This solicitation seeks construction services to reconstruct the East Side Drainage Canal at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 is seeking a contractor to demolish the existing canal and replace it with a naturalized channel and riparian corridor. Offerors must demonstrate experience completing similar infrastructure projects and propose their qualifications and approach to the reconstruction. Proposals are due by May 10, 2023 with the bid opening taking place in person on the same date at 1:00 PM Central Time.

The solicitation is a 100% set-aside for verified Service-Disabled Veteran-Owned Small Business firms. The project involves reconstructing approximately 1,200 linear feet of drainage canal along the east side of the medical center campus within 425 calendar days of receiving notice to proceed. The place of performance is the Clement J. Zablocki VA Medical Center located at 5000 W. National Avenue, Milwaukee, Wisconsin. The total estimated value of the contract is between $2,000,000 to $5,000,000.

Notice text

3 versions

Update #3 · Latest ·

36C25223B0017 0002

SF30 Continuation Sheet

36C25223B0017 0002

Reconstruct East Side Drainage Canal

695-20-102

Clement J. Zablocki VA Medical Center, Milwaukee, WI

I. The following changes are made on project specifications:

None.

II. The following changes are made on project drawings:

CS101 was revised. Wingwalls and foundation were added to riprap transition from natural channel to historic stone wall (Station 18+00).

CU101 was revised. Wingwalls and foundation were added to riprap transition from natural channel to historic stone wall (Station 18+00).

CU501 was revised. Wingwalls and foundation were added to riprap transition from natural channel to historic stone wall (Station 18+00).

CG101 was revised. Wingwalls and foundation were added to riprap transition from natural channel to historic stone wall (Station 18+00).

III. The following Questions and Answers / Clarifications are the result of bidder request(s) for information:

Can all work be completed during normal (0700 1530) daytime work shifts?

Answer: Yes.

In section 01 00 00 1.12.C, referring to delivering two electronic copies of complete As Builts after each completed phase. This also applies to shop drawings. If electronic, does the VA require two?

Answer: No. During review periods of shop drawings, submittals, as-builts and O&Ms, there will be only one electronic copy. When the document is formally approved by VA and AE, COR desires one hardcopy of complete as-built drawings and O&Ms.

Per section 01 00 00.1.19.B, Does the VA require four hard copies of the completed O&M? Do the manuals require delivery when the equipment arrives or at substantial completion?

Answer: No. Upon final approval VA COR requires one electronic and one hard copy of the O&Ms. O&M delivery can be at substantial completion.

Reference 01 32 16.15.1.2.C and 1.3, is an outside consultant required for CPM scheduling or can the General Contractor develop the schedule In-House for this particular project?

Answer: Bid the project per specification and include an outside scheduling consultant in the base bid. During preconstruction submittal process, COR will entertain potential credit to the contract if General Contractor can perform scheduling work in-house . This will require a modification and will require approval from the Contracting Officer.

Is a submittal log/register required for submission by the contractor for this project? Reference 01 33 23 1.3.C, the VA provides the initial submittal register.

Answer: Contractor shall review specifications and provide a submittal log in VA-approved Excel format during preconstruction submittal process. VA COR will review his submittal log against the General Contractor s and upload to Opcenter a joint submittal register to ensure all submittals are captured.

Reference 01 81 13, is sustainable construction required on this project?

Answer: This is a required specification on all VA projects going forward. Review the tables at the end of the specification and provide a submittal accordingly. Note that much in this table may be N/A for this exterior project.

Is there a source of power at the site to be used for dewatering equipment (pumps, etc)? What is the distance to the nearest source of power that can be used for this equipment?

Answer: Bldg 39 to north/west has power that is available. The 100A service with its own disconnect is in the basement. Picture below. Bldg 39 is less than 100 yards from the upstream edge of the creek.

Can the source of power be used 24 / 7 to keep pumps running when work is not taking place?

Answer: VA expectation was that the pumps that would fuel driven; too large for electric pumps. However, if contractor can utilize electric pumps to provide necessary dewatering and bypass pumping, Contractor may utilize VA electricity from Bldg 39 at no cost. The cost to connect to available power with appropriate and safe temporary conduit/terminations is fully the cost of the Contractor s.

The Landscape Plan (LS101) provides qty and spacing for the new trees and shrubs, but does not provide a size for the plantings / trees. Please provide sizing as pricing varies by size.

Answer: Revised LS101 provides this information on minimum plant sizes.

The Construction Entrance road (Key Note #2 on CJ101) does not appear to start at a road. Please advise / revise drawing to reflect where the construction entrance is to connect to a road to allow construction traffic access to the staging area. We do not think Barron Ct would work as large equipment trucks will not be able to access from here. We would think coming from the contractor lot would be preferred?

Answer: Bid the plan set and include necessary sidewalk restoration (or protection) as necessary for the laydown and storage area as identified in the drawings. VA does not anticipate any construction vehicles would ever need to drive on Barron Court. Instead, construction vehicles would enter Contractor parking lot and then utilize sidewalk to drive around to laydown/storage area (see below). Contractor could protect sidewalk as appropriate or replace/restore when construction is complete.

Note, however, that COR would be willing to entertain alternate laydown/storage area with the awarded contractor during preconstruction submittal process. Regardless of area used, the creek would have to be protected from contractor vehicles with fencing and jersey barriers. VA Grounds department would provide necessary jersey barriers; contractor would supply fencing. If awarded contractor provides an alternate plan that utilizes part of the Contractor parking lot instead that would be reviewed for its additional cost/credit to the contract. Review would include how many of the contractor spots would be lost. We must keep at least half to 2/3 of the parking spots in the Contractor parking lot.

The temporary Construction Fence (Key note #4 on CJ101) does not appear to continue along the entire south side of the project limits? There looks to be a section that would not be fenced in. Please review and advise if the temporary construction fence should continue at the SE side of the project to fully enclose the project boundaries.

Answer: The temporary construction fence does not need to continue along entire south side of the creek. VA intended for the temporary fence to dive into and connect to the existing fence during construction until it is time to remove the old fence and replace with new.

REMINDER: VAAR 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction is included in this solicitation (see SF1442 pages 51-52); signed certification must accompany bid to be considered for award.

Update #2 ·

Reconstruct East Side Drainage Canal

Clement j. zablocki va medical center, milwaukee, WI

I. The following changes are to be made to the solicitation:

a. BID OPENING INFORMATION:

Bids remain due on Wednesday, May 10, 2023 at 10:00am CST as posted in Block 13 of the solicitation.

Bid opening on Page 7 of the solicitation is changed to Wednesday, May 10, 2023 at 10:00am CST.

IAW FAR 52.214-5 Submission of Bids; Bids shall be provided either in person or via mail to the Contracting Officer at the address below on or before the date and time specified for receipt of bids. Any bids received after the date and time specified for receipt of bids will be processed in accordance with FAR 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (Nov 1999).

ATTN: Joshua Jackson

SOLICITATION 36C25223B0017 (COMPANY NAME)

Great Lakes Acquisition Center (GLAC)

115 S. 84th Street, Suite 101

Milwaukee, WI 53214-1476

4) REMINDER: VAAR 852.219-77 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction is included in this solicitation (see SF1442 pages 53-55); signed certification must accompany bid to be considered for award.

II. The following changes are made on project specifications:

n/a

III. The following changes are made on project drawings:

n/a

IV. The following Questions and Answers / Clarifications are the result of bidders request(s) for information:

VA RESPONSES TO QUESTIONS RECEIVED TO DATE ARE FORTHCOMING.

V. general information:

PRE BID SITE VISIT SIGN-IN SHEET ATTACHED.

Update #1 ·

695-22-102 Reconstruct East Side Drainage Canal

Nothing Follows------------------------------------------------------------------------------------------------

Files

Show all 11

Notice history

Notice Type Posted
Z2KB--Con-Reconstruct East Side Drainage Canal 695-20-102 Clement J. Zablocki VAMC Milwaukee, WI Award Award Notice
This notice Latest solicitation Solicitation
Z2KB--695-20-102 Con-Reconstruct East Side Drainage Canal (VA-23-00049157) Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Expand 111 OR Department 2AS Phase 1 - Construction - Milwaukee, WI - Project:695-501 Milwaukee, Wisconsin 53295, United States · NAICS 236220 VA Technology Acquisition Center Service-Disabled Veteran-Owned Small Business
Z1DA--Project 695-24-107 Replace Boilers 4 and 5 Clement J. Zablocki, VA Medical Center 5000 West National Avenue Milwaukee, WI 53295 United States · NAICS 238220 Veterans Integrated Service Network 12 Service-Disabled Veteran-Owned Small Business
Z1DA--550-20-121 Demo Old Boiler Plant B100 (CON) Veterans Affairs Illiana Healthcare System -Vaihcs Danville, Illinois 61832, United States · NAICS 236220 Veterans Integrated Service Network 12 Service-Disabled Veteran-Owned Small Business
Z2NZ-- 658-23-108 Correct Stormwater Drainage Salem, Virginia 24153, United States · NAICS 237110 Veterans Integrated Service Network 6 Service-Disabled Veteran-Owned Small Business
Z1DA--36C25227B0026 Remodel ENT Procedure Rooms CON 537-19-109 Jesse Brown VA Medical Center 820 South Damen Avenue Chicago, Illinois 60612, United States · NAICS 236220 Veterans Integrated Service Network 12 Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors