Y1DA--598-22-4-8317-0086 generator fuel tank

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C25622R0117
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

Vendor requested extension.

Update #3 ·

The purpose of this amendment is to answer the following questions posted about 36C25622R0117.

1. Can you provide a link to Joint Commissioning requirements?

https://www.jointcommission.org/

2. Would the VA consider a larger capacity tank because of current supply issues? i.e. 4000 Gallon option.

Yes, the VA would consider a higher capacity option due to the current supply chain issues. Please also provide the 3000-gallon tank cost with your RFP for evaluation purposes.

3. Please verify there are no utilities under the proposed tank site.

No utilities exist in the proposed tank site however utilizes are in the surrounding areas. Contractor will be responsible for avoiding impact to existing utilities. Awarded contractor will receive CAD files of Utilities and pipe diagrams for chiller plant.

4. Per the statement of work there will be a requirement for soil remediation for this solicitation but we are unable to quantify the amount of the removal and replacement without unearthing the existing tank. Therefore, the contractors will not be able property estimate this requirement of the statement of work. Can the Gov. provide an allowance for possible soil remediation in lieu of the contracts excluding this section of work?

Estimate in proposal 10 ft below tank for soil remediation. Soil removed can be dumped locally on VA property, location will be confirmed with awarded contractor. If additional soils need to be remediated discussions will be made at that time with the awarded contractor.

5. Additional information is needed for the remote standpipe and location of standpipe for fueling and re-fueling of the new 3000-gallon tank. There is a significant elevation drop from the proposed tank and existing elevation of the truck court area which creates possible challenge when re-fuel tanks from a gravity fed truck.

If the contractor feels like a pump is required, please include in pricing for standpipe.

6. Does the Gov. intend to issue additional drawings and specifications other than what is provided in the Statement of Work indicating work limits, remote fill line, etc.

Yes, awarded contractor will receive cad files of existing utilities and chiller plant piping. Contractor will request a proposed work area once awarded for VA review.

Update #2 ·

Clarify site visit is at Building 170 at the oxygen tanks in front of the building on 6/27/22 at 0800 AM.

Update #1 ·

Project

Files

File Type Posted
36C25622R0117 0003.docx DOCX document
36C25622R0117 0002.docx DOCX document
36C25622R0117 0001.docx DOCX document
SOW 598 22 160Emergency Generator Fuel Tank B170 Pod 2.docx DOCX document
36C25622R0117 Gen Fuel Tanks 02.docx DOCX document
36C25622R0117 Gen Fuel Tanks.docx DOCX document
ar125.txt TXT text file

Notice history

Notice Type Posted
Y1DA--CON | emergency generator fuel tank | PR 598-22-4-8317-0086 Award Award Notice
This notice Latest solicitation Solicitation
Y1DA--598-22-4-8317-0086 generator fuel tank Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors