The City of Orange Beach, Alabama is requesting bids on a 2026 roadway resurfacing project covering approximately 25,724 square yards across seven street segments (Marina Road, Orion Street south of Perdido Beach Boulevard, Gulf Road, Jefferson Avenue, Taylor Lane, Cusak Court/Adams Avenue, and Russell Drive) under IFB #2026-1001, with bids due October 1, 2026 at 10:00 a.m. via the City's eProcurement Portal. A non-mandatory pre-bid meeting is scheduled for September 17, 2026 at 2:00 p.m. at City Hall; questions are due September 25, 2026 at 5:00 p.m.

The scope requires street edging, sweeping, tack coat application, milling as needed, and asphalt overlay installation with Superpave bituminous concrete wearing surface (1-inch thickness, 3/8-inch maximum aggregate, ESAL Range C at 165 pounds per square yard, tack coat at 0.07–0.15 gallons per square yard), plus pavement striping per ALDOT CODE 701 Class 2, all per ALDOT Standard Specifications for Highway Construction 2022 Edition and MUTCD 2009 Edition. All materials testing, dust control, traffic control, debris removal, and shoulder work including seeding and mulching are contractor-supplied. Work must commence within ten days of the Notice to Proceed and be completed within thirty consecutive calendar days, with liquidated damages of $500 per day for delays beyond that period.

All pricing must remain constant through December 31, 2026. Bids include a lump sum line item for all listed streets and an additive alternate for asphalt millings priced per cubic yard with loading, hauling, and delivery.

Contractors must be licensed in Alabama, enrolled in E-Verify, and carry Commercial General Liability ($1 million each occurrence, $2 million annual aggregate), Business Auto Liability ($1 million), Worker's Compensation, and Commercial Umbrella/Excess Liability ($1 million). Bids exceeding $100,000 require a certified check or bid bond equal to 5 percent of the bid amount (not to exceed $10,000). The winning contractor must obtain a Performance Bond equal to 100 percent of the contract amount and a Labor & Materials Payment Bond of at least 50 percent within ten days of the Notice of Award. Award will be made to the lowest responsive, responsible bidder on best value considerations. The City reserves the right to reject any or all bids.

Opportunity text

The Contractor shall provide all labor, machinery, and materials as per bid specifications to resurface asphalt streets and/or roads as defined as located within Orange Beach and shall include all these responsibilities in the lump sum and per unit pricing. All pricing shall be constant for through December 31, 2026.