WY FLAP 408(1), Fremont Canyon Road
Award Notice Posted
- Solicitation number
- DTFH6815B00032
- Agency
-
Federal Highway Administration
Department of Transportation
- Awarded
- to 71 Construction
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- DTFH6816C00022 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Natrona County, Wyoming 82620, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
THIS PROJECT HAS BEEN SET-ASIDE FOR SMALL BUSINESSES.
Project Location
This project begins at the intersection of Pathfinder Road (CR409) and CR 408. The project is near Pathfinder Reservoir approximately 44 miles southwest of Casper, WY. The project is 3.84 miles in length.
Scope of the Work
The project consists of pulverizing and repaving 3.84 miles of 22 foot existing asphalt surface. The new asphalt surface will be 3.5 inches in depth.
Principal work items include:
Removal of 1700 LF of guardrail
Installation of 1675 LF of new guardrail
Pulverizing (6 inch depth) 203 STA
Aggregate Base 300 tons
3.5 inch asphalt paving 10,000 tons
Installation of 2 cattle guards
Installation of 49 signs and 90 delineators
Pavement markings 81,230 LF
Traffic control
The contracting range for this project is between $2 million to $4 million.
Update #1 ·
THIS IS NOT AN INVITATION FOR BID - PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE. THE TENATIVE ADVERTISEMENT DATE IS FEBRUARY 16, 2016. THIS PROJECT HAS BEEN SET-ASIDE FOR SMALL BUSINESSES.
Project Location
This project begins at the intersection of Pathfinder Road (CR409) and CR 408. The project is near Pathfinder Reservoir approximately 44 miles southwest of Casper, WY. The project is 3.84 miles in length.
Scope of the Work
The project consists of pulverizing and repaving 3.84 miles of 22 foot existing asphalt surface. The new asphalt surface will be 3.5 inches in depth.
Principal work items include:
Removal of 1700 LF of guardrail
Installation of 1675 LF of new guardrail
Pulverizing (6 inch depth) 203 STA
Aggregate Base 300 tons
3.5 inch asphalt paving 10,000 tons
Installation of 2 cattle guards
Installation of 49 signs and 90 delineators
Pavement markings 81,230 LF
Traffic control
The contracting range for this project is between $2 million to $4 million.
Files
| File | Type | Posted |
|---|---|---|
| Bid_Tabs.pdf | ||
| Bid_Opening_Summary.pdf | ||
| Q-A _3-21.pdf | ||
| DTFH6815B00032.pdf | ||
| WYFLAP_408(1)_100__Signed_Plan_Set_2_11_16.pdf | ||
| Final_Tech_Memo_Fremont_Canyon_Road_4-22-14_.pdf | ||
| Final_Hydraulic_Recommendation_Report.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity