WY FLAP 408(1), Fremont Canyon Road

Award Notice Posted

Solicitation number
DTFH6815B00032
Agency
Awarded
to 71 Construction
Set-aside
Total Small Business

Opportunity facts

Contract number
DTFH6816C00022 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Natrona County, Wyoming 82620, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

THIS PROJECT HAS BEEN SET-ASIDE FOR SMALL BUSINESSES.

Project Location

This project begins at the intersection of Pathfinder Road (CR409) and CR 408. The project is near Pathfinder Reservoir approximately 44 miles southwest of Casper, WY. The project is 3.84 miles in length.

Scope of the Work


The project consists of pulverizing and repaving 3.84 miles of 22 foot existing asphalt surface. The new asphalt surface will be 3.5 inches in depth.


Principal work items include:


Removal of 1700 LF of guardrail


Installation of 1675 LF of new guardrail


Pulverizing (6 inch depth) 203 STA


Aggregate Base 300 tons


3.5 inch asphalt paving 10,000 tons


Installation of 2 cattle guards


Installation of 49 signs and 90 delineators


Pavement markings 81,230 LF


Traffic control



The contracting range for this project is between $2 million to $4 million.

Update #1 ·

THIS IS NOT AN INVITATION FOR BID - PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE.  THE TENATIVE ADVERTISEMENT DATE IS FEBRUARY 16, 2016.  THIS PROJECT HAS BEEN SET-ASIDE FOR SMALL BUSINESSES.

Project Location

This project begins at the intersection of Pathfinder Road (CR409) and CR 408. The project is near Pathfinder Reservoir approximately 44 miles southwest of Casper, WY. The project is 3.84 miles in length.

Scope of the Work


The project consists of pulverizing and repaving 3.84 miles of 22 foot existing asphalt surface. The new asphalt surface will be 3.5 inches in depth.


Principal work items include:


Removal of 1700 LF of guardrail


Installation of 1675 LF of new guardrail


Pulverizing (6 inch depth) 203 STA


Aggregate Base 300 tons


3.5 inch asphalt paving 10,000 tons


Installation of 2 cattle guards


Installation of 49 signs and 90 delineators


Pavement markings 81,230 LF


Traffic control



The contracting range for this project is between $2 million to $4 million.

Files

File Type Posted
Bid_Tabs.pdf PDF
Bid_Opening_Summary.pdf PDF
Q-A _3-21.pdf PDF
Final_Tech_Memo_Fremont_Canyon_Road_4-22-14_.pdf PDF
Final_Hydraulic_Recommendation_Report.pdf PDF
WYFLAP_408(1)_100__Signed_Plan_Set_2_11_16.pdf PDF
DTFH6815B00032.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors