WWYK250096 - Repair Stormwater Spill Gate 11 Structure
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- FA813726R0032
- Agency
-
Air Force Sustainment Center
Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- Woman-Owned Small Business Sole Source
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z2KA Repair Or Alteration Of Dams
- Place of performance
- Tinker AFB, Oklahoma 73145, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Materiel Command Air Force Sustainment Center is preparing to solicit repair of Spill Gate 11 at Tinker Air Force Base, Oklahoma, under a woman-owned small business sole-source set-aside.
The work consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals required to repair the concrete spill gate structure (Spill Gate 11 / Outfall 9) to reestablish channel flow that conveys stormwater upstream from within the base outside the perimeter fence via Soldier Creek. Place of performance is Tinker Air Force Base, Oklahoma.
The estimated magnitude of construction falls between one million and five million dollars. Period of performance is 270 calendar days from notice to proceed. Funds are not presently available for this contract; the government's obligation is contingent upon appropriation and the Contracting Officer's written confirmation of availability to the contractor.
The pre-solicitation notice was posted May 5, 2026, with a due date of April 20, 2026, indicating a timing discrepancy in the source record.
Notice text
The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair of the concrete spill gate structure (Spill Gate 11 / Outfall 9) to reestablish the existing channel flow that conveys stormwater upstream from within TAFB outside the perimeter fence via Solider Creek at Tinker Air Force Base (AFB), Oklahoma (reference the project drawings for additional location information).
IAW FAR 36.204(f) THE ESTIMATED MAGNITUDE OF THIS PROJECT IS BETWEEN Magnitude of Construction: $1,000,000 - $5,000,000
IAW FAR 52.232-18 and AFFARS MP 5332.7 - Availability of Funds: Funds are not presently available for this contract. The governments obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
(Period of Performance 270 Calander Days NTP)
Notice history
| Notice | Type | Posted |
|---|---|---|
| WWYK250096 - Repair Stormwater Spill Gate 11 Structure | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WWYK100209-Repair Perimeter Dr and Industrial Blvd | Air Force Sustainment Center | Woman-Owned Small Business Sole Source | |
| WWYK250063 - install react VII facility, B9001, post V19 | Air Force Sustainment Center | Woman-Owned Small Business | |
| WWYK260004 - repair structural integrity, B1134, post 34 & north wall | Air Force Sustainment Center | Total Small Business | |
| Service Repair for Sciaky Spot Welder | Air Force Sustainment Center | No set-aside | |
| W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning | ENDIST Portland | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity