Z1MG--36C26223Q0213 | Solar Panel PM | GLA

Closed Solicitation Posted

Solicitation number
36C26223Q0213
Agency
Veterans Integrated Service Network 22 Veterans Health Administration, Department of Veterans Affairs
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
221114 Solar Electric Power Generation
PSC
Z1MG Maintenance Of Epg Facilities - Solar

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation is for solar panel preventative maintenance and repair services at the Sepulveda VA Medical Campus in North Hills, California. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 is seeking these services which include annual maintenance of seventeen solar arrays, replacement of 150 broken solar panels in the base year and subsequent years if exercised, and emergency repairs. The contract would be awarded for one base year with four one-year options to verified service-disabled veteran-owned small businesses, with responses due by March 16, 2023 to be considered.

The contract has no set-aside designations and involves replacing 150 broken solar panels over three years at medical campuses in North Hills, California and Los Angeles, with semi-annual servicing for solar panels and trackers including cleaning, inspections, and repairs. Pricing is provided for the base year and each option year extending to five years total. The place of performance is the Sepulveda VA Medical Campus in North Hills, California and responses are due by March 16, 2023 to be considered for award.

Notice text

2 versions

Update #2 · Latest ·

Questions for solar maintenance contract:

Current status of each of the array controlled by an inverter? Specifically, are all inverters running? If not, can you provide a short synopsis of current issues?

All inverters are operating.Â

Have all the warranties for the inverters expired?

Yes all warranties have expired. The Satcon  and Solaron inverter warranties have expired and the inverters are not manufactured any longer.

The SMA inverter warranties have expired.

Who is administering and managing warrantied parts, the contractor or COR?

Refer to response to question 2.

 The Ground mount solar system has a Sunpower tracker system. Should the contractor also include the maintenance of the tracker system in their proposal.

Yes. Contractor shall also include in their proposal the proper maintenance of the Sunpower tracker system. Inspect and verify proper operation tracker system

And tracker controllers. Lubricate tracker motors and screw jacks semi- annually.

Contractual Questions

The solicitation mentions 150 broken modules. To ensure correct interpretation, should my bid reflect the replacement of 150 broken modules or is 150 modules a projection for the year and my bid should reflect replacing a single module (per occurrence)?

Yes contractor should replace 150 broken modules. The Heliene 72P-325 and Sunpower E20/327 solar panels are not manufactured any longer. Contractor shall provide all labor, material, necessary mounting support and electrical wiring modifications to

replace with equivalent solar panels. Â

Should my bid on the 150 PV Modules include parts and labor or just labor and the cost for the PV Module is submitted to COR for approval?

Bid should include all parts, labor, material and modifications as required. Refer to response to Contractual Question 1.

I assume all incidental maintenance e.g., discrepancies found during Normal Services are submitted to COR for approval along with contractor cost (parts/labor) for repairing said discrepancy?

Contractor shall include and take care of all normal incidental maintenance requirements as part of the bid.

Please confirm PV Module Washing is not a part of this solicitation, but as an addendum to the contract when required (hence no cost for cleaning should be included in my bid)?

Per Paragraph 5.2.1 Contractor shall include in proposal all material and labor required to provide for solar cleaning services twice per year for the VA Sepulevda Campus and four times per year for the LA ACC Medical Center.Â

Please confirm that all combiner and inverter fuses and inverter filter costs are the contractor s responsibility and should be included in the contractor s bid.

Correct contractor shall provide for all material and labor for all combiner and inverter fuses and inverter filters.

Section 5.1.1 (Inverter & Inverter Enclosure Cleaning) does not directly mention a schedule. Are these services to be performed annually with 5.1.2 or are these services performed more than once a year?

Section 5.1.1 refers to Inverter manufacturer maintenance requirements contractor shall have experience in maintaining the Satcon and Solaron  inverters and perform all maintenance requirements

every six months torque all terminals, fasteners electrical power connections on inverters and all combiners, Â replace air filters, check condition of AC and DC surge suppressors, record all operating voltages

and current readings, record all inspections completed to turn it in to the VA COR.

There are no projected hours for 0002 Emergency Repairs . How are we supposed to bid this line item?

0003 Emergency Repair Contractor does not have to include a price for this item. Â

Cleaning Questions

Please provide a total module count for each location.

Sunpower E20/327 solar panel 12,128 Solar Panels.

At Ground mount next to Building 7 Array 1 has 322 Kyocera KD240GX-LPB modules and 228 Heliene 325W 72PIFD1701USA panels.

Number of solar panels at Parking Lot 99 Â 518 solar panels

Number of solar panels at Parking Lot F 2,212 Kyocera 245GX-LFB

On buildings with solar arrays, are there any water spickets and 120VAC electrical outlets on or near the roof?

No spickets, no outlets. Contractor shall use DI water for cleaning solar panels and provide long extension cords.

        4.. On buildings with solar arrays, are there any building internal or external roof access points (roof access ladders) to rooftops?

               Yes There is access to the roof.Â

On carports, are there any water spickets and 120VAC electrical outlets on or near each of the carports?

No. spickets and no outlets. Contractor shall provide water portable water tank, DI water, and proper lifts. Coordinate with VA COR for

weekend cleaning of solar panels for the carports. Contractor shall conserve water.  Â

Please delete from SOW:

1.5.13 Other Direct Costs: Note: The VA does have spare PV modules, also some of the inverters ware not being used so that contractor can coordinate with the VA COR in using for spare parts. Â

Update #1 ·

This procurement is for the servicing and repair of the Solar Panels located at 16111 Plummer Street, North Hills, CA 91343 (Sepulveda VA Medical Campus). The first three years of the contract involve already identified solar panels that need replacing. Servicing and cleaning of the existing solar panels will continue through the entirety of the length of the awarded contract.

Attachments

Files attached to this notice, newest first
File Type Posted
36C26223Q0213 0001.docx DOCX document
36C26223Q0213_1.docx DOCX document

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Z1MG--36C26223Q0213 | Solar Panel PM | GLA This notice · Latest solicitation Solicitation
Z1MG--36C26223Q0213 | Solar Panel PM | GLA Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity