Z1DA--project 528A8-22-816 - consolidate primary care phase 1A bathrooms
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 36C24224B0037
- Agency
-
Veterans Integrated Service Network 2
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 2 is seeking bids for a construction project to renovate and reconfigure existing office spaces on the first floor of the Samuel S. Stratton VA Medical Center in Albany, New York. The project involves converting approximately 500 square feet of space into new public restrooms, including a Men's Restroom and a Women's Restroom that meet ADA and VA Barrier Free Design Standards. Key requirements include demolition, new finishes, lighting, HVAC, plumbing, electrical, and fire protection work. The contractor will be required to utilize the VISN 2 Autodesk Build Construction management platform for all project-related communications and collaboration. Bids are due by August 19, 2024.
This solicitation is not set aside for any particular business type. The contract will be awarded on a Firm-Fixed-Price basis and must be completed within 180 days of the Notice to Proceed. There are no incumbent contractors identified. The project has an estimated budget but no specific award value range is provided. The place of performance is the Samuel S. Stratton VA Medical Center in Albany, New York.
Notice text
6 versions
Update #6 · Latest ·
This amendment answers the following vendor questions:
Will AISC certification for fabricators and/or erectors be waived for this project? These limit competition and local participation.
AISC certification is required per the specifications so will not be waivered
The Bid Form lists (3) Deduct Alternates, but drawings describe (5) Alternates. Please clarify.
The project originally had five alternates included in the design, however it was decided to remove two of the alternates (#2 Canopy and #3 Pneumatic system) from the project completely. The VA does not have funds to alter the drawings to show the removal of alternates #2 and #3, however the removal of the two alternates is stated in the drawing notes. For this solicitation only alternates #1, #4 and #5 listed in the drawings are to be included in the submitted proposal.
The following specifications are included in the specifications but do not appear in the table of contents. Are these intended to be included?
07 13 52 MODIFIED BITUMINOUS SHEET WATERPROOFING
13 34 19 METAL BUILDING SYSTEMS
Both missing specifications have been attached to this amendment.
All other terms and conditions remain the same.
This
Update #5 ·
This pre-solicitation notice is to inform potential offerors that the Albany NY VA Medical Center will be posting a solicitation (36C24224B0047) on or about August 15th, 2024, to provide all labor, materials, tools, equipment, and supervision necessary to complete the REPLACE MAIN BOILERS project (528A8-17-805).
This project involves replace the existing electrical equipment and install new switchgear equipment in both the chiller and boiler plants, install two temporary boilers, and replace the three existing boilers.
It has been determined that there are qualified firms in accordance with Public Law 109-461 that are capable of performing under NAICS Code 238220, "Plumbing, Heating, and Air-Conditioning Contractors", with a size standard of $19.5M. Therefore this procurement is 100% set-aside for Small Businesses. The estimated construction value of this is between $20,000,000.00 and $50,000,000.00. Information regarding the scheduled site visit will be stated in the Solicitation. Bid bonding will be required to respond to this IFB once released.
OBTAINING SOLICITATION MATERIAL
Solicitation materials consisting of the Information for Bid Details, Specifications, Drawings and Contract Forms will be available on http://www.sam.gov in electronic format only. These should be available on or about August 15th, 2024. A Bidder's mailing list, list of interested parties and/or list of attendees at site visits WILL NOT be prepared nor distributed by the Contract Specialist. SOLICITATION AMENDMENTS: Amendments to the solicitation will be posted at http://www.sam.gov. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Offerors are reminded that they are responsible for obtaining and acknowledging all amendments to this solicitation and attaching to their bid. All bids and correspondence will be by email only to the Contracting Officer: Michael.Spivack@va.gov.
Update #4 ·
(I$RFP-HEADER)
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS (a) Bidding materials consisting of Invitation for Bids, drawings, specifications and contract forms will be available on http://www.sam.gov in electronic format only. All interested parties (subs & primes) should register at http://www.sam.gov as an Interested Vendor so that others will know of your interest in participating in this procurement. A Bidder s mailing list WILL NOT BE prepared by the Contract Specialist. SOLICITATION AMENDMENTS: Amendments to the solicitation will be posted at http://www.sam.gov. Paper copies of the amendments will NOT be individually mailed. By registering to Receive Notification , you will be notified by e-mail of any new amendments that have been issued and posted. No other notification of amendments will be provided. Offerors are reminded that they are responsible for obtaining and acknowledging all amendments to this solicitation prior to the time for receipt of offers. (b) If bid exceeds $150,000 a bid bond must be submitted. A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for opening of bids, will require rejection of the bid in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then. (c) If the contract will exceed $150,000 (see FAR 28.102-1 for lesser amount), the bidder to whom award is made will be required to furnish two bonds, a Payment Bond, SF 25A, and a Performance Bond, SF 25, each in the penal sum as noted in the General Conditions of the Specification. Copies of SFs 25 and 25A may be obtained upon application to the issuing office. (d) If the bid/offer is between $30,000 - $150,000 The bidder/offeror to whom award is made will be required to furnish a Payment Bond, Standard Form 25A or alternative payment protection which conforms to the requirements set forth in FAR Clause 52.228-13, Alternative Payment Protections, as noted in the General Conditions of this Specification. Copies of the Standard Form of Payment Bond may be obtained upon application to the Issuing Office.
PROJECT BID ITEMS A single award will be made on the Base Bid. BASE BID: All work required in the construction documents (including but not limited to drawings, specifications, addenda, and contract documents). Fill in price SF 1442 BOX 17, BASE BID (use ink) BID SUBMISSION
The following documents are to be included in the bid submission:
One (1) signed SF 1442 page 2, Offer page, with blocks 14-20c completed.
Acknowledgment of all amendments must be accomplished either via entering data in block nineteen (19) of the SF1442 or completing blocks fifteen (15) a, b, and c of the amendment and attaching it to the SF 1442 Offer page.
One (1) original completed/signed SF24 Bid Bond and Power Of Attorney as required.
Safety or Environmental Violations and Experience Modification Rate:
All Bidders/Offerors shall submit the following information pertaining to their past Safety and Environmental record. The information shall contain, at a minimum, a certification that the bidder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years.
All Bidders/Offerors shall submit information regarding their current Experience Modification Rate (EMR). This information will be obtained from the bidder s/offeror s insurance company and be furnished on the insurance carrier s letterhead.
Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead may obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR will obtain their EMR rating from their state run worker s compensation insurance rating bureau.
Bidders are responsible for ensuring and verifying their bid and all required bid documents are received at the address designated in block eight (8) of the SF 1442 solicitation and by the date and time specified in block thirteen (13)a of the SF 1442 solicitation (subject to amendment).
DELIVERY OF BIDS
Due to COVID-19 concerns, there will not be a face-to-face public bid opening. In accordance with FAR 14.202-8, send all submission documents via email to Michael.Spivack@va.gov by 10:00 AM EST Thursday, August 15th, 2024. Bids received after this time may be rejected. All Contractors providing an electronic bid submission must still meet all requirements listed under Bid Submission in the solicitation. The bid opening and public reading of the bids will be via teleconference. Bidders may call +1 347-566-4838 at 10:15 PM EST and enter participant code 334 786 112# to join.
The bid submission emails will be kept in an electronic folder unread until 10:15 PM EST when they will be opened and read to the public. **NOTE: PLEASE ALLOW AT LEAST 30 MINUTES FOR BIDS TO ARRIVE IN EMAIL**
After all bids have been read, the apparent low bidder shall submit the signed original copy of the bid and all required documents, including bonds via mail to:
Department of Veterans Affairs Network Contracting Office 2 Attn: Michael Spivack 2875 Union Rd, Suite 3500 Cheektowaga, NY 14227
Files should be in Adobe* PDF (Portable Document Format) Files:Â Size:Â Maximum size of the e-mail message shall not exceed five (5) megabytes. If the size limits are exceeded, the VA may not receive the file and/or you may not be considered. Only one email is permitted. This email should contain at least the following as separate attachments: One (1) signed SF1442 with amendments acknowledged. Include response to FAR 52.204-8(2) (i) or (ii) Annual Representations and Certifications Response to FAR 52.209-13(b)(1) or (2) Violation of Arms Controls Treaties or Agreements One (1) complete signed SF 24 Bid Bond and Power of Attorney. One (1) safety or environmental violations and experience modification rate. One (1) Class Deviation to Implement SDVOSB and VOSB Certification Requirements
Any exception to the terms and conditions of this Invitation for Bid (IFB) will result in a nonresponsive bid.
Failure to provide a definitive price will result in a nonresponsive bid.
Receipt of bids must be in accordance with terms and conditions of this IFB.
Bidders must acknowledge (in writing only) amendments to this solicitation, otherwise a bid may be determined nonresponsive.
The winning bidder must be determined as "responsible" by the Contracting Officer in accordance with FAR Part 9, Contractor Qualifications.
Update #3 ·
This amendment is to answer the following series of vendor questions regarding difficulties printing the drawings attached to this solicitation:
Q: I am reviewing the bid package and noticed the drawings were plotted to 8.5 x11 . Could you please get us a full-sized set ahead of the site visit? Thank you.
A: The COR checked the files and there are no issues. Go to advanced print settings and change the print size.
Q: If I do that, the drawings still won t scale properly for our takeoffs. Can we get a new version from the Architect that is plotted to 42x30 so that we can scale the drawings correctly?
Using the ¼ = 1 scale referenced in the drawing, everyone should get the same dimensions listed on the drawing. The drawings scale accurately on the Architect s version, but my conversion of the 11x8.5 leads to takeoffs that are low by 8-10%.
If there is another solution that I can pass on to my team and subs, please let me know.
A: The COR downloaded the files off of the solicitation and had no issues. The Autocad files were checked by the Architect to make sure the windows set into the plans didn t slip off the scale, but they are locked in at ¼ or ½ scales appropriately so the pdf s created should be correct if printed properly.
If they are printing off BlueBeam, the Page Scaling should be set to NONE. If using Acrobat, the print window with ACTUAL SIZE should be checked.
If they select a 30x42 sheet but still select fit to paper that will actually change the scale in a minor way.
All other terms and conditions remain the same.
Update #2 ·
"General Decision Number: NY20240002 07/12/2024
Superseded General Decision Number: NY20230002
State: New York
Construction Types: Building, Heavy and Highway
Counties: Albany, Columbia, Fulton, Greene, Montgomery,
Rensselaer, Saratoga, Schenectady, Schoharie and Washington
Counties in New York.
BUILDING CONSTRUCTION PROJECTS (For all counties except
COLUMBIA, FULTON, GREENE & MONTGOMERY) (does not include single
family homes and apartments up to a including 4 stories), HEAVY
AND HIGHWAY CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally
required to pay at least the applicable minimum wage rate
required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered
contracts entered into by the federal government that are
subject to the Davis-Bacon Act itself, but do not apply to
contracts subject only to the Davis-Bacon Related Acts,
including those set forth at 29 CFR 5.1(a)(1).
______________________________________________________________
|If the contract is entered |. Executive Order 14026 |
|into on or after January 30, | generally applies to the |
|2022, or the contract is | contract. |
|renewed or extended (e.g., an |. The contractor must pay |
|option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $17.20 per hour (or |
| | the applicable wage rate |
| | listed on this wage |
| | determination, if it is |
| | higher) for all hours |
| | spent performing on the |
| | contract in 2024. |
|______________________________|_____________________________|
|If the contract was awarded on|. Executive Order 13658 |
|or between January 1, 2015 and| generally applies to the |
|January 29, 2022, and the | contract. |
|contract is not renewed or |. The contractor must pay all|
|extended on or after January | covered workers at least |
|30, 2022: | $12.90 per hour (or the |
| | applicable wage rate listed|
| | on this wage determination,|
| | if it is higher) for all |
| | hours spent performing on |
| | that contract in 2024. |
|______________________________|_____________________________|
The applicable Executive Order minimum wage rate will be
adjusted annually. If this contract is covered by one of the
Executive Orders and a classification considered necessary for
performance of work on the contract does not appear on this
wage determination, the contractor must still submit a
conformance request.
Additional information on contractor requirements and worker
protections under the Executive Orders is available at
http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/05/2024
1 03/08/2024
2 04/05/2024
3 07/05/2024
4 07/12/2024
ASBE0040-002 05/01/2024
Rates Fringes
Asbestos/Insulator Worker
SCOPE OF WORK: includes
application of all
insulating materials,
protective, coverings,
coating and finishing to
all types of mechanical
systems.....................$ 40.46 26.86
HAZARDOUS MATERIAL HANDLER
Duties limited to
preparation wetting;
stripping; removal;
scrapping; vacuuming;
bagging; and disposing of
all insulation materials,
whether they contain
asbestos or not from
mechancial systems..........$ 38.40 24.42
----------------------------------------------------------------
BOIL0197-002 01/01/2021
Rates Fringes
BOILERMAKER......................$ 38.59 26.00
----------------------------------------------------------------
BRNY0002-019 07/01/2018
Rates Fringes
BRICKLAYER
BRICKLAYERS, STONE MASONS,
CEMENT MASONS, PLASTERERS,
POINTERS, CAULKERS &
CLEANERS....................$ 36.19 20.48
HEAVY & HIGHWAY
CONSTRUCTION
CEMENT MASONS..............$ 37.23 19.51
MARBLE, TILE & TERRAZZO
FINISHERS...................$ 27.16 16.85
MARBLE, TILE & TERRAZZO
WORKERS.....................$ 34.66 19.58
----------------------------------------------------------------
CARP0279-006 07/01/2019
Rates Fringes
Carpenters:
HEAVY AND HIGHWAY
CONSTRUCTION (COLUMBIA AND
GREENE COUNTIES)
Carpenters, Millwrights,
Pile Drivers...............$ 38.09 29.08
----------------------------------------------------------------
CARP0291-005 07/01/2022
Rates Fringes
Carpenters:
SARATOGA COUNTY
BUILDING....................$ 34.00 23.18
WASHINGTON COUNTY
BUILDING....................$ 29.00 22.46
PAID HOLIDAYS: Labor Day, provided the employee has been on
the payroll the calender week or any of the holiday week
preceding the holiday and works the day after the holiday.
----------------------------------------------------------------
CARP0291-008 07/01/2022
ALBANY, FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND
SCHOHARIE COUNTIES
Rates Fringes
Carpenters:
BUILDING CONSTRUCTION
(Excluding Montgomery
County)
Carpenters & Soft Floor
Layers.....................$ 34.00 23.18
Piledriver.................$ 31.68 20.60
HEAVY & HIGHWAY
CONSTRUCTION
Carpenters.................$ 37.52 23.55
----------------------------------------------------------------
CARP0291-010 07/01/2022
Rates Fringes
Carpenters:
CARPENTERS..................$ 37.52 23.55
DIVER TENDERS...............$ 34.02 21.10
DIVERS (Dry Day)............$ 38.52 23.55
DIVERS......................$ 62.52 23.55
PILEDRIVERS.................$ 33.02 21.10
----------------------------------------------------------------
ELEC0236-001 06/01/2023
ALBANY; COLUMBIA; FULTON; GREENE (that portion North of a line
following the south limits of the city of Catskill);
MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE;
WASHINGTON
Rates Fringes
ELECTRICIAN......................$ 46.50 31.31
----------------------------------------------------------------
ELEC0363-004 04/01/2023
GREENE COUNTY (Portion of)
Rates Fringes
ELECTRICIAN......................$ 45.50 3%+37.67+a
FOOTNOTE:
a. Paid Holidays: New Year's Day, President's Day, Memorial
Day, Fourth of July, Labor Day, Presidential Election Day,
Veteran's Day, Thanksgiving Day, Day after Thanksgiving,
Christmas Day
----------------------------------------------------------------
ELEC1249-003 05/01/2023
Rates Fringes
ELECTRICIAN (LINE
CONSTRUCTION: LIGHTING AND
TRAFFIC SIGNAL Including any
and all Fiber Optic Cable
necessary for Traffic Signal
Systems, Traffic Monitoring
systems and Road Weather
information systems)
Flagman.....................$ 29.59 7%+35.40
Groundman (Truck Driver)....$ 39.46 7%+35.40
Groundman Truck Driver
(tractor trailer unit)......$ 41.92 7%+35.40
Lineman & Technician........$ 49.32 7%+35.40
Mechanic....................$ 39.46 7%+35.40
FOOTNOTE:
a. New Year's Day, Memorial Day, Independence Day, Labor
Day, Thanksgiving Day, Christmas Day, plus President's Day,
Good Friday, Decoration Day, Election Day for the President
of the United States and Election Day for the Governor of
the State of New York, provided the employee works the day
before or the day after the holiday.
----------------------------------------------------------------
ELEC1249-004 05/01/2023
Rates Fringes
ELECTRICIAN (Line
Construction)
Overhead and underground
distribution and
maintenance work and all
overhead and underground
transmission line work
including any and all
fiber optic ground wire,
fiber optic shield wire or
any other like product by
any other name
manufactured for the dual
purpose of ground fault
protection and fiber optic
capabilities :
Flagman....................$ 34.44 7%+35.40
Groundman digging machine
operator...................$ 51.66 7%+35.40
Groundman truck driver
(tractor trailer unit).....$ 48.79 7%+35.40
Groundman Truck driver.....$ 45.92 7%+35.40
Lineman and Technician.....$ 57.40 7%+38.40
Mechanic...................$ 45.92 7%+35.40
Substation:
Cable Splicer..............$ 63.14 7%+38.40
Flagman....................$ 34.44 7%+35.40
Ground man truck driver....$ 45.92 7%+35.40
Groundman digging machine
operator...................$ 51.66 7%+35.40
Groundman truck driver
(tractor trailer unit).....$ 48.79 7%+35.40
Lineman & Technician.......$ 57.40 7%+38.40
Mechanic...................$ 45.92 7%+35.40
Switching structures;
railroad catenary
installation and
maintenance, third rail
type underground fluid or
gas filled transmission
conduit and cable
installations (including
any and all fiber optic
ground product by any
other name manufactured
for the dual purpose of
ground fault protection
and fiber optic
capabilities), pipetype
cable installation and
maintenance jobs or
projects, and maintenance
bonding of rails; Pipetype
cable installation
Cable Splicer..............$ 64.59 7%+38.40
Flagman....................$ 35.23 7%+35.40
Groundman Digging Machine
Operator...................$ 52.85 7%+35.40
Groundman Truck Driver
(tractor-trailer unit).....$ 49.91 7%+35.40
Groundman Truck Driver.....$ 46.98 7%+35.40
Lineman & Technician.......$ 58.72 7%+38.40
Mechanic...................$ 46.98 7%+35.40
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial
Day, Good Friday, Independence Day, Labor Day, Thanksgiving
Day, Christmas Day, and Election Day for the President of
the United States and Election Day for the Governor of New
York State, provided the employee works two days before or
two days after the holiday.
----------------------------------------------------------------
ELEC1249-007 05/01/2023
COLUMBIA COUNTY
Rates Fringes
ELECTRICIAN (LIGHTING AND
TRAFFIC SIGNAL INCLUDING ANY
AND ALL FIBER OPTIC CABLE
NECESSARY FOR THE TRAFFIC
SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD
WEATHER INFORMATION SYSTEMS)
Flagman.....................$ 30.36 7%+35.40
Groundman Digging Machine
Operator....................$ 45.54 7%+35.40
Groundman Truck Driver
(Tractor-trailer unit)......$ 43.01 7%+35.40
Groundman Truck Driver......$ 40.48 7%+35.40
Lineman and Technician......$ 50.60 7%+38.40
Mechanic....................$ 40.48 7%+35.40
PAID HOLIDAYS:
a. Memorial Day, New Year's Day, President's Day, Good
Friday, Decoration Day, Independence Day, Labor Day,
Thanksgiving Day, Christmas Day, and Election Day for the
President of the United States and Election Day for the
Governor of New York State, provided the employee works two
days before or two days after the holiday.
----------------------------------------------------------------
ELEC1249-008 01/01/2024
Rates Fringes
ELECTRICIAN (Line
Construction)
TELEPHONE, CATV
FIBEROPTICS CABLE AND
EQUIPMENT
Cable splicer..............$ 39.24 3%+5.70
Groundman..................$ 19.74 3%+5.70
Installer Repairman-
Teledata
Lineman/Technician-
Equipment Operator.........$ 37.24 3%+5.70
Tree Trimmer................$ 31.45 3%+10.48
a. New Year's Day, President's Day, Good Friday, Decoration
Day, Independence Day, Labor Day, Veteran's Day,
Thanksgiving Day, Day after Thanksgiving, Christmas Day.
----------------------------------------------------------------
ELEV0035-001 01/01/2024
ALBANY; COLUMBIA (Towns of Claverack, Hillsdale, Ghent,
Stockport, Austerlitz, Canaan, New Lebanon, Chatham,
Kinderhook, Styvesant and Greenport); FULTON; GREENE (Towns of
Durham, Greenville, New Baltimore, Coxcsackie and Athens);
MONTGOMERY, RENSSELAER, SARATOGA, SCHENECTADY, SCHOHARIE AND
WASHINGTON COUNTIES
Rates Fringes
Elevator Constructor.............$ 55.32 37.885+a+b
FOOTNOTE:
a.Vacation: 6%/under 5 years based on regular hourly rate for
all hours worked. 8%/over 5 years based on regular hourly
rate for all hours worked.
b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence
Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday
after Thanksgiving Day; and Christmas Day.
----------------------------------------------------------------
ELEV0138-004 01/01/2024
COLUMBIA COUNTY (THE TOWNS OF ANCRAM, CLERMONT, COPAKE,
GALLATIN, GERMANTOWN, LIVINGSTON, AND TAGHKANIC); GREEN COUNTY
(THE TOWNS OF HUNTER AND CATSKILL)
Rates Fringes
ELEVATOR MECHANIC................$ 70.15 37.885+a+b
FOOTNOTE:
a.Vacation: 6%/under 5 years based on regular hourly rate for
all hours worked. 8%/over 5 years based on regular hourly
rate for all hours worked.
b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence
Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday
after Thanksgiving Day; and Christmas Day.
----------------------------------------------------------------
ENGI0158-008 07/01/2022
BUILDING
EXCLUDING MONTGOMERY COUNTY
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP A(1)..................$ 47.81 30.74
GROUP A.....................$ 47.32 30.74
1..........................$ 49.06 30.74
2..........................$ 50.06 30.74
GROUP B.....................$ 46.30 30.74
GROUP C.....................$ 43.40 30.74
Hazardous work - Anytime Operating Engineers are involved
with level C or above, $2.50 per hour over regular rate.
FOOTNOTE:
a. Paid Holidays: New Years Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, Christmas Day.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS (BUILDING):
GROUP A(1): Crane, hydraulic cranes, tower crane, locomotive
crane, piledriver, cableway, derricks, whirlies, dragline,
boom truck (over 5 tons)
GROUP A(1): Crane Premiums:
1 over 150'- $1.00
2 over 200'- $2.00
GROUP A: Shovel, All Excavators (including rubber tire full
swing), gradalls, power road grader, all CMI equipment,
front-end rubber tire loader, tractor-mounted drill (quarry
master), mucking machine, concrete central mix plant,
concrete pump, Belcrete system, automated asphalt concrete
plant and tractor road paver, boom truck (5 tons and
under), maintenance engineer, self contained crawler,
drill-hydraulic rock drill.
GROUP B: Backhoe, (rubber-tired backhoe/loader combination),
bulldozer, pushcat, tractor, traxcavator, scraper,
LeTourneau grader, form fine grader, road roller, blacktop
roller, blacktop spreader, power brooms, sweepers,
trenching machine, Barber Green loader, side booms,
hydrohammer, concrete spreader, concrete finishing machine,
one drum hoist, power hoisting (single drum), hoist - two
drum or more, three drum engine, power hoisting (two drum
and over), two drum and swinging engine, three drum
swinging engine, hod hoist, A-L frame winches, cord and
well drillers (one drum), post hole digger, model CHB
Vibro-Tamp or similar machine, batch bin and plant
operator, dinkey locomotive, skid steer loader, track
excavator 5/8 cu. yd. or smaller
GROUP C: Fork lift, high lift, lull, oiler, fireman and
heavy- duty greaser, boilers, and steam generators, pump,
vibrator, motor mixer, air compressor, dust collector,
welding machine, well point, mechanical heater, generators,
temporary light plants, concrete pumps, electric
submersible pump 4"" and over, murphy type diesel generator,
conveyor, elevators, concrete mixer and belcrete power pack
(belcrete system), seeding, and mulching machines, pumps
----------------------------------------------------------------
ENGI0158-026 07/01/2022
HEAVY & HIGHWAY
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 49.42 29.55
GROUP 2.....................$ 48.51 29.55
GROUP 3.....................$ 45.94 29.55
GROUP 4.....................$ 53.42 29.55
GROUP 5.....................$ 52.42 29.55
GROUP 6.....................$ 51.42 29.55
GROUP 7.....................$ 51.03 29.55
POWER EQUIPMENT OPERATOR CLASSIFICATIONS (HEAVY & HIGHWAY):
GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform,
Automated Concrete Spreader (CMI Type), Automatic Fine
Grader, Backhoe (Except Tractor Mounted, Rubber Tired),
Backhoe Excavator Full Swing (CAT 212 or similar type),
Back Filling Machine, Belt Placer (CMI Type), Blacktop
Plant (Automated), Boom truck , Cableway, Caisson Auger,
Central Mix Concrete Plant (Automated), Concrete Curb
Machine, Self Propelled, Slipform, Concrete Pump, Crane,
Cherry Picker, Derricks (steel erection), Dragline,
Overhead Crane (Gantry or Straddle type), Pile Driver,
Truck Crane, Directional Drilling Machine, Dredge, Dual
Drum Paver, Excavator (All Purpose Hydraulically Operated)
(Gradall or Similar), Front End Loader ( 4 cu. yd. and
Over), Head Tower (Sauerman or Equal), Hoist (Two or Three
Drum), Holland Loader, Maintenance Engineer, Mine Hoist,
Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB-4
and similar type, Power Grader, Profiler (over 105 H.P.)
Quad 9, Quarry Master (or equivalent), Scraper, Fireman,
Form Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic
self-propelled), Hydra-Spiker, ride-on, Hydraulic Pump
(jacking system), Hydro-Blaster (Water), Mulching Machine,
Oiler, Parapet Concrete or Pavement, Shovel, Side Boom,
Slip Form Paver, Tractor Drawn, BeltType Loader, Truck or
Trailer Mounted Log , Chipper (Self Feeder), Tug Operator
(Manned Rented Equipment Excluded), Tunnel Shovel
GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber
Tired), Bituminous Recycler Machine, Bituminous Spreader
and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary
Drill (Truck or Tractor Mounted), Boring Machine, Cage
Hoist, Central Mix Plant (NonAutomated) and All Concrete
Batching Plants, Cherry Picker (5 tons capacity and under),
Concrete Paver (Over 16S), Crawler Drill, Self-contained,
Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted,
Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication
Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One
Drum), Hydro-Axe, Kolman Plant Loader and Similar Type
Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for
stabilized base selfpropelled), Monorail Machine, Plant
Engineer, Profiler (105 H.P. and under), Grinder, Post Hole
Digger and Post Driver, Power Broom (towed), Power
Heaterman, Power Sweeper, Revinius Widener, Roller (Grade
and Fill), Scarifier, ride-on, Shell Winder, Skid steer
loader (Bobcat or similar), Span-Saw, ride-on, Steam
Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant
Refrigeration Equipment (for soil stabilization)Road
Widener, Roller (all above subgrade), Sea Mule,
Self-contained Ride-on Rock Drill, Excluding Air-Track Type
Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.
Tugger Hoist, Vermeer saw (ride on, any size or type),
Winch, Winch Cat
GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy
Hauler, Aggregate Plant, Asphalt or Concrete Grooving,
Machine (ride on), Ballast Regulator, Ride-on Boiler (used
in conjunction with production), Bituminous Heater,
self-propelled, Boat (powered), Cement and Bin Operator,
Compressors, Dust Collectors, Fork Lift, Generators, Pumps,
Welding Machines, Light Plants, Heaters (hands-off
equipment), Concrete Pavement Spreader and Finisher,
Concrete Paver or Mixer (16S and under), Concrete Saw
(self-propelled), Conveyor, Deck Hand, Directional Drill
Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor
with accessories, Fine Grade Machine, Tamper, ride-on, Tie
Extractor, ride-on, Tie Handler, ride-on, Tie Inserter,
ride-on, Tie Spacer, ride-on, Tire Repair, Track Liner,
ride-on, Tractor, Tractor (with towed accessories),
Vibratory Compactor, Vibro Tamp, Well Point
GROUP 4: Tower Cranes
GROUP 5: Cranes 50 tons and over
GROUP 6: Cranes 49 tons and below
GROUP 7: Master Mechanic
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, and Christmas Day
----------------------------------------------------------------
IRON0012-011 07/01/2023
ALBANY; COLUMBIA; FULTON (Albin, Bleecker, Broad, Johnstown,
Mayfield, Northampton and Perth); GREENE, MONTGOMERY
(Amsterdam, Charleston, Florida, Glen, Mohawk and Root);
RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; and WASHINGTON
COUNTIES:
Rates Fringes
Ironworkers:
Sheeter, Bucker-up..........$ 34.75 26.83
Sheeter.....................$ 34.75 26.83
Structural, Ornamental,
Rodman, Machinery Mover,
Rigger, Fence Erector,
Reinforcing, Stone
Derrickmen..................$ 34.50 26.83
----------------------------------------------------------------
IRON0440-007 07/01/2023
FULTON (Twps. of Caroga, Ephratah, Oppenheim, Stratford);
MONTGOMERY (Twps of Canajoharie, Minden, Palatine, St.
Johnsville):
Rates Fringes
IRONWORKER
Structural, Ornamental,
Rodman, Machinery Mover,
Rigger, Fence Erector,
Reinforcement, and Stone
Derrickman..................$ 32.00 31.00
----------------------------------------------------------------
LABO0017-001 07/01/2019
COLUMBIA COUNTY (Twps of Greenport, Claverack, Clermont,
Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake,
Ancram, Philmont and the City of Hudson)
Rates Fringes
LABORER
COLUMBIA COUNTY (Townships
of Greenport, Claverack,
Clermont, Germantown,
Livingston, Hillsdale,
Taghkanic, Gallatin,
Copake, Ancram, Philmont,
and the City of Hudson)
(Asbestos, lead, toxic and
hazardous waste abatement
and any other
environmental related
work) HEAVY & HIGHWAY
GROUP 1:...................$ 38.90 27.15+a
GROUP 2:...................$ 43.15 27.15+a
GREENE COUNTY (Township of
Catskill) HEAVY & HIGHWAY:
GROUP 1:...................$ 34.15 27.15+a
GROUP 2:...................$ 38.90 27.15+a
GROUP 3:...................$ 43.15 27.15+a
GROUP 4:...................$ 48.00 27.15+a
TUNNEL, SHAFT & CAISSON
WORK
GROUP 1....................$ 48.05 29.50+a
For HEAVY & HIGHWAY CLASSIFICATIONS in COLUMBIA COUNTY
(Townships of Greenport, Claverack, Clermont, Germantown,
Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram,
Philmont and the City of Hudson)
HEAVY & HIGHWAY CLASSIFICATIONS
GROUP 1: Asbestos, toxic, bio-remediation,
phyto-remediation, lead or hazardous material abatement
when protective equipment and clothing are not required
GROUP 2: Asbestos, toxic, bio-remediation,
phyto-remediation, lead or hazardous material abatement
when protective clothing and equipment is required
For HEAVY & HIGHWAY CLASSIFICATIONS in GREENE COUNTY
(Township of Catskill)
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, President's Day, Memorial
Day, Independence Day, Lincoln's Birthday, Labor Day,
Election Day, Veterans Day, Thanksgiving Day, Christmas
Day, provided the employee is an employee of the company
prior to the scheduled holiday and reports to work the
first day following the holiday unless prevented from doing
so for legitimate reasons.
GROUP 1: Flagperson, gateperson
GROUP 2: General laborers, chuck tender, handling and
distributing drinking water, distributing all tools and
supplies of laborers, nipper, powder carrier, magazine
tender, warehouse laborers, concrete man, vibrator man,
mason tender, mortar man, spraying, brushing and covering
of concrete for curing and preservative purposes, traffic
striper, scaffold builder, concrete curb and sidewalk form
setter; permanent traffic striping and reflective devices,
placing and maintenance of all flares, cones, lights,
signs, barricades, traffic patterns, and all temporary
reflective type materials for traffic control, custodial
work, traffic directors, temporary heat or light tenders,
tool room, dewatering pump men, pitman, dumpmen, snow
removal and firewatch, asphalt man, joint setter, signal
person, pipelayer, pipe lining and relining, wellpoints,
conduit and duct layer, wire puller, rip rap and dry stone
layer, steel rod carrier, core drill, rock splitter, Hilti
gun air or electric, jackhammer, bush hammer, pavement
breaker, chipping hammer, wagon drill, air track, jib rig,
joy drill, gunite and sand blasting, coal passer and other
machine operators, power tool operator, sprayer and nozzle
man on mulching and seeding machine, all guard rail and
fence, all seeding and sod laying, all landscape work,
grade checker, all bridge work, walk behind self-propelled
power saw, grinder, groover or similar type machine, walk
behind tamper and roller of all types, salvage, stripping,
wrecking and dismantling laborer (including barman, cutting
torch and burner man), sheeting and shoring coming under
laborers jurisdiction, bit grinder, operator of form pin
puller and drivers, sandblasting, joint and jet sealer,
filling and wiring baskets for gabion walls, permanent sign
man, median barrier, sta-wall or similar type product,
chain saw operator, railroad track laborer, waterproofer,
pre-stressed and pre-cast concrete brick, block and stone
pavers, power tools used to perform work usually done by
laborers, power buggy and pumpcrete operator, fireproof,
plaster and caustic pump, asbestos, toxic, bio-remediation,
phyto-remediation, lead or hazardous materials abatement
when protective clothing and equipment is not required,
power brush cutter, retention liners, artificial turf,
retaining walls, walk behind surface planer, welding
related to laborers work, remote controlled equipment
normally operated by laborers, all technician work
including but not limited to stitching, seaming, heat
welding, fireproof sprayer, mortar mixer, concrete
finisher, form setter for concrete curbs and flatwork.
Gunite nozzle man, stone cutters, granite stone layer,
manhole, catch basin or inlet installing, laser men.
Ground man on milling machine
GROUP 3 Ingersoll Rand heavy duty crawler-master HCMZ, any
drill using a 4"" or larger bit, asbestos, toxic,
bio-remediation, phyto-remediation, lead or hazardous
material abatement when protective clothing and equipment
is required, all working foremen including grade, pipe
concrete, clearing, blacktop, drill, paving and blaster
etc., Hydraulic drill or similar, forklift for masonry
only, Blaster and asphalt screedman
GROUP 4: Asbestos, toxic, lead or hazardous material
abatement foreman
For TUNNEL, SHAFT & CAISSON WORK CLASSIFICATIONS
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, President's Day, Memorial
Day, Independence Day, Labor Day, Election Day, Veterans
Day, Thanksgiving Day, Christmas Day
GROUP 1: Laborer, Pit and Dumpman, Chuck Tender, Brakeman and
Powderman;
Miner and all machine men, Safety Miner, all shaft work,
caisson work, drilling, blow pipe, all air tools, tugger,
scaling, nipper gunniting from pot to nozzle, bit grinder,
signal man (top and bottom), shield driven tunnel, mixed
face and soft ground liner plate tunnel in free air
----------------------------------------------------------------
LABO0035-001 07/01/2017
FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD);
MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND
ST. JOHNSVILLE)
Rates Fringes
Laborers Building Construction
Asbestos Removal............$ 24.00 20.64+a
Blasters, Form Setters,
MotorBuggy Operator (Rider
Type)......................$ 23.00 20.64+a
Hazardous Waste Removal
Hazardous waste removal
includes wetting,
stripping, removal,
scrapping, vaccuuming,
bagging and disposing of
all insulation materials,
whether they contain
asbestos or not, from
mechanical systems.........$ 24.00 20.64+a
HEAVY & HIGHWAY:
GROUP 1:...................$ 28.05 23.74+a
GROUP 2:...................$ 28.25 23.74+a
GROUP 3:...................$ 28.45 23.74+a
GROUP 4:...................$ 28.65 23.74+a
Laborers....................$ 22.50 20.64+a
Pipelayers, Motor Mixers,
Motor Buggy Operator
(Walk Behind) Power Lift
(Walk Behind)...............$ 22.65 20.64+a
Wagon Drill Operator........$ 22.90 20.64+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day and Christmas Day.
GROUP 1: Common Laborers, Flagman, Outboard and Hand boats
GROUP 2: Bull Float, Chain Saw, Concrete aggregate bin,
Concrete Bootman, Gin Buggy, Hand or Machine Vibrator,
Jackhammer, Mason Tender, Mortar Mixer, Pavement Breaker,
Handlers of all steel mesh, Small generators for laborer's
tools, Installation of bridge drainage, Pipelayers,
Vibrator type rollers, Tamper, Drill doctor, Tail or Screw
Operator on asphalt paver, Water pump operator (1 1/2"" and
single diaphragm), Nozzle (asphalt, gunnite, seeding and
sand blasting), Laborers on chain link fence erection, Rock
splitter and power unit, Pusher type concrete saw and all
other gas, electric, oil, and air tool operators, Wrecking
laborers
GROUP 3: All rock or drilling machine operators (except
quarry master and similar type), Acetylene torch operators,
and Asphalt paver, Powderman
GROUP 4: Blasterers, Form setters, Stone or Granite Curb
setters
----------------------------------------------------------------
LABO0157-001 07/01/2023
FULTON (Twps. of Bleeker, Mayfield, Northhampton, Johnstown,
Broadalbin and Perth); MONTGOMERY (Twps. of Mohawk, Glen,
Charleston, Amsterdam, and Florida); SARATOGA (Twps. of Day,
Hadley, Edinburg, Corinth, Moreau, South Glens Falls,
Providence, Greenfield, Wilton, Northcumberland, Galway,
Milton, Saratoga Springs, Charlton, Ballston, Malta and Clifton
Park); SCHENECTADY and SCHOHARIE COUNTIES.
Rates Fringes
LABORER
BUILDING:
GROUP 1....................$ 28.74 20.14+a
GROUP 2....................$ 30.09 20.14+a
HEAVY & HIGHWAY:
GROUP 1:...................$ 39.19 26.75
GROUP 2:...................$ 39.39 26.75
GROUP 3:...................$ 39.59 26.75
GROUP 4:...................$ 39.79 26.75
GROUP 5:...................$ 41.69 26.75
LABORER CLASSIFICATIONS
Group 1: Common Laborers
Group 2: Asbestos and Toxic Materials
Commercial projects valued at $800,000 or less and/or
industrial projects valued at $100,000 or less, excluding
demolition work (the complete razing of structures) 75% of
the basic wage scale with full benefits will apply
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, and Christmas Day
LABORER CLASSIFICATIONS
GROUP 1: Common laborers, flagman, outboard & hand boats
GROUP 2: Bull float, chain saw, concrete aggregate bin,
concrete bootman, gin buggy, hand or machine vibrator,
jackhammer, mason tender, mortar mixer, pavement breaker,
handlers of all steel mesh, small generators for laborers'
tools, installation of bridge drainage, pipelayers,
vibrator type rollers, tamper, drill doctor, tail or screw
operator on asphalt paver, water pump operator (1 1/2"") and
single diaphragm), nozzle (asphalt, gunnite, seeding, and
sand blasting), laborers on chain fence erection, rock
splitter and power unit, pusher type concrete saw and all
other gas, electric, oil, and air tool operators, wrecking
laborers
GROUP 3: All rock drilling machine operators (except quarry
master and similar type), acetylene torch operator, and
asphalt paver, powderman
GROUP 4: Blasterers, form setters, stone or granite curb
setters
GROUP 5: Hazardous waste removal
----------------------------------------------------------------
LABO0190-001 07/01/2022
ALBANY; GREEN; RENSSELAER COUNTY, WASHINGTON COUNTY, SARATOGA
COUNTY (Townships of Stillwater, Halfmoon, Saratoga)
Rates Fringes
Laborers:
BUILDING:
GROUP 1....................$ 32.86 24.57
GROUP 2....................$ 34.21 24.57
LABORERS CLASSIFICATIONS
GROUP 1: Common Laborers
GROUP 2: Hazardous waste removal Commercial projects valued
at $800,000 or less and/or industrial projects valued at
$100,000 or less excluding demolition work, (complete
razing of structures) will receive 75% of basic wage scale
with full fringes will apply
----------------------------------------------------------------
LABO0190-002 07/01/2023
ALBANY; RENSSELAER; COLUMBIA (Twps. of Stuyvesant, Stockport,
Kinderhook, New Lebanon, Cannan, Ghent, Chatham, Austerlitz).
GREENE (except Catskill Township). WASHINGTON COUNTY. SARATAGO
COUNTY (Townships of Stillwater, Halfmoon Saratoga)
Rates Fringes
Laborers:
HEAVY & HIGHWAY:
GROUP 1:...................$ 39.19 26.70
GROUP 2:...................$ 39.39 26.70
GROUP 3:...................$ 39.59 26.70
GROUP 4:...................$ 39.79 26.70
GROUP 5:...................$ 41.69 26.70
FOOTNOTE:
PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day,
Labor Day, Thanksgiving Day and Christmas Day.
LABORERS CLASSIFICATIONS
GROUP 1: Common laborers, flagmen, outboard and hand boats
GROUP 2: Bull float, chain saw, concrete aggregated bin,
concrete bootman, gin buggy, hand or machine vibrator,
jackhammer, mason tender, mortar mixer, pavement breaker,
handlers of all steel mesh, small generators for laborers'
tools, installation of bridge drainage, pipelayers,
vibrator type rollers, tampers, drill doctor, Tail or screw
operator on asphalt paver, Water pump operator (1 1/2"" and
single diaphragm), Nozzle (asphalt, gunnite, seeding, and
sand blasting) Laborers on chain link fence erection, rock
splitter and power unit, pusher type concrete saw and all
other gas, electric, oil, air tool operators, and wrecking
laborers
GROUP 3: All rock air drilling machine operators (except
quarry master and similar type), acetylene torch operators,
and asphalt paver, powderman
GROUP 4: Blasterers, form setters, stone or granite curb
setters
GROUP 5: Hazardous waste removal
----------------------------------------------------------------
LABO0235-006 05/01/2023
COLUMBIA (Twps. of Greenport, Claverack, Hillsdale, Livingston,
Germantown, Taghkanic, Copake, Clermont, Gallatin, Ancram):
Rates Fringes
Laborers:
HEAVY & HIGHWAY
GROUP 1....................$ 36.45 27.80+a
GROUP 2....................$ 42.80 27.80+a
GROUP 3....................$ 43.90 27.80+a
LABORERS CLASSIFICATIONS (HEAVY & HIGHWAY)
GROUP 1: Flagperson; Placing and maintenance of all flares,
cones, lights, signs, barricades; traffic control custodial
work; traffic directors; temporary heat or light tenders;
tool rooms
GROUP 2: General Laborers, Dumpman, Pitman, Concrete man;
Signal man; Pipelayers; Rip rap; Dry stone layer; Jack
hammer; Powderman; Highscalers power buggy operator; Steel
rod carrier; Vibratory operator; other machine operator;
wrecking; Vibrator operator-compactor; Gunite and
sandblasting; Water pump 2"" or under; Nipper; Chucker;
Asphalt Workers
GROUP 3: Asphalt raker; Asphalt Screedman; Drillers (all);
Laser Beam Operator; Form Setter/Aligners; Blasters
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, Presidents Day, Good Friday,
Memorial Day, Independence Day, Labor Day, Columbus Day,
Veterans Day, November Election Day, Thanksgiving Day, and
Christmas Day
----------------------------------------------------------------
PAIN0009-013 07/01/2022
Rates Fringes
GLAZIER..........................$ 34.01 26.91
----------------------------------------------------------------
PAIN0155-002 05/01/2021
COLUMBIA AND GREENE COUNTIES
Rates Fringes
Painters:
Drywall Finisher............$ 35.94 24.66
Lead Abatement Work.........$ 35.94 24.66
Painter/Paperhanger.........$ 35.94 24.66
Spray Rate..................$ 36.94 24.66
----------------------------------------------------------------
PAIN0201-001 05/01/2023
Rates Fringes
Painters:
Lead Abatement Workers,
Structural Steel
Zone 1.....................$ 32.19 20.50
Zone 2.....................$ 32.19 20.50
Painters, Drywall
Finishers, Spray
Zone 1.....................$ 31.19 20.50
Zone 2.....................$ 31.19 20.50
Zone #1 Entire counties of ALBANY, FULTON, MONTGOMERY,
RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA
ZONE #2 All of WASHINGTON County
----------------------------------------------------------------
PAIN0806-002 10/01/2023
ALBANY, COLUMBIA, FULTON, GREENE, MONTGOMERY, RENNSELAER,
SCHOHARIE, SCHENECTADY, SARATOGA AND WASHINGTON
Rates Fringes
Painters:
Structural Steel and Bridge.$ 56.00 54.33
----------------------------------------------------------------
PLUM0007-001 05/01/2024
ALBANY; COLUMBIA; FULTON; GREENE; MONTGOMERY; RENSSELAER;
SCHENECTADY; SARATOGA (Towns of Charlton, Clifton Park, Galway,
Halfmoon, Milton, Stillwater and Waterford)
Rates Fringes
PLUMBER/PIPEFITTER...............$ 53.06 28.47
----------------------------------------------------------------
PLUM0112-019 05/01/2023
Townships of Canajoharie and Minden
Rates Fringes
PLUMBER (Including
Steamfitting)
Northern Zone...............$ 31.40 31.70
----------------------------------------------------------------
PLUM0773-002 05/01/2024
SARATOGA (Remainder of County); WASHINGTON COUNTY:
Rates Fringes
PLUMBER/PIPEFITTER...............$ 43.28 34.75
----------------------------------------------------------------
ROOF0203-003 06/01/2023
SCHOHARIE COUNTY:
Rates Fringes
ROOFER...........................$ 30.50 19.84
----------------------------------------------------------------
* ROOF0241-001 06/01/2024
Rates Fringes
ROOFER...........................$ 37.05 23.52
----------------------------------------------------------------
SFNY0669-001 01/01/2024
Rates Fringes
SPRINKLER FITTER.................$ 42.73 27.05
----------------------------------------------------------------
SHEE0083-001 06/01/2019
Rates Fringes
Sheet metal worker...............$ 33.73 33.04+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, Christmas Day. If any of
these holidays fall on a Saturday or Sunday, either the
preceding Friday or following Monday will be observed as
the holiday.
----------------------------------------------------------------
TEAM0294-003 07/01/2023
Rates Fringes
Truck drivers:
HEAVY & HIGHWAY
GROUP 1....................$ 37.04 29.68+a
GROUP 2....................$ 37.10 29.68+a
GROUP 3....................$ 37.19 29.68+a
GROUP 4....................$ 37.32 29.68+a
GROUP 5....................$ 37.48 29.68+a
TRUCK DRIVERS CLASSIFICATIONS (HEAVY & HIGHWAY)
GROUP 1: Pick-ups, panel trucks, flatboy material trucks
(straight jobs), single axle dump trucks, dumpsters,
receivers, greasers, truck tireman
GROUP 2: Tandems, batch trucks, mechanics
GROUP 3: Semi-trailers, low-boy trucks, asphalt distributor
trucks, agitator, mixer trucks and dumpcrete type vehicles,
truck mechanic, fuel truck
GROUP 4: Specialized earth moving equipment - euclid type or
similar off-highway equipment, where not self-loaded,
straddle (ross) carrier, self-contained concrete unit
GROUP 5: Off-highway tandem back dump, twin engine equipment
and double hitched equipment where not self-loaded
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, Christmas Day, provided
the employee works the day before and the day after the
holiday.
----------------------------------------------------------------
TEAM0294-004 07/01/2023
BUILDING CONSTRUCTION
EXCLUDING MONTGOMERY COUNTY
Rates Fringes
Truck drivers:
GROUP 1.....................$ 30.62 28.94+a
GROUP 2.....................$ 30.92 28.94+a
FOOTNOTES:
a. One week vacation after 1 year; 2 weeks vacation after 5
years.
TRUCK DRIVERS BUILDING CLASSIFICATIONS
GROUP 1: Straight, winch, transit mix on job site, road
oilers, dump, panel, pick-up, water and fuel trucks on site
(including nozzle)
GROUP 2: Euclid or similar equipment, lowboy or lowboy
trailers
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
----------------------------------------------------------------
The body of each wage determination lists the classification
and wage rates that have been found to be prevailing for the
cited type(s) of construction in the area covered by the wage
determination. The classifications are listed in alphabetical
order of ""identifiers"" that indicate whether the particular
rate is a union rate (current union negotiated rate for local),
a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed
in dotted lines beginning with characters other than ""SU"" or
""UAVG"" denotes that the union classification and rate were
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of
the union which prevailed in the survey for this
classification, which in this example would be Plumbers. 0198
indicates the local union number or district council number
where applicable, i.e., Plumbers Local 0198. The next number,
005 in the example, is an internal number used in processing
the wage determination. 07/01/2014 is the effective date of the
most current negotiated rate, which in this example is July 1,
2014.
Union prevailing wage rates are updated to reflect all rate
changes in the collective bargaining agreement (CBA) governing
this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that
no one rate prevailed for this classification in the survey and
the published rate is derived by computing a weighted average
rate based on all the rates reported in the survey for that
classification. As this weighted average rate includes all
rates reported in the survey, it may include both union and
non-union rates. Example: SULA2012-007 5/13/2014. SU indicates
the rates are survey rates based on a weighted average
calculation of rates and are not majority rates. LA indicates
the State of Louisiana. 2012 is the year of survey on which
these classifications and rates are based. The next number, 007
in the example, is an internal number used in producing the
wage determination. 5/13/2014 indicates the survey completion
date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a
new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate
that no single majority rate prevailed for those
classifications; however, 100% of the data reported for the
classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union
average rate. OH indicates the state. The next number, 0010 in
the example, is an internal number used in producing the wage
determination. 08/29/2014 indicates the survey completion date
for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of
each year, to reflect a weighted average of the current
negotiated/CBA rate of the union locals from which the rate is
based.
State Adopted Rate Identifiers
Classifications listed under the ""SA"" identifier indicate that
the prevailing wage rate set by a state (or local) government
was adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
01/03/2024 reflects the date on which the classifications and
rates under the ?SA? identifier took effect under state law in
the state from which the rates were adopted.
----------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can
be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on
a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and Hour
National Office because National Office has responsibility for
the Davis-Bacon survey program. If the response from this
initial contact is not satisfactory, then the process described
in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and by any information (wage
payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
================================================================
END OF GENERAL DECISION"
Update #1 ·
Samuel S. Stratton VA Medical Center January 9, 2024
113 Holland Avenue
Albany, New York 12208
Construction Statement of Work (SOW)
528A8-22-816 Consolidate Primary Care on 1st Floor Phase 1A Bathrooms
General Statement of Work:
Existing office C101 and C102 on the first floor of Building 1 at the Albany New York VAMC shall be renovated and reconfigured by the contractor to serve as public restrooms. The approximately 500 square feet of space shall be modified by the contractor for a Men s Restroom and a Women s Restroom each. Office C102-A will be slightly reduced in width to accommodate the new restroom layout.
The layouts shall meet both the ADA Standards for Accessible Design and the VA Barrier Free Design Standards.
The existing office spaces shall be fully demolished by the contractor and the reconfigured spaces shall receive new finishes appropriate for public restrooms on the floors, walls, and ceilings.
The project shall include new restroom wall, floor and ceiling finishes, light fixtures, HVAC connections, new plumbing fixtures, electrical work and fire protection modifications.
Plumbing demolition and removals shall be required in the space below the site to support new connections for domestic cold water, domestic hot water, sanitary piping, and vent piping.
Ceilings in the basement bathrooms directly below the new renovation area shall be accessed and renovated for plumbing connections to be made. Work shall be phased so that one basement level restroom remains in service at all times during construction.
There are no structural modifications required beyond connection to the existing structural systems for hangers and bracing for MEP systems.
The contractor shall perform all related demolition, architectural renovations, MEP renovations as listed in the plans and specifications of the bid documents for Project 528A8-22-816. All work shall be completed within 180 days of receipt of the Notice to Proceed.
Autodesk build construction management platform:
The Contractor shall utilize VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC).
Access to the platform and training portal will be provided by VISN 2 through project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning and Retro-Commissioning contracts. There is no user, license, or subscription fee to the contractor for using this cloud-based platform.
The Contractor shall accomplish and complete the following tasks upon award of contract:
Request access to ACC platform and ProductivityNOW eLearning Site to project VA COR within 14 days of contract award. Only staff that shall utilize the platform to be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc.
The access request shall be in writing and include a list of staff. The list shall include the following information:
Full Name
Company Name
Email Address
Role/Position on the project (i.e., Project manager, site super)
Contractor staff granted access to the ACC platform shall complete ACC training through ProductivityNOW eLearning platform and provide certificates of completion to COR within 12 Calendar days of access being granted. Initial access to ProductivityNOW eLearning platform shall expire after 12 Calendar days after online access is granted.
D) Additional Staff and Subcontractors can be added at any time with a request submission to the project COR.
The contractor shall only use the ACC platform for contract required submissions, official project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor an increase in contract amount be provided for the contractor s failure to utilize the ACC platform as the project s official communication and collaboration system. Any correspondence out of platform shall not be the governing authority contradicting direction and will be at the contractor s expense. Official project correspondence and collaboration includes but not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys.
Contractor shall inform the COR of any staff changes within 2 business days from the change. Staff changes pertains to staff granted access to the ACC platform. Contractor shall request termination of access, replacement of personnel and/or any other action that might impact the contractor ability to maintain required utilization of the platform.
Contractor submission requirements cannot be accepted for work to begin without meeting all ACC Platform requirements outlined herein, including completing required ACC platform training.
Files
| File | Type | Posted |
|---|---|---|
| 36C24224B0037 0007.docx | DOCX document | |
| 36C24224B0037 0006.docx | DOCX document | |
| 36C24224B0037 0005.docx | DOCX document | |
| Walkthrough sign in sheet.pdf | ||
| 36C24224B0037 0004.docx | DOCX document | |
| BMS placement.pdf | ||
| 36C24224B0037 0003.docx | DOCX document | |
| 36C24224B0037 0002.docx | DOCX document | |
| 36C24224B0037 0001.docx | DOCX document | |
| WD Albany NY20240002 04-05-2024.docx | DOCX document | |
| 36C24224B0037_1.docx | DOCX document | |
| 528A8-22-814 Bid Set - Drawing Set 17 Jan 2024.pdf | ||
| 528A8-22-816 Bid Set - Specs Full Set.pdf |
Show all 13
Notice history
| Notice | Type | Posted |
|---|---|---|
| Z1DA--528A8-22-816 consolidate primary care phase 1A bathrooms | Award Notice | |
| This notice | Solicitation | |
| Z1DA--project 528A8-22-816 - consolidate primary care phase 1A bathrooms | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Z1DA--528A8-22-814 Consolidate Primary Care Reception | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business | |
| Z1DA--Project # 528A6-26-607 Replace Flooring for Rm. 140 B76 | Bath VAMC | Veterans Integrated Service Network 2 | No set-aside | |
| Z2DA--561-26-104 Repair Operating Room (OR) & Bathroom Leaks | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business | |
| Y1DA--NRM-CONST 528-CSI-102 Urology Equipment Site Prep | FY27 NRM | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business | |
| Y1DA--561-26-103 Upgrade Electrical and Plumbing in Building 18B | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity