WY FLAP CR CN10-277(1) Wiggins Creek Bridge
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 6982AF23B000018
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Not on record
- Set-aside
- HUBZone
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Dubois, Wyoming, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for bridge replacement services along the East Fork Road in Fremont County, Wyoming. The Department of Transportation Federal Highway Administration seeks to remove an existing one-lane bridge and construct a new one-lane modular steel vehicular bridge approximately 100 feet long by 29 feet wide. Key requirements include removal of the existing bridge while maintaining road access, installation of cofferdams and diversion during construction, and avoidance of in-water work during fish spawning seasons from May 15th to July 31st and September 15th to November 30th. The anticipated schedule is to advertise in April 2023, with a notice to proceed in late June and construction from July 2023 through October 2024.
The opportunity is set aside for HUBZone small businesses. The project is estimated to cost between $2-5 million and will be funded in part through the FLAP program with matching funds from Fremont County. Major work items include removal of the existing bridge, over 150 cubic yards of structural concrete, over 21,000 pounds of reinforcing steel, and over 250 linear feet of 30-inch diameter drilled shafts.
Notice text
THIS IS NOT AN INVITATION FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE
PROJECT NUMBER: WY FLAP CR CN10-277(1)
PROJECT NAME: WIGGINS CREEK BRIDGE
PROJECT DESCRIPTION: The project is in Fremont County, Wyoming along the East Fork Road, approximately 6 miles north of the intersection with U.S Highway 26. The nearest town is Dubois Wyoming located approximately 15 miles west of the project location. The terrain is mountainous with an elevation of approximately 6700 feet. This project is for bridge replacement.
SCOPE OF THE WORK: The project includes removal of a one-lane bridge. A one lane diversion will be required before the removal of the existing bridge can begin as the roadway must remain open throughout the project. The creek is a sensitive resource area for the Yellowstone cutthroat trout and Brown trout. The construction season that is currently anticipated is that most work will be performed in late summer and through the winter to minimize the impact to the fisheries. There will be some level of public scrutiny as there are three private properties that are adjacent to the bridge.
PRINCIPAL WORK ITEMS: The major items of work include the following:
- Removal of bridge (LPSM)
- Cofferdams (LPSM)
- Structural Concrete, Class A (AE) – 150 (CUYD)
- Reinforcing Steel – 21,700 (LB)
- Reinforcing Steel, Epoxy Coated – 13,000 (LB)
- Prefabricated steel bridge (100’x 29’ Modular Steel Vehicular Bridge) (LPSM)
- Bridge Railing, Steel (WYDOT TL-3) – 290 (LNFT)
- Drilled Shaft, 30-inch diameter – 250 (LNFT)
- Construction and maintenance of diversion (LPSM)
ANTICIPATED SCHEDULE: It is anticipated this project will be advertised in April 2023, with NTP in late June 2023. Construction is anticipated from July 2023 thru October 2024.
No in-water work can occur between May 15th and July 31st to avoid the Yellowstone cutthroat trout spawning and no in-water work between September 15th through November 30th to avoid brown trout spawning.
ESTIMATED COST RANGE: The estimated price range of the project work is between: $2,000,000 and $5,000,000
FUNDING SOURCE: The project is funded through the FLAP program which includes a portion of the project being funded through match from Fremont County.
Notice history
| Notice | Type | Posted |
|---|---|---|
| WY FLAP CR CN10-277(1) Wiggins Creek Bridge | Award Notice | |
| WY FLAP CR CN10-277(1) Wiggins Creek Bridge | Solicitation | |
| This notice | Pre-Solicitation | |
| WY FLAP CR CN10-277(1) Wiggins Creek Bridge | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs | Federal Highway Administration | No set-aside | |
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside | |
| ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 | Federal Highway Administration | No set-aside | |
| Access Road Repair National Elk Refuge | — | Total Small Business | |
| CO OMAD 300(71) Minuteman Missile Access | Federal Highway Administration | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity