2026 Bridge & Box Culver Erosion Control

Closed State & local contract opportunity Posted

Solicitation number
PE-66084-NONST-2026-000000054
State
Georgia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

This procurement is a sealed-bid invitation for erosion control and streambank protection services issued by the City of Georgia in Terrell County. The project scope encompasses erosion stabilization work on six municipal box culverts located on Cairo Road, South Pinetree Boulevard, Clay Street, MLK at Felix Street, Edgewood Drive, and Cassidy Road, as well as erosion control measures on the MLK and Chatham Road Bridges. Deliverables include the installation of rock check dams, type 3 object markers, and rip rap placement in ditches and stream areas to address infrastructure deficiencies identified in biennial reports provided by the Georgia Department of Transportation (GDOT). The project represents the municipality's systematic approach to addressing identified maintenance needs for critical drainage and bridge infrastructure. The bid package was posted on March 25, 2026, with a submission deadline of April 28, 2026. Interested contractors are required to review all associated bid documentation, including the complete scope of work details, special provisions, and any addenda, to ensure full compliance with submission procedures and project requirements.

The bid package documentation provided does not contain explicit information regarding set-aside designations for disadvantaged enterprises, women-owned businesses, minority-owned businesses, or other specialized contractor classifications. No incumbent vendors or current contractors are identified in the available materials. Similarly, the specific award value, budget range, or contract value for this erosion control project is not disclosed in the summarized bid package information. Prospective bidders should obtain the complete bid package file (Bid package_20260325.pdf, 25MB) to access detailed pricing requirements, evaluation criteria, contract terms, funding sources, and any additional specifications necessary for accurate proposal preparation and submission.

Opportunity text

¿ This project is based on a deficiency report that¿s provided by GDOT to the City every two years. The project will provide erosion stabilizations and streambank protections on the City¿s Box Culverts and Bridges. This includes work on the box culverts on Cairo Road, South Pinetree Boulevard, Clay Street, MLK at Felix Street, Edgewood Drive, and Cassidy Road. Additionally, erosion control will be provided on the MLK and Chatham Road Bridges. This work includes the installation of rock check dams, type 3 object markers, and rip rap in the ditches and in the streams.

Files

File Type Posted
Bid package_20260325.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity