Z1DA--Replace Damaged Flooring 539-23-202
Closed Solicitation Posted
- Solicitation number
- 36C25024B0019
- Agency
-
Veterans Integrated Service Network 10
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Cincinnati, Ohio 45220, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs Veterans Health Administration VISN 10 is seeking proposals for a construction project to replace damaged flooring throughout a VA hospital in Cincinnati, Ohio. The contractor will be responsible for removing existing carpet and flooring that has been damaged by water and mold, as well as removing isolated toilets that may be contributing to the water damage. The work includes general construction, electrical, and technology tasks, and may also require abatement. The period of performance is 90 days from the notice to proceed, and proposals are due by March 28, 2024.
This solicitation is set aside for service-disabled veteran-owned small businesses under NAICS code 236220 for Residential and Nonresidential Building Construction. The magnitude of the contract is estimated between $250,000 and $500,000. The place of performance is the Cincinnati VA Medical Center. There are no incumbent contractors identified, and the solicitation has been cancelled and reissued with an updated due date of March 28, 2024.
Notice text
3 versions
Update #3 · Latest ·
****UPDATE****: 3/26/2024: "This solicitation has been cancelled in the best interest of the Government" Please see amendment #2 for details.
The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Repair Damaged Floor, including prepare site for building operations including demolition and removal of existing structures, and furnish labor and materials and perform work as required by drawings and specifications.
Work includes mechanical, plumbing, and electrical work, and certain other items shown and specified in project drawings and specifications.
This construction project will replace carpet and other flooring throughout the hospital that has been damaged by water and other environmental factors. Some of the rooms are unable to be occupied due to the moisture and mold that has settled on and under the flooring. The goal of the hospital is to remove all the carpet left in the hospital. This project will also remove isolated toilets in some rooms where they need to be removed and are possibly the source of any water damage. This work includes general construction, electrical, technology, and may include abatement, etc.
The above construction Statement Of Work (SOW) constitutes a basic outline of work and in no way outlines all of the details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specification be initiated to determine the needs and conditions for the construction of this project.
Period of Performance: All phases of work completed within 90 days after issuance of the Notice to Proceed.
Update #2 ·
The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Repair Damaged Floor, including prepare site for building operations including demolition and removal of existing structures, and furnish labor and materials and perform work as required by drawings and specifications.
Work includes mechanical, plumbing, and electrical work, and certain other items shown and specified in project drawings and specifications.
This construction project will replace carpet and other flooring throughout the hospital that has been damaged by water and other environmental factors. Some of the rooms are unable to be occupied due to the moisture and mold that has settled on and under the flooring. The goal of the hospital is to remove all the carpet left in the hospital. This project will also remove isolated toilets in some rooms where they need to be removed and are possibly the source of any water damage. This work includes general construction, electrical, technology, and may include abatement, etc.
The above construction Statement Of Work (SOW) constitutes a basic outline of work and in no way outlines all of the details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specification be initiated to determine the needs and conditions for the construction of this project.
Period of Performance: All phases of work completed within 90 days after issuance of the Notice to Proceed.
Update #1 ·
The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Upgrade Elevators Project, including prepare site for building operations including demolition and removal of existing structures, and furnish labor and materials and perform work as required by drawings and specifications.
Work includes mechanical, plumbing, and electrical work, and certain other items shown and specified in project drawings and specifications.
This construction project will replace carpet and other flooring throughout the hospital that has been damaged by water and other environmental factors. Some of the rooms are unable to be occupied due to the moisture and mold that has settled on and under the flooring. The goal of the hospital is to remove all the carpet left in the hospital. This project will also remove isolated toilets in some rooms where they need to be removed and are possibly the source of any water damage. This work includes general construction, electrical, technology, and may include abatement, etc.
The above construction Statement Of Work (SOW) constitutes a basic outline of work and in no way outlines all of the details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specification be initiated to determine the needs and conditions for the construction of this project.
Period of Performance: All phases of work completed within 90 days after issuance of the Notice to Proceed.
Files
| File | Type | Posted |
|---|---|---|
| 36C25024B0019 0002.docx | DOCX document | |
| 36C25024B0019_1.docx | DOCX document | |
| 36C25024B0019 0001.docx | DOCX document | |
| Attachment 1 - Replace Damaged Flooring - Drawings.pdf | ||
| WD.txt | TXT text file | |
| 36C25024B0019_1.pdf | ||
| Attachment 2 - Replace Damaged Flooring - Project Manual Specs.pdf | ||
| Attachment 7 - EMR.docx | DOCX document | |
| Attachment 3 - VAAR 852.219-75 VA Notice of Limitations on Subcontracting (JAN 2023).pdf | ||
| Attachment 4 - VHA_Directive_1192.pdf | ||
| Attachment 5 - RFI Form-36C25023B0034.docx | DOCX document |
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Z1DA--Replace Damaged Flooring 539-23-202 | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Z2DA--612A4-27-018 | Replace B650 3rd and 2nd Flooring | Veterans Integrated Service Network 21 | Service-Disabled Veteran-Owned Small Business | |
| C1DA--AE Replace Roofing Cx - 539-25-101 | Veterans Integrated Service Network 10 | Service-Disabled Veteran-Owned Small Business | |
| Z2DA--Repair & Replace Flooring in BLDG 10A | Veterans Integrated Service Network 7 | Total Small Business | |
| Y1DA--FY27 NRM | 619-24-103 | Replace Flooring & Repair Walls in Building 1 (VA-27-00012190) | Veterans Integrated Service Network 7 | Service-Disabled Veteran-Owned Small Business | |
| C1DA--AE Replace Roofing 539-25-101 | Veterans Integrated Service Network 10 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity