About this opportunity
Cape May Municipal Authority is soliciting bids for miscellaneous landfill cap liner repair services on an as-needed basis, with proposals due November 17, 2026.
The scope encompasses extrusion welding of in-place HDPE or LLDPE materials and replacement of damaged sections; repair or installation of sew-and-stitch scrim-reinforced liner and windscreen ballast; and removal of impurities that prevent proper material union during welding. The contractor must prepare work areas, seal or reseal breaks, cuts, tears, and openings in existing liner materials, and maintain an impermeable and stable surface using common industry standards. Existing geomembrane materials are 40 or 60 mil thickness with smooth or textured surfaces; supplementary cap liner materials include 20 mil scrim-reinforced liner and windscreen ballast.
Qualifications: The contractor must provide one lead worker/field supervisor with a minimum of two years' experience seaming liner material and sufficient skilled crew members to ensure timely progress. The contractor furnishes all labor, materials, equipment, tools, power sources, welding materials, and miscellaneous supplies required to complete repairs to industry standards. The Cape May Municipal Authority will prepare work sites—including sweeping, shoveling, washing, and scrubbing to clear access to work areas—and will remove and replace weights such as tires or earth used to hold materials in place.
No contract value, term length, or incumbent information is provided in the source. No set-asides, preference programs, or additional timeline milestones appear in the posted solicitation.
Opportunity text
SCOPE OF WORK The Contractor selected to provide liner repair services under this Contract shall provide all required labor, materials, equipment and supplies on an "as needed" basis to prepare the work area, seal, or reseal breaks, cuts, tears and/or other openings in existing liner materials by either extrusion welding of existing in-place, or replacement with new HDPE or LLDPE materials or sew and stitch scrjm reinforced liner and windscreen ballast, on an "as needed" basis, to ensure a continuous impermeable and stable surface. The Contractor shall perform all work as to assure and protect the integrity of existing liners using common industry standards. The Contractor shall provide one (1) lead worker/field Supervisor with a minimum of two (2) year's experience in seaming liner material and the necessary quantity of skilled workers (crew members) to assure timely progress of work. The Contractor shall provide all required power sources, equipment, tools, welding materials and any miscellaneous supplies that may be required to perform the work. Work in the field may include removal of any impurities that would prevent proper union of materials as found during the welding process. All welding shall be completed utilizing industry standards for such work, to assure the completed repair is impermeable. The Authority shall assist in work site preparation ahead of the Contract, including sweeping, shoveling, washing or scrubbing of earth, dirt, sand, trash, or other foreign materials as to provide clear access to required work areas. The Authority will remove any tires or earth used as weights to hold material in place that may affect the work area and return such upon completion of the Contractor's work. Existing geomembrane materials are of 40 or 60 mil thickness, and may be either smooth or textured surface other existing cap liner materials include 20 mil scrjm reinforced liner and windscreen ballast. Use of new materials to replace or repair existing materials shall be a joint field decision and approved in advance by the Authority, however, unless otherwise directed, replacement and repair materials shall match existing materials. The Contractor shall cut and align replacement and repair materials in the most efficient manner. No payment shall be made for travel time to/from the Landfill site. The Contractor shall include all costs of transportation of workers to and around the Land fill within the Unit Prices Bid. No payment shall be made for the equipment or its operators during downtime when equipment is broken down or otherwise inoperable. No payment shall be made for those hours when the Contractor is not onsite including any hours the Contractor is not present due to inclement weather. The Contractor's workers may utilize portable comfort facilities located about the Land fill; however, use of the utilities, electric and water is prohibited. The Contractor Work Crew Supervisor shall provide the Authority Supervisor, or Representative assigned as project liaison, with a daily report detailing date, number of hours worked and length of material welded or seamed at the end of each work day. Approval and measurement of finished work shall be conducted by visual inspection daily, by an Authority Representative. Should work be deemed to be unsatisfactory by the Authority Representative, the Contractor shall fix the unsatisfactory portions of the work to the satisfaction of the Authority Representative. No additional payment shall be made for fixing unsatisfactory work
Files
| File | Type | Posted |
|---|---|---|
| cape may municipal SLF-31-26_1.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity