36C25223B0017 0002.docx

DOCX document 494 KB Posted

Attached to
Z2KB--695-20-102 Con-Reconstruct East Side Drainage Canal (VA-23-00049157)
Solicitation number
36C25223B0017
Issued by

About this file

This document contains an amendment to a solicitation for construction services. The Department of Veterans Affairs is seeking to reconstruct the East Side Drainage Canal at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The amendment provides responses to bidder questions to clarify project requirements. No changes are made to specifications or drawings, with the exception of adding wingwalls and foundations to riprap transitions. The temporary construction fence does not need to extend along the entire south side of the creek. The source of power in an adjacent building may be used to operate dewatering pumps. Landscaping plant sizes are included on revised drawings.

The solicitation number is 36C25223B0017. The project number is 695-20-102. The estimated value is not provided. The response due date is not stated. The award date is not provided. Pricing and payment terms are not included. There are no set-asides or socioeconomic requirements specified. The contracting agency is the Department of Veterans Affairs Great Lakes Acquisition Center.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25223B0017 0002 SF30 Continuation Sheet

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 695-23-3-6955-0005 695-20-102 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee

WI

53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee

WI

53214-1476 To all Offerors/Bidders

36C25223B0017 05-02-2023

X X X x Project Name: Replace East Side Drainage Canal Project Number: 695-20-102

The purpose of this amendment is to address Requests for Information by potential bidders.

See Attached Documents.

Continue to monitor Contract Opportunities at SAM.GOV for any and all changes to this solicitation.

Stacy Hoover Contracting Officer Reconstruct East Side Drainage Canal 695-20-102 Clement J. Zablocki VA Medical Center, Milwaukee, WI

I. The following changes are made on project specifications:

1. None.

II. The following changes are made on project drawings:

1. CS101 was revised. Wingwalls and foundation were added to riprap transition from natural channel to historic stone wall (Station 18+00).

2. CU101 was revised. Wingwalls and foundation were added to riprap transition from natural channel to historic stone wall (Station 18+00).

3. CU501 was revised. Wingwalls and foundation were added to riprap transition from natural channel to historic stone wall (Station 18+00).

4. CG101 was revised. Wingwalls and foundation were added to riprap transition from natural channel to historic stone wall (Station 18+00).

III. The following Questions and Answers / Clarifications are the result of bidder request(s) for information:

1. Can all work be completed during normal (0700 – 1530) daytime work shifts?

Answer: Yes.

2. In section 01 00 00 1.12.C, referring to delivering two electronic copies of complete As Builts after each completed phase. This also applies to shop drawings. If electronic, does the VA require two?

Answer: No. During review periods of shop drawings, submittals, as-builts and O&Ms, there will be only one electronic copy. When the document is formally approved by VA and AE, COR desires one hardcopy of complete as-built drawings and O&Ms.

3. Per section 01 00 00.1.19.B, Does the VA require four hard copies of the completed O&M? Do the manuals require delivery when the equipment arrives or at substantial completion?

Answer: No. Upon final approval VA COR requires one electronic and one hard copy of the O&Ms. O&M delivery can be at substantial completion.

4. Reference 01 32 16.15.1.2.C and 1.3, is an outside consultant required for CPM scheduling or can the General Contractor develop the schedule “In-House” for this particular project?

Answer: Bid the project per specification and include an outside scheduling consultant in the base bid. During preconstruction submittal process, COR will entertain potential credit to the contract if General Contractor can perform scheduling work “in-house”. This will require a modification and will require approval from the Contracting Officer.

5. Is a submittal log/register required for submission by the contractor for this project? Reference 01 33 23 1.3.C, the VA provides the initial submittal register.

Answer: Contractor shall review specifications and provide a submittal log in VA-approved Excel format during preconstruction submittal process. VA COR will review his submittal log against the General Contractor’s and upload to Opcenter a “joint” submittal register to ensure all submittals are captured.

6. Reference 01 81 13, is sustainable construction required on this project?

Answer: This is a required specification on all VA projects going forward. Review the tables at the end of the specification and provide a submittal accordingly. Note that much in this table may be “N/A” for this exterior project.

7. Is there a source of power at the site to be used for dewatering equipment (pumps, etc)? What is the distance to the nearest source of power that can be used for this equipment?

Answer: Bldg 39 to north/west has power that is available. The 100A service with its own disconnect is in the basement. Picture below. Bldg 39 is less than 100 yards from the upstream edge of the creek.

8. Can the source of power be used 24 / 7 to keep pumps running when work is not taking place?

Answer: VA expectation was that the pumps that would fuel driven; too large for electric pumps. However, if contractor can utilize electric pumps to provide necessary dewatering and bypass pumping, Contractor may utilize VA electricity from Bldg 39 at no cost. The cost to connect to available power with appropriate and safe temporary conduit/terminations is fully the cost of the Contractor’s.

9. The Landscape Plan (LS101) provides qty and spacing for the new trees and shrubs, but does not provide a size for the plantings / trees. Please provide sizing as pricing varies by size.

Answer: Revised LS101 provides this information on minimum plant sizes.

10. The Construction Entrance road (Key Note #2 on CJ101) does not appear to start at a road. Please advise / revise drawing to reflect where the construction entrance is to connect to a road to allow construction traffic access to the staging area. We do not think Barron Ct would work as large equipment trucks will not be able to access from here. We would think coming from the contractor lot would be preferred?

Answer: Bid the plan set and include necessary sidewalk restoration (or protection) as necessary for the laydown and storage area as identified in the drawings. VA does not anticipate any construction vehicles would ever need to drive on Barron Court. Instead, construction vehicles would enter Contractor parking lot and then utilize sidewalk to drive around to laydown/storage area (see below). Contractor could protect sidewalk as appropriate or replace/restore when construction is complete.

Note, however, that COR would be willing to entertain alternate laydown/storage area with the awarded contractor during preconstruction submittal process. Regardless of area used, the creek would have to be protected from contractor vehicles with fencing and jersey barriers. VA Grounds department would provide necessary jersey barriers; contractor would supply fencing. If awarded contractor provides an alternate plan that utilizes part of the Contractor parking lot instead – that would be reviewed for its additional cost/credit to the contract. Review would include how many of the contractor spots would be lost. We must keep at least half to 2/3 of the parking spots in the Contractor parking lot.

11. The temporary Construction Fence (Key note #4 on CJ101) does not appear to continue along the entire south side of the project limits? There looks to be a section that would not be fenced in. Please review and advise if the temporary construction fence should continue at the SE side of the project to fully enclose the project boundaries.

Answer: The temporary construction fence does not need to continue along entire south side of the creek. VA intended for the temporary fence to “dive into” and connect to the existing fence during construction until it is time to remove the old fence and replace with new.

REMINDER: VAAR 852.219-75 VA Notice of Limitations on Subcontracting – Certificate of Compliance for Services and Construction is included in this solicitation (see SF1442 pages 51-52); signed certification must accompany bid to be considered for award.

See attached document: 2023.04.26-.1046.21 MKE VA CANAL_Addendun #1 Drawings.