Port Infrastructure Development Program
Closed Posted
- Opportunity number
- MA-PID-25-001
- Agency
-
Maritime Administration
Department of Transportation
- Applications due
- Award size
- $1,000,000 to $125,000,000
Opportunity facts
- Assistance listings
- Funding instrument
- Grant
- Category
-
- Transportation
- Eligible applicants
-
- Tribal Governments (Federally Recognized)
- State Governments
- City/Township Governments
- County Governments
- Special District Governments
- Points of contact
-
- Grants.gov Contact Center contactcenter@grants.gov (800) 518-4726
- <Unknown> support@grants.gov (800) 518-4726
- Full announcement
Opportunity details come from Grants.gov. Updated .
About this opportunity
The Maritime Administration (MARAD) is seeking grant applications for the Fiscal Year 2025 Port Infrastructure Development Program (PIDP), aimed at improving port facilities and goods movement infrastructure at coastal seaports, inland river ports, and Great Lakes ports. The program will fund projects that enhance safety, efficiency, and reliability of maritime transportation, including improvements to loading/unloading operations, transportation network connections, environmental mitigation, and seafood-related infrastructure. Eligible applicants include state and local governments, public agencies, special purpose districts, Indian Tribes, and multistate/multijurisdictional groups, with applicants required to be registered in SAM.gov with a valid Unique Entity Identifier (UEI). Projects will be evaluated based on criteria such as safety improvements, economic vitality, federal funding leverage, port resilience, workforce development, and project readiness. The application deadline is May 14, 2025, with submissions required through Grants.gov by 11:59 p.m. Eastern Daylight Time.
The grant opportunity offers approximately $500 million in total funding, with a maximum of 25% ($112.5 million) available for projects in any single state and at least 25% ($125 million) reserved for small projects at small ports. The federal cost share is generally limited to 80% of total project costs, with potential increases for rural areas and small port projects, and individual small port project awards capped at $11.25 million. Selected projects will be announced no later than December 31, 2025, with funds available for obligation through September 30, 2029. The program will support infrastructure improvements across coastal, river, and Great Lakes maritime regions, focusing on enhancing the efficiency and competitiveness of U.S. port facilities.
Synopsis
9 versions
Update #9 · Latest ·
The 2025 PIDP funding opportunity (Opportunity Number: MA-PID-25-001) update adds additional language to the Additional Information on Eligibility section: "Clarification on Certification Requirements Related to Federal Immigration Law Compliance". -
Announces the availability of $500,000,000 for FY 2025 Port Infrastructure Development Program grants.
Update #8 ·
This Notice of Funding Opportunity (NOFO) was mistakenly removed on January 28, 2025. No changes were made to the original December 20, 2024, publication. MARAD will publish an amended NOFO consistent with new Administration priorities on Grants.gov. Once MARAD publishes the amended NOFO, the application deadline will be extended by the number of days between the initial solicitation (December 20, 2024) and the amendment, consistent with section 3511 of the FY 2025 National Defense Authorization Act.
------------------------
The Notice of Funding Opportunity announces the availability of $450,000,000 for FY 2025 PIDP projects provided by the Bipartisan Infrastructure Legislation. If additional funding for FY 2025 is appropriated by congress, the NOFO will be amended or supplemented accordingly.
To apply for this announcement, you may:
Submit an electronic application:
In order to apply for new funding opportunities which are open to the public for competition, you may access the Grants.gov website portal. All funding opportunities and application kits are made available on Grants.gov.
Unique Entity Identifier (UEI) and System for Award Management (SAM)
Each applicant must: (1) be registered in SAM before submitting its application; (2) provide valid UEI in its application; and (3) continue to maintain an active SAM registration with current information at all times during which it has an active Federal award or an application or plan under consideration by a Federal awarding agency. MARAD may not make a FY 2024 PIDP grant award to an applicant until the applicant has complied with all applicable UEI and SAM requirements and, if an applicant has not fully complied with the requirements by the time MARAD is ready to make a PIDP grant award, MARAD may determine that the applicant is not qualified to receive a PIDP grant award and use that determination as a basis for making a PIDP grant award to another applicant.
Submission Dates and Times
Applications must be submitted to Grants.gov by 11:59 p.m. E.D.T. on April 30, 2025. Grants.gov attaches a time stamp to each application at the time that submission is complete. Applications with a time stamp after the deadline will not be considered. MARAD does not accept applications via mailed paper, fax machine, email, or other means.
Please note that the Grants.gov registration process usually takes 2-4 weeks to complete.
Funding Restrictions
Not more than 25% ($112,500,000) can be awarded for projects in any one state.
At least 25% of funding ($112,500,000) is reserved for small projects at small ports under 46 U.S.C. 54301(b) and not more than 10% of that amount can be used for development phase activities for small projects at small ports that do not result in construction. Additionally, not more than 10% of funds not reserved for small projects at small ports may be awarded for development phase activities for large projects that do not result in construction.
To maximize flexibility for applicants and optimize the number of grants that can be awarded, MARAD will limit any single award to a small project at a small port to not more than $11,250,000 under both BIL funding and any additional PIDP funding that may become available under the annual appropriations act for FY 2025.
The Federal share of the total costs of an eligible PIDP project must not exceed 80%; however, the Secretary may increase the Federal share of costs above 80% for: (1) a grant for a project that is located in a rural area; or (2) a grant awarded to a small project at a small port under 46 U.S.C. 54301(b). "Rural area" and "small project at a small port" are defined in Section A.3 of the NOFO.
Other Submission Requirements
Applications must be submitted through Grants.gov. If duplicate or multiple applications are received from an applicant, only the most recent application will be considered. Applicants are limited to one application describing one project, but that project may have multiple components if those components are demonstrated to have a functional nexus.
For further information concerning this notice please contact the program office at PIDPgrants@dot.gov, or call Aubrey Parsons at 202-366- 8047.
Update #7 ·
Announces the availability of $500,000,000 for FY 2025 Port Infrastructure Development Program grants.
Update #6 ·
This Notice of Funding Opportunity (NOFO) was mistakenly removed on January 28, 2025. No changes were made to the original December 20, 2024, publication. MARAD will publish an amended NOFO consistent with new Administration priorities on Grants.gov. Once MARAD publishes the amended NOFO, the application deadline will be extended by the number of days between the initial solicitation (December 20, 2024) and the amendment, consistent with section 3511 of the FY 2025 National Defense Authorization Act.
------------------------
The Notice of Funding Opportunity announces the availability of $450,000,000 for FY 2025 PIDP projects provided by the Bipartisan Infrastructure Legislation. If additional funding for FY 2025 is appropriated by congress, the NOFO will be amended or supplemented accordingly.
To apply for this announcement, you may:
Submit an electronic application:
In order to apply for new funding opportunities which are open to the public for competition, you may access the Grants.gov website portal. All funding opportunities and application kits are made available on Grants.gov.
Unique Entity Identifier (UEI) and System for Award Management (SAM)
Each applicant must: (1) be registered in SAM before submitting its application; (2) provide valid UEI in its application; and (3) continue to maintain an active SAM registration with current information at all times during which it has an active Federal award or an application or plan under consideration by a Federal awarding agency. MARAD may not make a FY 2024 PIDP grant award to an applicant until the applicant has complied with all applicable UEI and SAM requirements and, if an applicant has not fully complied with the requirements by the time MARAD is ready to make a PIDP grant award, MARAD may determine that the applicant is not qualified to receive a PIDP grant award and use that determination as a basis for making a PIDP grant award to another applicant.
Submission Dates and Times
Applications must be submitted to Grants.gov by 11:59 p.m. E.D.T. on April 30, 2025. Grants.gov attaches a time stamp to each application at the time that submission is complete. Applications with a time stamp after the deadline will not be considered. MARAD does not accept applications via mailed paper, fax machine, email, or other means.
Please note that the Grants.gov registration process usually takes 2-4 weeks to complete.
Funding Restrictions
Not more than 25% ($112,500,000) can be awarded for projects in any one state.
At least 25% of funding ($112,500,000) is reserved for small projects at small ports under 46 U.S.C. 54301(b) and not more than 10% of that amount can be used for development phase activities for small projects at small ports that do not result in construction. Additionally, not more than 10% of funds not reserved for small projects at small ports may be awarded for development phase activities for large projects that do not result in construction.
To maximize flexibility for applicants and optimize the number of grants that can be awarded, MARAD will limit any single award to a small project at a small port to not more than $11,250,000 under both BIL funding and any additional PIDP funding that may become available under the annual appropriations act for FY 2025.
The Federal share of the total costs of an eligible PIDP project must not exceed 80%; however, the Secretary may increase the Federal share of costs above 80% for: (1) a grant for a project that is located in a rural area; or (2) a grant awarded to a small project at a small port under 46 U.S.C. 54301(b). "Rural area" and "small project at a small port" are defined in Section A.3 of the NOFO.
Other Submission Requirements
Applications must be submitted through Grants.gov. If duplicate or multiple applications are received from an applicant, only the most recent application will be considered. Applicants are limited to one application describing one project, but that project may have multiple components if those components are demonstrated to have a functional nexus.
For further information concerning this notice please contact the program office at PIDPgrants@dot.gov, or call Aubrey Parsons at 202-366- 8047.
Update #5 ·
The current deadline for grant applications, as outlined in the existing Notice of Funding Opportunity (NOFO), is today, April 30, 2025. You are free to submit your application in Grants.Gov by this date. We are extending the application deadline to May 14, 2025. -
This Notice of Funding Opportunity (NOFO) was mistakenly removed on January 28, 2025. No changes were made to the original December 20, 2024, publication. MARAD will publish an amended NOFO consistent with new Administration priorities on Grants.gov. Once MARAD publishes the amended NOFO, the application deadline will be extended by the number of days between the initial solicitation (December 20, 2024) and the amendment, consistent with section 3511 of the FY 2025 National Defense Authorization Act.
------------------------
The Notice of Funding Opportunity announces the availability of $450,000,000 for FY 2025 PIDP projects provided by the Bipartisan Infrastructure Legislation. If additional funding for FY 2025 is appropriated by congress, the NOFO will be amended or supplemented accordingly.
To apply for this announcement, you may:
Submit an electronic application:
In order to apply for new funding opportunities which are open to the public for competition, you may access the Grants.gov website portal. All funding opportunities and application kits are made available on Grants.gov.
Unique Entity Identifier (UEI) and System for Award Management (SAM)
Each applicant must: (1) be registered in SAM before submitting its application; (2) provide valid UEI in its application; and (3) continue to maintain an active SAM registration with current information at all times during which it has an active Federal award or an application or plan under consideration by a Federal awarding agency. MARAD may not make a FY 2024 PIDP grant award to an applicant until the applicant has complied with all applicable UEI and SAM requirements and, if an applicant has not fully complied with the requirements by the time MARAD is ready to make a PIDP grant award, MARAD may determine that the applicant is not qualified to receive a PIDP grant award and use that determination as a basis for making a PIDP grant award to another applicant.
Submission Dates and Times
Applications must be submitted to Grants.gov by 11:59 p.m. E.D.T. on April 30, 2025. Grants.gov attaches a time stamp to each application at the time that submission is complete. Applications with a time stamp after the deadline will not be considered. MARAD does not accept applications via mailed paper, fax machine, email, or other means.
Please note that the Grants.gov registration process usually takes 2-4 weeks to complete.
Funding Restrictions
Not more than 25% ($112,500,000) can be awarded for projects in any one state.
At least 25% of funding ($112,500,000) is reserved for small projects at small ports under 46 U.S.C. 54301(b) and not more than 10% of that amount can be used for development phase activities for small projects at small ports that do not result in construction. Additionally, not more than 10% of funds not reserved for small projects at small ports may be awarded for development phase activities for large projects that do not result in construction.
To maximize flexibility for applicants and optimize the number of grants that can be awarded, MARAD will limit any single award to a small project at a small port to not more than $11,250,000 under both BIL funding and any additional PIDP funding that may become available under the annual appropriations act for FY 2025.
The Federal share of the total costs of an eligible PIDP project must not exceed 80%; however, the Secretary may increase the Federal share of costs above 80% for: (1) a grant for a project that is located in a rural area; or (2) a grant awarded to a small project at a small port under 46 U.S.C. 54301(b). "Rural area" and "small project at a small port" are defined in Section A.3 of the NOFO.
Other Submission Requirements
Applications must be submitted through Grants.gov. If duplicate or multiple applications are received from an applicant, only the most recent application will be considered. Applicants are limited to one application describing one project, but that project may have multiple components if those components are demonstrated to have a functional nexus.
For further information concerning this notice please contact the program office at PIDPgrants@dot.gov, or call Aubrey Parsons at 202-366- 8047.
Update #4 ·
This Notice of Funding Opportunity (NOFO) was mistakenly removed on January 28, 2025. No changes were made to the original December 20, 2024, publication. MARAD will publish an amended NOFO consistent with new Administration priorities on Grants.gov. Once MARAD publishes the amended NOFO, the application deadline will be extended by the number of days between the initial solicitation (December 20, 2024) and the amendment, consistent with section 3511 of the FY 2025 National Defense Authorization Act.
------------------------
The Notice of Funding Opportunity announces the availability of $450,000,000 for FY 2025 PIDP projects provided by the Bipartisan Infrastructure Legislation. If additional funding for FY 2025 is appropriated by congress, the NOFO will be amended or supplemented accordingly.
To apply for this announcement, you may:
Submit an electronic application:
In order to apply for new funding opportunities which are open to the public for competition, you may access the Grants.gov website portal. All funding opportunities and application kits are made available on Grants.gov.
Unique Entity Identifier (UEI) and System for Award Management (SAM)
Each applicant must: (1) be registered in SAM before submitting its application; (2) provide valid UEI in its application; and (3) continue to maintain an active SAM registration with current information at all times during which it has an active Federal award or an application or plan under consideration by a Federal awarding agency. MARAD may not make a FY 2024 PIDP grant award to an applicant until the applicant has complied with all applicable UEI and SAM requirements and, if an applicant has not fully complied with the requirements by the time MARAD is ready to make a PIDP grant award, MARAD may determine that the applicant is not qualified to receive a PIDP grant award and use that determination as a basis for making a PIDP grant award to another applicant.
Submission Dates and Times
Applications must be submitted to Grants.gov by 11:59 p.m. E.D.T. on April 30, 2025. Grants.gov attaches a time stamp to each application at the time that submission is complete. Applications with a time stamp after the deadline will not be considered. MARAD does not accept applications via mailed paper, fax machine, email, or other means.
Please note that the Grants.gov registration process usually takes 2-4 weeks to complete.
Funding Restrictions
Not more than 25% ($112,500,000) can be awarded for projects in any one state.
At least 25% of funding ($112,500,000) is reserved for small projects at small ports under 46 U.S.C. 54301(b) and not more than 10% of that amount can be used for development phase activities for small projects at small ports that do not result in construction. Additionally, not more than 10% of funds not reserved for small projects at small ports may be awarded for development phase activities for large projects that do not result in construction.
To maximize flexibility for applicants and optimize the number of grants that can be awarded, MARAD will limit any single award to a small project at a small port to not more than $11,250,000 under both BIL funding and any additional PIDP funding that may become available under the annual appropriations act for FY 2025.
The Federal share of the total costs of an eligible PIDP project must not exceed 80%; however, the Secretary may increase the Federal share of costs above 80% for: (1) a grant for a project that is located in a rural area; or (2) a grant awarded to a small project at a small port under 46 U.S.C. 54301(b). "Rural area" and "small project at a small port" are defined in Section A.3 of the NOFO.
Other Submission Requirements
Applications must be submitted through Grants.gov. If duplicate or multiple applications are received from an applicant, only the most recent application will be considered. Applicants are limited to one application describing one project, but that project may have multiple components if those components are demonstrated to have a functional nexus.
For further information concerning this notice please contact the program office at PIDPgrants@dot.gov, or call Aubrey Parsons at 202-366- 8047.
Update #3 ·
The Notice of Funding Opportunity announces the availability of $450,000,000 for FY 2025 PIDP projects provided by the Bipartisan Infrastructure Legislation. If additional funding for FY 2025 is appropriated by congress, the NOFO will be amended or supplemented accordingly.
To apply for this announcement, you may:
Submit an electronic application:
In order to apply for new funding opportunities which are open to the public for competition, you may access the Grants.gov website portal. All funding opportunities and application kits are made available on Grants.gov.
Unique Entity Identifier (UEI) and System for Award Management (SAM)
Each applicant must: (1) be registered in SAM before submitting its application; (2) provide valid UEI in its application; and (3) continue to maintain an active SAM registration with current information at all times during which it has an active Federal award or an application or plan under consideration by a Federal awarding agency. MARAD may not make a FY 2024 PIDP grant award to an applicant until the applicant has complied with all applicable UEI and SAM requirements and, if an applicant has not fully complied with the requirements by the time MARAD is ready to make a PIDP grant award, MARAD may determine that the applicant is not qualified to receive a PIDP grant award and use that determination as a basis for making a PIDP grant award to another applicant.
Submission Dates and Times
Applications must be submitted to Grants.gov by 11:59 p.m. E.D.T. on April 30, 2025. Grants.gov attaches a time stamp to each application at the time that submission is complete. Applications with a time stamp after the deadline will not be considered. MARAD does not accept applications via mailed paper, fax machine, email, or other means.
Please note that the Grants.gov registration process usually takes 2-4 weeks to complete.
Funding Restrictions
Not more than 25% ($112,500,000) can be awarded for projects in any one state.
At least 25% of funding ($112,500,000) is reserved for small projects at small ports under 46 U.S.C. 54301(b) and not more than 10% of that amount can be used for development phase activities for small projects at small ports that do not result in construction. Additionally, not more than 10% of funds not reserved for small projects at small ports may be awarded for development phase activities for large projects that do not result in construction.
To maximize flexibility for applicants and optimize the number of grants that can be awarded, MARAD will limit any single award to a small project at a small port to not more than $11,250,000 under both BIL funding and any additional PIDP funding that may become available under the annual appropriations act for FY 2025.
The Federal share of the total costs of an eligible PIDP project must not exceed 80%; however, the Secretary may increase the Federal share of costs above 80% for: (1) a grant for a project that is located in a rural area; or (2) a grant awarded to a small project at a small port under 46 U.S.C. 54301(b). "Rural area" and "small project at a small port" are defined in Section A.3 of the NOFO.
Other Submission Requirements
Applications must be submitted through Grants.gov. If duplicate or multiple applications are received from an applicant, only the most recent application will be considered. Applicants are limited to one application describing one project, but that project may have multiple components if those components are demonstrated to have a functional nexus.
For further information concerning this notice please contact the program office at PIDPgrants@dot.gov, or call Aubrey Parsons at 202-366- 8047.
Update #2 ·
Holding statement added to advise that original December 20 NOFO was inadvertently deleted and the current NOFO may be amended to reflect new Administration priorities. If the NOFO is amended, the application deadline will be extended per the FY 2025 NDAA. -
This Notice of Funding Opportunity (NOFO) was inadvertently removed on January 28, 2025. No changes were made to the original December 20, 2024, publication. MARAD will publish an amended NOFO consistent with new Administration priorities on Grants.gov. Once MARAD publishes the amended NOFO, the application deadline will be extended by the number of days between the initial solicitation (December 20, 2024) and the amendment, consistent with section 3511 of the FY 2025 National Defense Authorization Act.
-------------------------------
The Notice of Funding Opportunity announces the availability of $450,000,000 for FY 2025 PIDP projects provided by the Bipartisan Infrastructure Legislation. If additional funding for FY 2025 is appropriated by congress, the NOFO will be amended or supplemented accordingly.
To apply for this announcement, you may:
Submit an electronic application:
In order to apply for new funding opportunities which are open to the public for competition, you may access the Grants.gov website portal. All funding opportunities and application kits are made available on Grants.gov.
Unique Entity Identifier (UEI) and System for Award Management (SAM)
Each applicant must: (1) be registered in SAM before submitting its application; (2) provide valid UEI in its application; and (3) continue to maintain an active SAM registration with current information at all times during which it has an active Federal award or an application or plan under consideration by a Federal awarding agency. MARAD may not make a FY 2024 PIDP grant award to an applicant until the applicant has complied with all applicable UEI and SAM requirements and, if an applicant has not fully complied with the requirements by the time MARAD is ready to make a PIDP grant award, MARAD may determine that the applicant is not qualified to receive a PIDP grant award and use that determination as a basis for making a PIDP grant award to another applicant.
Submission Dates and Times
Applications must be submitted to Grants.gov by 11:59 p.m. E.D.T. on April 30, 2025. Grants.gov attaches a time stamp to each application at the time that submission is complete. Applications with a time stamp after the deadline will not be considered. MARAD does not accept applications via mailed paper, fax machine, email, or other means.
Please note that the Grants.gov registration process usually takes 2-4 weeks to complete.
Funding Restrictions
Not more than 25% ($112,500,000) can be awarded for projects in any one state.
At least 25% of funding ($112,500,000) is reserved for small projects at small ports under 46 U.S.C. 54301(b) and not more than 10% of that amount can be used for development phase activities for small projects at small ports that do not result in construction. Additionally, not more than 10% of funds not reserved for small projects at small ports may be awarded for development phase activities for large projects that do not result in construction.
To maximize flexibility for applicants and optimize the number of grants that can be awarded, MARAD will limit any single award to a small project at a small port to not more than $11,250,000 under both BIL funding and any additional PIDP funding that may become available under the annual appropriations act for FY 2025.
The Federal share of the total costs of an eligible PIDP project must not exceed 80%; however, the Secretary may increase the Federal share of costs above 80% for: (1) a grant for a project that is located in a rural area; or (2) a grant awarded to a small project at a small port under 46 U.S.C. 54301(b). "Rural area" and "small project at a small port" are defined in Section A.3 of the NOFO.
Other Submission Requirements
Applications must be submitted through Grants.gov. If duplicate or multiple applications are received from an applicant, only the most recent application will be considered. Applicants are limited to one application describing one project, but that project may have multiple components if those components are demonstrated to have a functional nexus.
For further information concerning this notice please contact the program office at PIDPgrants@dot.gov, or call Aubrey Parsons at 202-366- 8047.
Update #1 ·
The Notice of Funding Opportunity announces the availability of $450,000,000 for FY 2025 PIDP projects provided by the Bipartisan Infrastructure Legislation. If additional funding for FY 2025 is appropriated by congress, the NOFO will be amended or supplemented accordingly.
To apply for this announcement, you may:
Submit an electronic application:
In order to apply for new funding opportunities which are open to the public for competition, you may access the Grants.gov website portal. All funding opportunities and application kits are made available on Grants.gov.
Unique Entity Identifier (UEI) and System for Award Management (SAM)
Each applicant must: (1) be registered in SAM before submitting its application; (2) provide valid UEI in its application; and (3) continue to maintain an active SAM registration with current information at all times during which it has an active Federal award or an application or plan under consideration by a Federal awarding agency. MARAD may not make a FY 2024 PIDP grant award to an applicant until the applicant has complied with all applicable UEI and SAM requirements and, if an applicant has not fully complied with the requirements by the time MARAD is ready to make a PIDP grant award, MARAD may determine that the applicant is not qualified to receive a PIDP grant award and use that determination as a basis for making a PIDP grant award to another applicant.
Submission Dates and Times
Applications must be submitted to Grants.gov by 11:59 p.m. E.D.T. on April 30, 2025. Grants.gov attaches a time stamp to each application at the time that submission is complete. Applications with a time stamp after the deadline will not be considered. MARAD does not accept applications via mailed paper, fax machine, email, or other means.
Please note that the Grants.gov registration process usually takes 2-4 weeks to complete.
Funding Restrictions
Not more than 25% ($112,500,000) can be awarded for projects in any one state.
At least 25% of funding ($112,500,000) is reserved for small projects at small ports under 46 U.S.C. 54301(b) and not more than 10% of that amount can be used for development phase activities for small projects at small ports that do not result in construction. Additionally, not more than 10% of funds not reserved for small projects at small ports may be awarded for development phase activities for large projects that do not result in construction.
To maximize flexibility for applicants and optimize the number of grants that can be awarded, MARAD will limit any single award to a small project at a small port to not more than $11,250,000 under both BIL funding and any additional PIDP funding that may become available under the annual appropriations act for FY 2025.
The Federal share of the total costs of an eligible PIDP project must not exceed 80%; however, the Secretary may increase the Federal share of costs above 80% for: (1) a grant for a project that is located in a rural area; or (2) a grant awarded to a small project at a small port under 46 U.S.C. 54301(b). "Rural area" and "small project at a small port" are defined in Section A.3 of the NOFO.
Other Submission Requirements
Applications must be submitted through Grants.gov. If duplicate or multiple applications are received from an applicant, only the most recent application will be considered. Applicants are limited to one application describing one project, but that project may have multiple components if those components are demonstrated to have a functional nexus.
For further information concerning this notice please contact the program office at PIDPgrants@dot.gov, or call Aubrey Parsons at 202-366- 8047.
Files
Posting history
| Listing | Posted | Applications due |
|---|---|---|
| Opportunity | ||
| Opportunity |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar grant opportunities
- Ask GovTribe AI about this opportunity