100 2450 Commerce Avenue
150 600
SCALE IN FEET
0 300
0016272
PLANS COMPLETED 08-12-2024
PLANS PREPARED BY:
APPROVAL BY:
RECOMMENDED FOR
CITY OF SANDY SPRINGS
ATLAS TECHNICAL CONSULTANTS
OF GEORGIA AND SHALL BE DEEMED TO MEAN THE DEPARTMENT OF TRANSPORTATION.
OR "DEPARTMENT" WHEN THE CONTEXT THEROF MEANS THE STATE HIGHWAY DEPARTMENT
DEPARTMENT", "GEORGIA STATE HIGHWAY DEPARTMENT", "HIGHWAY DEPARTMENT",
THIS DOCUMENT TO "STATE HIGHWAY DEPARTMENT OF GEORGIA", "STATE HIGHWAY
DOCUMENTS, DRAWINGS OR PHOTOGRAPHS USED TO BE USED IN CONNECTION WITH
ALL REFERENCES IN THIS DOCUMENT, WHICH INCLUDES ALL PAPERS, WRITINGS,
NOTE:
102.04.102.05 AND 104.03 OF THESPECIFICATIONS.
TRANSPORTATION IN ANYWAY THE ATTENTION OF BIDDER IS SPECIFICALLY DIRECTED TO SUBSECTIONS
SAME ARE SHOWN AS INFORMATION ONLY, ARE NOT GUARANTEED AND DO NOT BIND THE DEPARTMENT OF
FIELD INVESTIGATIONS AND ARE BELIEVED TO BE INDICATIVE OF ACTUAL CONDITIONS, HOWEVER, THE
INDICATED THEREBY, WHETHER BY DRAWINGS OR NOTES, OR IN ANY OTHER MANNER, ARE BASED UPON
THE DATA TOGETHER WITH ALL OTHER INFORMATION SHOWN ON THESE PLANS OR IN ANYWAY
OF 1988.
AMERICAN VERTICAL DATUM (NAVD)
1983)/94 WEST ZONE AND THE NORTH
COORDINATE SYSTEM OF 1984 (NAD
USING THE HORIZONTAL GEORGIA
THIS PROJECT HAS BEEN PREPARED
REVISIONS
GROSS LENGTH OF PROJECT
NET LENGTH OF EXCEPTIONS
NET LENGTH OF PROJECT
NET LENGTH OF BRIDGES
NET LENGTH OF ROADWAY
LENGTH OF PROJECT
MILES
COUNTY No. 121
0016272
Project No.
HEARDS FERRY RD NW -MAJOR COLLECTOR
RAIDER DR AND RIVERSIDE DR - MINOR ARTERIAL
100% IN CONG. DIST. NO. 13
FULTON COUNTY AND IS
THIS PROJECT IS 100% IN
LOCATION SKETCH
DESIGN DATA:
SPEED DESIGN: 35 mph
R I
V E R S I
D E
R
RAIDER DR
H E
A R
D S
C R E
K
R I
V E
R S I
PUBLIC WORKS DEPARTMENT
CITY OF SANDY SPRINGS
ITS FIRESTATION #3
ITS PLANS
FEDERAL ROUTE # N/A
STATE ROUTE # N/A
HEARDS FERRY DR NW
RAIDER DR
HEARDS FERRY DR NW
H E
A R
D S
C R E
S V
C
PB
PB
00.790 MILES
00.790 MILES
00.790 MILES
00.000 MILES
00.000 MILES
+0
+0
+0
+0
+0
Robinson.Nicol Image
ITS PLANS
28-0002
REVISION DATES
3/31/2025
Kyle.Wagner
GPLOT-ORD
28-0002 -Dino's Copy.dgn
5:29:13 PM
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
ITS FIRESTATION #3
CITY OF SANDY SPRINGS
0016272
DRAWING NO. DESCRIPTION DRAWING NO. DESCRIPTION
28-0001
28-0002
28-0003
28-0004
28-0005
28-0006
28-0007 - 28-0009
28-0012
28-0013
28-0014 - 28-0016
28-0010 - 28-0011
ITS PLANS
FIRESTATION LAYOUT
COVER
INDEX
GENERAL NOTES
LEGEND
QUANTITIES
LAYOUT
SPLICING DIAGRAM
FIBER ALLOCATION TABLE
CONSTRUCTION DETAIL
52-0001
52-0002
52-0003
52-0004
52-0005
52-0006
52-0007
EROSION CONTROL LEGEND & UNIFORM CODE SHEET
EC-L1: EROSION CONTROL & UNIFORM CODE SHEET(SHEET 1 OF 7)(03/2017)
EC-L2: EROSION CONTROL & UNIFORM CODE SHEET(SHEET 1 OF 7)(11/2018)
EC-L3: EROSION CONTROL & UNIFORM CODE SHEET(SHEET 1 OF 7)(03/2017)
EC-L4: EROSION CONTROL & UNIFORM CODE SHEET(SHEET 1 OF 7)(03/2017)
EC-L5: EROSION CONTROL & UNIFORM CODE SHEET(SHEET 1 OF 7)(03/2017)
EC-L6: EROSION CONTROL & UNIFORM CODE SHEET(SHEET 1 OF 7)(11/2018)
EC-L7: EROSION CONTROL & UNIFORM CODE SHEET(SHEET 1 OF 7)(03/2017)
54-0001 TYPICAL BMP DETAIL
28-0003
Kyle.Wagner
GPLOT-ORD
28-0003 - Dino's Copy.dgn
1:59:57 PM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
0016272
ITS GENERAL NOTES
THE PROJECT. (CITY WILL PROVIDE FIELD SWITCH)
13. THE CONTRACTOR SHALL COORDINATE WITH THE CITY OF SANDY SPRINGS DEPARTMENT OF PUBLIC WORKS FOR INSTRUCTIONS ON WHAT BRAND OF FIELD SWITCH TO USE FOR
CONSTRUCTION WORK BEING PERFORMED.
ANY REQUIRED COMUNICATION DOWNTIME NEEDED FOR FOC SPLICING WITH COSS DEPT OF PUBLIC WORKS A MINIMUM OF 14 DAYS IN ADVANCE OF SCHEDULES
THE CONTRACTOR SHALL MAINTAIN COMMUNICATIONS TO RIVERSIDE DR / HEARDS FERRY RD NW AND RAIDER DR / FIRESTATION #3 AT ALL TIMES. CONTRACTOR SHALL COORDINATE 12.
CABLES WTIH THE FOLLOWING INFORMATION CAUTION FIBER OPTIC CABLE XXF CITY OF SANDY SRINGS (XX DENOTES FIBER COUNT. TO BE ATTACHED TO PROPOSED FIBER OPTIC
THE CONTRACTOR SHALL COORDINATE WITH THE CITY OF SANDY SPRINGS DEPARTMENT OF PUBLIC WORKS AT 770.730.5600 TO PICK-UP PROVIDED LABELS/TAGS 11.
10. ALL TRAFFIC CONTROL SHALL BE PAID FOR UNDER THE ITS LUMP SUM BID.
LUMP SUM BID. SEE DETAILS
9. ALL EROSION CONTROL MEASURES REQUIRED TO ENSURE COMPLIANCE WITH STATE AND FEDERAL LAW, REGULATIONS AND GUIDELINES SHALL BE PAID FOR UNDER THE ITS
ALL PULLBOX LIDS SHALL BE LABELED COSS COMMMUNICATIONS. 8.
COMMUNICATIONS SERVICES TO EXISTING TRAFFIC SIGNALS AND CCTV CAMERAS.
7. THE CONTRACTOR SHALL INCLUDE IN THE LUMP SUM BID, ALL COSTS ASSOCIATED WITH MODIFYING EXISTING COMMUNICATIONS SERVICES AND ESTABLISHING NEW
QUANTITIES SHOWN IN THE PLAN ARE FOR INFORMATION ONLY.
6. THE CONTRACTOR SHALL DETERMINE THE MATERIALS AND QUANTITIES REQUIRED TO CONSTRUCT THE PLAN AS SHOWN FOR A LUMP SUM BID. THE LIST OF MATERIALS AND
SHALL INCLUDE THE COSTS AS PART OF THE ITS LUMP SUM BID.
GRASSING, UTILITY SERVICE LINE, STORM DRAIN PIPE, MASONRY WALL AND PAVING THAT IS REMOVED, DAMAGED OR DESTROYED DUE TO CONTRACTORS ACTIVITY. THE CONTRACTOR
5. THE CONTRACTOR SHALL REPLACE IN KIND ANY SIZE, ANY BARRIER WALL, FENCE, SITCH PAVING, CURBING, SIDEWALK, GUTTER, SLOPE PAVEMENT, SIGN, GUARDRAIL, LANDSCAPING, INOPERABLE DURING CONSTRUCTION, THE CONTRACTOR SHALL FIRST NOTIFY THE CITY OF SANDY SPRINGS DEPARTMENT OF PUBLIC WORKS AT 770.730.5600.
GDOT SPECIAL PROVISION 150 REGARDING RESONSIBILITIES. IF ANY PART OF THE EXISTING TRAFFIC SIGNALS OR COSS COMMUNICATIONS INFRASTRUCTURE SHOULD BECOME
THE PROJECT LIMITS DURING CONSTRUCTION UNTIL FINAL ACCEPTANCE. THE CONTRACTOR SHALL MAKE REFERENCE TO GDOT SPECIFICATION SECTIONS 104 AND 107 AND
4. THE CONTRACTOR SHALL MAINTAIN THE FULL FUNCTIONALITY AND OPERATION OF ALL EXISTING TRAFFIC SIGNALS AND COSS COMMUNICATIONS INFRASTRUCTURE WITHIN
AT 770.730.5600 PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY.
3. THE CONTRACTOR SHALL CONTACT THE 811 UTILITY LOCATION SERVICE AT 1-800-282-7411 AND THE CITY OF SANDY SPRINGS DEPARTMENT OF PUBLIC WORKS
770.730.5600 PRIOR TO FINAL ACCEPTANCE.
2. THE COMPLETED INSTALLATION SHALL BE CHECKED AND ACCEPTED BY THE CITY OF SANDY SPRINGS DEPARTMENT OF PUBLIC WORKS AT
CITY OF SANDY SPRINGS SPECIAL PROVISIONS 108, AND 210 THE NATIONAL ELECTRIC CODE (NEC).
1. THE COMPLETED INSTALLATION SHALL CONFORM TO GDOT STANDARDS AND DETAILS, GDOT STANDARD SPECIFICATIONS 615, 682, 935, AND
28-0004
8/9/2024
Kyle.Wagner
GPLOT-ORD
28-0004.dgn
1:50:45 PM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
0016272
EXISTING UTILITIES COMMUNICATION ITEMS
EX. SD MANHOLE
EX. DROP INLET
EX. CATCH BASIN
EX. STORM DRAIN
EX. UG CABLE TV
EX. OH CABLE TV
EX. UG TELEPHONE
EX. TELEPHONE POLE
EX. OH TELEPHONE
EX. TELEPHONE MH
EX. SS MANHOLE
EX. SANITARY SEWER
EX. WATER VALVE
EX. WATER METER
EX. FIRE HYDRANT
EX. WATER LINE
EX. GAS VALVE
EX. GAS METER
EX. GAS LINE
EX. UG ELECTRIC
EX. TRANSFORMER
EX. POWER POLE
EX. OH ELCTRIC
EXISTING GUY WIRE
PROPOSED GUY ASSEMBLY
PROPOSED SIGNAL CABINET
EXISTING SIGNAL CABINET
PROPOSED AERIAL SLACK LOOP
EXISTING AERIAL SLACK LOOP
EXISTING AERIAL CLOSURE
PROPOSED AERIAL CLOSURE
EXISTING CONDUIT W/ PROPOSED UNDERGROUND COMMUNICATIONS
PROPOSED UNDERGROUND TRENCHED FIBER COMMUNICATIONS
PROPOSED BORE W/ UNERGROUND FIBER COMMUNICATIONS
EXISTING UNDERGROUND FIBER COMMUNICATIONS
EXISTING AERIAL FIBER COMMUNICATIONS
PROPOSED AERIAL FIBER COMMUNICATIONS
PROPOSED TYPE 7 PULL BOX
PROPOSED TYPE 6 PULL BOX
PROPOSED TYPE 2 PULL BOX
EXISTING STRAIN POLE
EXISTING CCTV CAMERA
PROPOSED CCTV CAMERA
SD
WV
WM
FH
GV
GV
28-0005
Kyle.Wagner
GPLOT-ORD
28-0005 - Copy 3-26-25.dgn
2:02:53 PM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
0016272
28-0006
PB
PB
00+00
01+ 00
02+00
03+00
04+00
05 +00
06+00
07+00
07+00
08 +00
09 +00
10+0011+0012 +00
1 3+00
14+00
15+00
16+00
1 7+0018+0 0
19+00
20 +00
21 +00
22+ 00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
01+00
02+00
03+00
04+00
05+00
06+00
07+00
08+00
09+00
DATE$$$
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN4/28/2016
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
0016272
150 600
SCALE IN FEET
0 300
770.263.5945 Duluth, Georgia 30096
RAIDER DR
H E
A R
D S
C R E
R I
V E
R S I
R I
V E R S I
HEARDS FERRY DR NW
HEARDS FERRY DR NW
SHEET 28-0007SHEET 28-0008
SHEET 28-0009
28-0007
M A
T C
H L
IN
E
S H
E E
T
-0
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN4/28/2016
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
50 200
0 100
ITS FIRESTATION #3
CITY OF SANDY SPRINGS
ITS LEGEND
0016272
HEARDS FERRY RD NW
HEARDS FERRY RD NW
R I
V E
R S I
R I
V E
R S I
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (560 LF)
CONDUIT, NM, TP 3, 2-2 IN (1120 LF)
5 IN DIRECTIONAL BORE (560 LF)
INSTALL:
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (750 LF)
CONDUIT, NM, TP 3, 2-2 IN (1500 LF)
5 IN DIRECTIONAL BORE (750 LF)
INSTALL:
SEE DETAIL #7
DETAIL #7
PB
PROPOSED TYPE 7 PULL BOX
EXISTING PULL BOX
EXISTING SIGNAL CABINET
FIBER COMMUNICATION
PROPOSED BORE W/ UNDERGROUND
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (110 LF)
PULLBOX, TP 7
INSTALL:
SEE THE SPLICING DIAGRAM SHEET FOR SPLICING DETAILS
SPLICE REMAINING 48F TRUNK FIBERS TO PROPOSED 144F TRUNK FIBERS
FIBER OPTIC SPLICE, FUSION, (68 EA)
OSP, F/O CABLE, LOOSE TUBE, SM, 144 FIBER (110 LF)
OSP, F/O CABLE, DROP, SM, 12 FIBER (55 LF)
REPLACE WITH F/O CLOSURE, UNDERGROUND, 144 FIBER (1 EA)
INSTALL:
OSP, F/O CABLE, LOOSE TUBE, SM, 48 FIBER
OSP, F/O CABLE, DROP, SM, 6 FIBER
F/O CLOSURE, UNDERGROUND, 48 FIBER WITH SPLICES
IN EXISTING PULLBOX:
SFP, FIBER MODULE, TYPE 1 (1 EA)
FIELD SWITCH, TYPE B (3 PORT)(CITY WILL PROVIDE FIELD SWITCH)
FIBER PATCH CORDS LC TO LC INCLUDED PER GDOT SPEC 935
REPLACE WITH FIBER PATCH PANEL, WALL MOUNTED, 12 FIBER.
INSTALL:
FIELD SWITCH WTIH 2 SFP TYPE 1
FIBER PATCH PANEL, WALL MOUNTED, 6 FIBER
IN EXISTING CABINET:
EXIST R/W
EXIST R/W EXIST R/W
EXIST R/W
EXIST R/W
EXIST R/W
PB
PB
M A
T C
H L
IN
E
S H
E E
T
-0
MATCHLINE SHEET 28-0009
M A
T C
H L
IN
E
S H
E E
T
-0
28-0008
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN4/28/2016
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
0 100
ITS FIRESTATION #3
CITY OF SANDY SPRINGS
ITS LEGEND
0016272
HEARDS FERRY RD NW
HEARDS FERRY RD NW
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (190 LF)
CONDUIT, NM, TP 3, 2-2 IN (380 LF)
5 IN DIRECTIONAL BORE (190 LF)
INSTALL:
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (110 LF)
PULLBOX, TP 7
INSTALL:
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (740 LF)
CONDUIT, NM, TP 3, 2-2 IN (1480 LF)
5 IN DIRECTIONAL BORE (740 LF)
INSTALL:
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (110 LF)
PULLBOX, TP 7
INSTALL:
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (575 LF)
CONDUIT, NM, TP 3, 2-2 IN (1150 LF)
5 IN DIRECTIONAL BORE (575 LF)
INSTALL:
PB
PROPOSED TYPE 7 PULL BOX
EXISTING PULL BOX
EXISTING SIGNAL CABINET
FIBER COMMUNICATION
PROPOSED BORE W/ UNDERGROUND
EXIST R/W
EXIST R/W
EXIST R/W
EXIST R/WEXIST R/W
EXIST R/W
S V
C
S V
C
S V
CS
V
C
S V
C
S V C
S V
C
S V
C
S V
C
S V
C
MAT
CH
LI
NE
S
HE
ET
8-
MATCHLINE SHEET 28-0007
28-0009
FIRESTATION #3
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
R
E F
R
E F
R
E F
R
E F
R
E F
Design File and Plot Substitution information
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN4/28/2016
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
0 100
ITS FIRESTATION #3
CITY OF SANDY SPRINGS
ITS LEGEND
0016272
RAIDER DR
H E A R D S
F E R R Y
R D
N
W
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (110 LF)
PULLBOX, TP 7
INSTALL:
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (110 LF)
PULLBOX, TP 7
INSTALL:
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (500 LF)
CONDUIT, NM, TP 3, 2-2 IN (1000 LF)
5 IN DIRECTIONAL BORE (500 LF)
INSTALL:
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (110 LF)
PULLBOX, TP 7
INSTALL:
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (20 LF)
CONDUIT, NM, TP 3, 2-2 IN (40 LF)
5 IN DIRECTIONAL BORE (20 LF)
INSTALL:
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (410 LF)
CONDUIT, NM, TP 3, 2-2 IN (820 LF)
5 IN DIRECTIONAL BORE (410 LF)
INSTALL:
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (230 LF)
CONDUIT, NM, TP 3, 2-2 IN (460 LF)
5 IN DIRECTIONAL BORE (230 LF)
INSTALL:
OSP F/O CABLE, DROP, SM, 12 FIBER (40 LF)
CONDUIT, NM, TP 3, 2-2 IN 80 LF)
5 IN DIRECTIONAL BORE (40 LF)
INSTALL:
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (125 LF)
CONDUIT, NM, TP 3, 2-2 IN (250 LF)
5 IN DIRECTIONAL BORE (125 LF)
INSTALL:
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (110 LF)
PULLBOX, TP 7
INSTALL:
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (75 LF)
CONDUIT, NM, TP 3, 2-2 IN (150 LF)
5 IN DIRECTIONAL BORE (75 LF)
INSTALL:
DETAIL #9A
SEE DETAIL #9A
SEE DETAIL #9
DETAIL #9
OSP F/O CABLE, DROP, SM, 12 FIBER (55 LF)
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (110 LF)
F/O SPLICE FUSION (1 EA) (4 ACTUAL SPLICES)
F/O CLOSURE, UNDERGROUND, 12 FIBER, (1 EA)
PULLBOX, TP 7 (1 EA)
INSTALL:
OSP F/O CABLE, LOOSE TUBE, SM, 144 FIBER (110 LF)
PULLBOX, TP 7
INSTALL:
PROPOSED TYPE 7 PULL BOX
EXISTING PULL BOX
EXISTING SIGNAL CABINET
FIBER COMMUNICATION
PROPOSED BORE W/ UNDERGROUND
PB
SFP FIBER MODULE, TYPE 1 (2 EA)
FIBER PATCH CORDS LC TO LC INCLUDED PER GDOT SPEC 935
FIBER PATCH PANEL, WALL MOUNT, 12 PORT (1 EA)
INSTALL IN EXISTING CABINET:
E X I S T
R
W
E X I S T
R
W
E X I S T
R
W
EX
IS
T R/
W
EXI
ST
R/W
EXIST R/W
F E
N C
P B
P B
+0
+0
+0
+0
+0
+0
+0
28-0010
2/7/2025
Kyle.Wagner
GPLOT-ORD
28-0010_firestation - Dino's Copy.dgn
Design File and Plot Substitution information
11:55:36 AM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
0016272
ON THE NEXT SHEET
BRICK AND ROUTE TO THE COMMUNICATIONS ROOM AS SHOWN
ON THE OUTSIDE OF THE BUILDING AND PUSH THROUGH THE
CONTRACTOR SHALL STRAP THE 2 INCH CONDUIT AS SHOWN
17 FT
NOT TO SCALE
ALL 90 DEGREE COUPLINGS SHALL BE INCLUDED IN THE COST OF THE RIGID CONDUIT.
NOTE:
28-0011
Kyle.Wagner
GPLOT-ORD
28-0011_firestation Dino's Copy 3-26-25.dgn
5:42:39 PM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
0016272
FIRESTATION #3
ROOM
COMMUNICATION
ROOM
ELECTRICAL
FIRE ENGINE BAY
CONDUIT FROM BREAKER BOX TO POWER OUTLET
CONTRACTOR SHALL ROUTE 1 INCH RIGID
OUTLET ON WALL BY PROPOSED RACK
CONTRACTOR TO INSTALL POWER
SFP, FIBER MODULE, TYPE 2 (2 EA)
FILED SWITCH, TYPE E, (1 EA)
F/O CLOSURE, RACK MOUNTED, 144 FIBER (1 EA)
PROPOSED WALL MOUNTED RACK
INSTALL
30 FT
25 FT
10 FT
60 FT
NOT TO SCALE
ALL 90 DEGREE COUPLINGS SHALL BE INCLUDED IN THE COST OF THE RIGID CONDUIT.
NOTE:
SEE NOTE
AND LAYER 3 SWITCH
COMMUNICATION ROOM AND INSTALL THE RACK FOR A 144 FDC
CMU BLOCK AT THE CEILING TO THE ELECTRICAL ROOM TO
CONTRACTOR SHALL ROUTE 2 INCH RIGID CONDUIT ALONG THE
FOR POWER OR USE EXISTING SPARE CIRCUIT BREAKER
CONTRACTOR SHALL INSTALL BREAKER SWITCH
EXISTING PANEL BOARD
28-0012
R
IV
E R
S
ID
E D
R
COMM ROOM
FIRESTATION
144 FDC
FIRESTATION #3
SPLICE CLOSURE
UNDERGROUND
T O
I -2
S T
O R
IV
E
R V
A L
L E
Y R
D
HEARDS FERRY DR NW
AT RIVERSIDE DR
HEARDS FERRY
R A
ID
E
R D
R
SPLICE CLOSURE
UNDERGROUND
S
M F
C O
S S
-S
-D
12 FDC
EXISTING 48 SMF BLUE TUBE OF THE 48
COSS-SO01 144 SMF SLATE/GRAY TUBE OF 144 SMF
COSS-SO01 144 SMF BLUE TUBE OF 144 SMF
S
M F
C O
S S
-S
-D
12 FDC
AT RAIDER DR
HEARDS FERRY
COSS-SO01 144 SMF ORANGE, GREEN, BROWN, TUBES OF 144 SMF
COSS-SO01 144 SMF BLACK, RED, WHITE, TUBES OF 144 SMF
T O
F
2/7/2025
Kyle.Wagner
GPLOT-ORD
28-0012 - Dino's Copy.dgn
12:05:04 PM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
HEARDS FERRY RD NW
0016272
ALL 144 FIBERS TO 144 FDC
CONTRACTOR SHALL TERMINATE
ORANGE,GREEN,BROWN
48 FIBER TUBES
EXISTING REMAINING
TO 144 FDC
28-0013
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
R
E F
R
E F
R
E F
R
E F
R
E F
Design File and Plot Substitution information
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN4/28/2016
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
HEARDS FERRY RD NW
28-0014
Kyle.Wagner
GPLOT-ORD
28-0014.dgn
5:09:45 PM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
28-0015
Kyle.Wagner
GPLOT-ORD
28-0015.dgn
4:51:51 PM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
28-0016
Kyle.Wagner
GPLOT-ORD
28-0016.dgn
5:03:19 PM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
52-0001
Kyle.Wagner
GPLOT-ORD
52-0001.dgn
3:53:56 PM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
52-0002
Kyle.Wagner
GPLOT-ORD
52-0002.dgn
3:58:44 PM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
52-0003
Kyle.Wagner
GPLOT-ORD
52-0003.dgn
4:05:11 PM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
52-0004
Kyle.Wagner
GPLOT-ORD
52-0004.dgn
4:09:20 PM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
52-0005
Kyle.Wagner
GPLOT-ORD
52-0005.dgn
4:12:59 PM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
52-0006
Kyle.Wagner
GPLOT-ORD
52-0006.dgn
4:18:32 PM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
52-0007
Kyle.Wagner
GPLOT-ORD
52-0007.dgn
4:21:38 PM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
BMP LOCATION DETAILS
MAT
CH
LI
NE
S
HE
ET
8-
MATCHLINE SHEET 28-0007
54-0001
FIRESTATION #3
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
R
E F
R
E F
R
E F
R
E F
R
E F
Design File and Plot Substitution information
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN4/28/2016
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
0 100
ITS FIRESTATION #3
CITY OF SANDY SPRINGS
0016272
RAIDER DR
H E A R D S
F E R R Y
R D
N
W
SEE DETAIL #9
DETAIL #9
SODDING (Ds4)
E X I S T
R
W
E X I S T
R
W
E X I S T
R
W
EX
IS
T R/
W
EXI
ST
R/W
EXIST R/W
Ds4
Ds4
**TYPICAL BMP LOCATION DETAIL**
F E
N
P B
+0
+0
+0
+0
+0
+0
+0
| 00016272_28-0001 |
| 00016272_28-0002 |
| 00016272_28-0003 |
| 00016272_28-0004 |
| 00016272_28-0005 |
| 00016272_28-0006 |
| 00016272_28-0007 |
| 00016272_28-0008 |
| 00016272_28-0009 |
| 00016272_28-0010 |
| 00016272_28-0011 |
| 00016272_28-0012 |
| 00016272_28-0013 |
| 00016272_28-0014 |
| 00016272_28-0015 |
| 00016272_28-0016 |
| 00016272_52-0001 |
| 00016272_52-0002 |
| 00016272_52-0003 |
| 00016272_52-0004 |
| 00016272_52-0005 |
| 00016272_52-0006 |
| 00016272_52-0007 |
| 00016272_54-0001 |
File details come from the government source that posted it. Updated .