36C25622R0117 0002.docx
DOCX document 18 KB Posted
- Attached to
- Y1DA--598-22-4-8317-0086 GENERATOR FUEL TANK
- Solicitation number
- 36C25622R0117
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25622R0117 0003.docx | DOCX document | |
| 36C25622R0117 0001.docx | DOCX document | |
| 36C25622R0117 Gen Fuel Tanks 02.docx | DOCX document | |
| SOW 598 22 160Emergency Generator Fuel Tank B170 Pod 2.docx | DOCX document | |
| ar125.txt | TXT text file | |
| 36C25622R0117 Gen Fuel Tanks.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 598-22-160 Department of Veterans Affairs Veterans Health Administration Network Contracting Office 16 2575 Keystone Crossing Fayetteville
AR
72703 Department of Veterans Affairs Veterans Healthcare System of the Ozarks Network Contracting Office 16 2575 Keystone Crossing Fayetteville
AR
72703 To all Offerors/Bidders
36C25622R0117
X X X
X The purpose of this amendment is to answer questions posted by Vendors. See attached questions and answers.
The purpose of this amendment is to answer the following questions posted about 36C25622R0117.
1. Can you provide a link to Joint Commissioning requirements?
https://www.jointcommission.org/
2. Would the VA consider a larger capacity tank because of current supply issues? i.e. 4000 Gallon option.
Yes, the VA would consider a higher capacity option due to the current supply chain issues. Please also provide the 3000-gallon tank cost with your RFP for evaluation purposes.
3. Please verify there are no utilities under the proposed tank site.
No utilities exist in the proposed tank site however utilizes are in the surrounding areas. Contractor will be responsible for avoiding impact to existing utilities. Awarded contractor will receive CAD files of Utilities and pipe diagrams for chiller plant.
4. Per the statement of work there will be a requirement for soil remediation for this solicitation but we are unable to quantify the amount of the removal and replacement without unearthing the existing tank. Therefore, the contractors will not be able property estimate this requirement of the statement of work. Can the Gov. provide an allowance for possible soil remediation in lieu of the contracts excluding this section of work?
Estimate in proposal 10 ft below tank for soil remediation. Soil removed can be dumped locally on VA property, location will be confirmed with awarded contractor. If additional soils need to be remediated discussions will be made at that time with the awarded contractor.
5. Additional information is needed for the remote standpipe and location of standpipe for fueling and re-fueling of the new 3000-gallon tank. There is a significant elevation drop from the proposed tank and existing elevation of the truck court area which creates possible challenge when re-fuel tanks from a gravity fed truck.
If the contractor feels like a pump is required, please include in pricing for standpipe.
6. Does the Gov. intend to issue additional drawings and specifications other than what is provided in the Statement of Work indicating work limits, remote fill line, etc.
Yes, awarded contractor will receive cad files of existing utilities and chiller plant piping. Contractor will request a proposed work area once awarded for VA review.
File details come from the government source that posted it. Updated .