Z1DA--Project# 676-21-702 EHRM installation of DDPO Department of Veterans Affairs Tomah VA Medical Center

Closed Solicitation Posted

Solicitation number
36C25222B0027
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks a contractor to install additional data drops, power outlets, and equipment mounting hardware at the Tomah VA Medical Center in Tomah, Wisconsin to support implementation of an electronic health record system. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 is procuring these installation services through a firm-fixed-price contract with a period of performance of 80 calendar days from the notice to proceed. Proposals were due by June 1, 2022 and evaluation will consider technical approach, past performance, and price. The contractor must follow all specifications and drawings to complete cabling and infrastructure work in accordance with infection control protocols.

This opportunity is set aside for service-disabled veteran-owned small businesses. The relevant NAICS code is 238210, covering electrical contractors, and work will be performed at the Tomah VA Medical Center campus. The solicitation estimates the contract value will be between $250,000 to $500,000 to install over 200 end user devices across multiple departments and buildings, with completion expected within 60 days of notice to proceed. Drawings depict locations for new data and power connections in clinical, administrative, and other facility areas.

Notice text

3 versions

Update #3 · Latest ·

SOLICITATION: 36C25222B0027

AMENDMENT: 0002

May 24, 2022

Project: EHRM Installation of Data Drops and Power Outlets (DDPO)

Project Number: 676-21-702

Location: Tomah VA Medical Center, Tomah, WI

Amendment 0002 hereby incorporates the following clarifications/change(s) into the solicitation package.

A: Clarification of BID Opening Date:

Date remains as Wednesday, June 1, 2022, at 12:30 PM.

Due to national COVID-19 pandemic masks are required.

B: Clarification of Attachments:

The following attachments have been updated with numbers. Please make appropriate changes.

Att 1 SOW - Solicitation

Att 2 Project Drawings 12.20.21 - Solicitation

Att 2.1 - Updated Drawings 5.23.22 Amendment 0001

Att 3 - Wage Determination 4.29.22 Amendment 0001

Att 4 Specifications - Solicitation

Att 5 - List of End User Devices Amendment 0001

C. Attached:

Att 6 Site-Visit Sign-In Sheet 5.3.22 Amendment 0002

(End of Document)

Update #2 ·

SOLICITATION: 36C25222B0027

AMENDMENT: 0001

May 23, 2022

Project: EHRM Installation of Data Drops and Power Outlets (DDPO)

Project Number: 676-21-702

Location: Tomah VA Medical Center, Tomah, WI

Amendment 0001 hereby incorporates the following clarifications/change(s) into the solicitation package.

A: BID opening Date Change:

Date has been extended from Wednesday, May 25, 2022, to Wednesday, June 1, 2022.

*Wednesday June 1, 2022, at 12:30 PM (CST)

Due to national COVID-19 pandemic masks are required.

B. Questions and Answers

Received from Contractor on 5/6/2022

There are no electrical rooms shown on published drawings to show where to get power. Can you provide the locations from which we will get power for the outlet installation? We suggest that we use the panels located near each area of work; please confirm

VA REPLY: See revised drawings provided in this amendment.

On the site visit it was mentioned that there would be specific ICRA requirements in the CLC areas, but we do not see these areas clearly identified on the drawings. Can you confirm which locations have specific dust/containment requirements and what these requirements are?

VA REPLY: The Tomah VAMC operates all areas with the same listed ICRA level; no exemptions are made on campus. We are requesting that contractors be COVID tested every 72 hours while working in CLC spaces on campus. This testing is provided by the Tomah VA once registration is completed with employee health. The process usually takes less than 20 minutes to register.

What is the required shut-down process for installing power in panels and who must this be coordinated with?

VA REPLY: A utility outage sheet must be filled out and provided to the VA with coordination between engineering and Facility services. This request needs to be submitted two weeks prior to requested shutdown.

Who is responsible for moving equipment that is located in areas where new devices are to be installed?

VA REPLY: This is the contractor s responsibility.

Will free air cabling be allowed? The ceilings appear to be very congested and conduit installation will be very difficult.Â

VA REPLY: J hooks for Category 6A needs to be used for cables to properly support cabling. Â

Will MC type cable be allowed?

VA REPLY: MC cable is NOT allowed.

Are there alternate drawings for Bldgs. 411 and 412 - the device locations on these drawings appear to be off - (ex., one of them shows data and power in a restroom)

VA REPLY: See revised drawings provided in this amendment.

On the site visit it was noted that there are some ongoing construction/remodeling projects (blood lab and urgent care areas). Will the SOW incorporate the new data and power needs for these areas or is it excluded from this SOW?

VA REPLY: At this time, they will still be included due to timelines of spaces being worked on.

Please confirm the available working hours, any restricted areas, any areas needing advanced notice and coordination process for any limited access areas.

VA REPLY: Standard work hours are detailed in the SOW, area with restricted access are CLC spaces on campus which are focused in 2nd and 3rd floors in 400 buildings except 407 and 408. 411 and 412 are also CLC spaces. Most work can be completed during the day with coordination with nurse managers on floors. For CLC spaces ensure testing is completed before entering spaces.

Is there a published Wage Determination document associated with this solicitation? Â

VA REPLY: Davis-Bacon Act WD # WI20220011. See Amendment 0001 attachment.

Page 1 of SOW document refers to Attachment 1 and Attachment 2, but I do not find documents with this naming. Please advise, where can I locate a copy of Attachment 1 - List of Devices and Attachment 2 - locations (I presume that the drawing package may serve as Attachment 2) Attachment 1 - has been added to the solicitation, and you are correct on attachment 2.

C. Attachments:

Att 1 - Wage Determination

Att 2 - Updated Drawings

Att 3 - List of End User Devices

D. Forthcoming

Site Visit Sign in sheet

(End of Document)

Update #1 ·

Please see attached.

Files

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Z1DA--Project# 676-21-702 EHRM installation of DDPO Tomah VA Medical Center Tomah, WI Solicitation
Z1DA--Project# 676-21-702 EHRM installation of DDPO Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Z1DA--Project No. 583-22-106- Replace Electrical Panels & Expand Distribution. NAICS 238210 Veterans Integrated Service Network 10 No set-aside
540-22-700 | EHRM Infrastructure Upgrades Construction | Clarksburg WV Clarksburg, West Virginia 26301, United States · NAICS 236220 VA Technology Acquisition Center Service-Disabled Veteran-Owned Small Business
Y1DA--667-22-700 | EHRM Infras Upgrades | Shreveport, LA | Overton Brooks VA Medical Center Shreveport, Louisiana 71191, United States · NAICS 236220 VA Technology Acquisition Center No set-aside
Z2DA--657-24-102JC - Prepare Site for New PET/CT, Room A011D 915 N Grand Blvd, St. Louis, MO 63106 · NAICS 236220 Veterans Integrated Service Network 15 Service-Disabled Veteran-Owned Small Business
Z2DA--564-26-706 | EHRM JSA/FDSS | Fayetteville, AR NAICS 236220 VA Technology Acquisition Center No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors