Z1DA--556-24-113 Oil Transformer and Switch Enclosure Upgrades
Closed Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- 36C25226B0029_1
- Agency
-
Veterans Integrated Service Network 12
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- Place of performance
- Illinois 60064, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 seeks a general contractor for oil transformer and switch enclosure upgrades at Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois, with sealed bids due September 9, 2026 at 10:00 AM Central Time. This is a 100 percent set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) firms certified under 38 U.S.C. 8127 and listed in the SBA certification database.
Place of performance is North Chicago, Illinois. The scope includes replacement of seven medium voltage oil-filled transformers (4160 volt primary, 208/120 volt secondary) serving buildings 1, 3, 9, 11, 66, 137, and 187—specifically four 150 KVA units, two 300 KVA units, and one 750 KVA unit. Work also encompasses replacement of electrical distribution switchboards at buildings 137 and 3, replacement of concrete pads at buildings 9, 66, 187, and a new concrete pad for the relocated 150 KVA transformer at building 3, and installation of anti-ram rated bollards at all transformers. Period of performance is 357 calendar days from notice to proceed, with Division 01 submittals due by day 14, Division 02+ submittals by day 50, mobilization and demolition by day 94, and project completion by day 356.
The estimated project magnitude is between $2,000,000 and $5,000,000 under NAICS 238210 (Electrical Contractors and Other Wiring Installation Contractors). The contract is firm-fixed-price with a lump sum base bid. A bid guarantee of 20 percent of bid price (not to exceed $2,000,000) and performance and payment bonds on SF25 and SF25A forms within 10 days of award are required. Subcontracting limitations allow a maximum 75 percent of contract payments to non-SDVOSB/VOSB firms. Illinois prevailing wage rates apply per General Decision IL20260008 (effective May 18, 2026). Virtual public bid opening occurs at 11:00 AM the same day via Microsoft Teams. Written inquiries are due by 11:00 AM Central Time on August 7, 2026, directed to Lynn VanderVelde (lynn.vandervelde@va.gov) or Demetrice Parker (demetrice.parker@va.gov). A mandatory pre-bid site visit was held July 28, 2026.
Notice text
2 versions
Update #2 · Latest ·
CONSTRUCTION STATEMENT OF WORK Date: September 13, 2025 Project Number: 556-24-113 Project Name: Oil Transformer and Switch Enclosure Upgrade (GC) Location: Captain James A. Lovell FHCC 3001 Green Bay Rd, North Chicago, IL 60064 Part 1: Project Scope of Work Overview: Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project. Replace medium voltage oil-filled transformers that serve the following buildings on the James A. Lovell FHCC campus: 1, 3, 9, 11, 66, 137 and 187. Transformers have 4160 volt primary and 208/120 volt secondary. There are (4) transformers rated for 150 KVA, (2) transformers rated for 300 KVA and (1) transformer rated for 750 KVA. The 150 KVA transformer at building 3 will need to be relocated as well. Replace the electrical distribution switchboard at building 137. Replace the electrical distribution switchboard at building 3. Replace concrete pads for medium voltage oil filled transformers at buildings 9, 66, and 187. New transformer location at building 3 requires a new concrete pad as well. Install anti-ram rated bollards at all transformers. Part 2: Period of Performance: The following model presents the summary logic of the milestone sequence working backward from the delivery date of the longest lead time in the critical path to determine a mobilization date, and then forward from the delivery date of the longest lead time to completion of all work. Listed milestones and phases (calendar days): Notice To Proceed Day 0 Division 01 Submissions Completed Day 14 Division 01 VA Reviews Day 35 Division 02+ Submissions Day 50 Division 02+ VA Reviews Day 71 Longest Lead Item Procurement Day 72 (GC to determine and submit) VA review and GC revise schedule Day 93 Mobilize and Demo Day 94 (If all pre-construction submittals were approved) Pre-Longest Lead Item Construction Day 214 (GC to determine) Longest Lead Item Delivery Date Day 215 (GC to determine) Post Long-Lead Item Construction Day 335 (GC to determine) Construction Complete and Closeouts approved Day 356 Closeout (Contract end date) Day 357 Total: 357 days reflects an example workup of the plan. GC must submit the factory ship date commitment to VA and revise the Baseline Schedule to work forward and backward from that date to optimize the time in field (disruption of customer and reduction of GC costs). Part 3: Detailed Project Requirements: Project Objectives: Contractor is required to expedite planning and execution of this work, enabling the work to start and continue without interruptions caused by failure to procure long lead equipment and plan around the delivery dates This project is required to enable compliant and safe conditions for maintenance of electrical systems. GC and their consulting engineer to plan and execute a robust quality assurance plan and safety plan to prevent time and rework losses. List of AE Documents to be included in this Contract: See: 00 01 10 Table of Contents and the entire Project Manual See: 00 01 15 List of Drawing Sheets and the entire volume of drawings Pre-Bid Conference: VA shall schedule one pre-bid conference to be attended by prospective bidders to observe current conditions within the work area(s). Do not expect additional events to occur. The AE shall not attend the pre-bid event. No questions will be allowed during the event. All questions by all prospective contractors shall follow the RFI process described in the Solicitation. Prospective bidders shall not attempt to contact the AE or VA facilities engineering staff during the solicitation and bidding period. The AE and VA facilities engineering staff are instructed to ignore all such inquiries and report them to the VA Contracting Officer. All inquiries regarding this project shall be presented as complete and coherent Requests for Information (RFI) specifically citing design or specification sections, pages, paragraphs, notes, details, etc. to enable responses to RFI s. Follow the instructions provided by the Contracting Officer within the Solicitation regarding submission of RFI s. VA will post responses developed to enable all prospective bidders to receive the same information at the same time.
Update #1 ·
CONSTRUCTION STATEMENT OF WORK
Date: September 13, 2025
Project Number: 556-24-113
Project Name: Oil Transformer and Switch Enclosure Upgrade (GC)
Location: Captain James A. Lovell FHCC
3001 Green Bay Rd,
North Chicago, IL 60064
Part 1: Project Scope of Work Overview:
Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project.
Replace medium voltage oil-filled transformers that serve the following buildings on the James A. Lovell FHCC campus: 1, 3, 9, 11, 66, 137 and 187. Transformers have 4160 volt primary and 208/120 volt secondary. There are (4) transformers rated for 150 KVA, (2) transformers rated for 300 KVA and (1) transformer rated for 750 KVA. The 150 KVA transformer at building 3 will need to be relocated as well.
Replace the electrical distribution switchboard at building 137.
Replace the electrical distribution switchboard at building 3.
Replace concrete pads for medium voltage oil filled transformers at buildings 9, 66, and 187. New transformer location at building 3 requires a new concrete pad as well.
Install anti-ram rated bollards at all transformers.
Part 2: Period of Performance:
The following model presents the summary logic of the milestone sequence working backward from the delivery date of the longest lead time in the critical path to determine a mobilization date, and then forward from the delivery date of the longest lead time to completion of all work.
Listed milestones and phases (calendar days):
Notice To Proceed Day 0
Division 01 Submissions Completed Day 14
Division 01 VA Reviews Day 35
Division 02+ Submissions Day 50
Division 02+ VA Reviews Day 71
Longest Lead Item Procurement Day 72 (GC to determine and
submit)
VA review and GC revise schedule Day 93
Mobilize and Demo Day 94 (If all pre-construction
submittals were approved)
Pre-Longest Lead Item Construction Day 214 (GC to determine)
Longest Lead Item Delivery Date Day 215 (GC to determine)
Post Long-Lead Item Construction Day 335 (GC to determine)
Construction Complete and Closeouts approved Day 356
Closeout (Contract end date) Day 357
Total: 357 days reflects an example workup of the plan. GC must submit the factory ship date commitment to VA and revise the Baseline Schedule to work forward and backward from that date to optimize the time in field (disruption of customer and reduction of GC costs).
Part 3: Detailed Project Requirements:
Project Objectives:
Contractor is required to expedite planning and execution of this work, enabling the work to start and continue without interruptions caused by failure to procure long lead equipment and plan around the delivery dates
This project is required to enable compliant and safe conditions for maintenance of electrical systems.
GC and their consulting engineer to plan and execute a robust quality assurance plan and safety plan to prevent time and rework losses.
List of AE Documents to be included in this Contract:
See: 00 01 10 Table of Contents and the entire Project Manual
See: 00 01 15 List of Drawing Sheets and the entire volume of drawings
Pre-Bid Conference:
VA shall schedule one pre-bid conference to be attended by prospective bidders to observe current conditions within the work area(s). Do not expect additional events to occur.
The AE shall not attend the pre-bid event. No questions will be allowed during the event. All questions by all prospective contractors shall follow the RFI process described in the Solicitation.
Prospective bidders shall not attempt to contact the AE or VA facilities engineering staff during the solicitation and bidding period. The AE and VA facilities engineering staff are instructed to ignore all such inquiries and report them to the VA Contracting Officer. All inquiries regarding this project shall be presented as complete and coherent Requests for Information (RFI) specifically citing design or specification sections, pages, paragraphs, notes, details, etc. to enable responses to RFI s. Follow the instructions provided by the Contracting Officer within the Solicitation regarding submission of RFI s. VA will post responses developed to enable all prospective bidders to receive the same information at the same time.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Z1DA--556-24-113 Oil Transformer and Switch Enclosure Upgrades | Solicitation | |
| This notice | Solicitation | |
| Z1DA--556-24-113 Oil Transformer and Switch Enclosure Upgrades | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Z1DA--Modernize Damen (Bldg. 1) Elevators Construction 537-24-101 | Veterans Integrated Service Network 12 | Service-Disabled Veteran-Owned Small Business | |
| Z1DA--550-20-121 Demo Old Boiler Plant B100 (CON) | Veterans Integrated Service Network 12 | No set-aside | |
| Update and Replace Remaining ATS's | Veterans Integrated Service Network 12 | Service-Disabled Veteran-Owned Small Business | |
| Z1DA--Project 695-24-107 Replace Boilers 4 and 5 Clement J. Zablocki, VA Medical Center 5000 West National Avenue Milwaukee, WI 53295 | Veterans Integrated Service Network 12 | Service-Disabled Veteran-Owned Small Business | |
| Z2DA--537-24-106 Create Contractor Lie-Down Zone | Veterans Integrated Service Network 12 | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity