Woods Hole Patio Area Drainage Project

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
1305M325Q0218
Agency
National Oceanic and Atmospheric Administration Department of Commerce
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Y1PZ Construction Of Other Non-Building Facilities
Place of performance
Woods Hole, Massachusetts 02543, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The National Oceanic and Atmospheric Administration (NOAA) is seeking a contractor to perform drainage system renovations at the Woods Hole Laboratory located at 166 Water Street in Woods Hole, Massachusetts. The project involves comprehensive drainage work including core drilling, installation of trench drains and catch basins, drain piping, excavation and stone base work, backfilling, removal and reinstallation of flagstone pavers, and landscape repair to prevent erosion of the patio area. Contractors must provide all labor, materials, transportation, supervision, storage, and warranty for the work, and must comply with Davis-Bacon wage requirements with minimum rates ranging from $25.02 to $69.84 per hour depending on job classification. The evaluation will use a best value trade-off approach where technical capability and past performance are considered significantly more important than price. A mandatory site visit was scheduled for August 13, 2025, and quotes are due by September 1, 2025, following an amendment that extended the original deadline and incorporated responses to seven contractor inquiries.

This opportunity is designated as a total small business set-aside under NAICS code 237990 (Other Heavy and Civil Engineering Construction) with an estimated project value between $25,000 and $100,000. No incumbent contractors or preferred vendors are identified in the solicitation materials. The project timeline specifies a 45-60 day period of performance following the Notice to Proceed, with construction hours limited to 7:00 AM to 3:30 PM, Monday through Friday. The work will be performed at the Northeast Fisheries Science Center Woods Hole Laboratory in Woods Hole, Falmouth, Massachusetts, where the patio area can be closed during construction activities. The contractor will be responsible for obtaining NOAA, NMFS, and NEFSC design approval prior to construction, though no additional local or federal permits are required beyond this approval process.

Notice text

2 versions

Update #2 · Latest ·

Amendment 1 - Incorporates the Government's responses to all Requests for Information (RFIs) received before the deadline and extends the Quote Due Date. Please acknowledge the SF30 when submitting your quote by attaching a signed copy.

Please review the attached Request for Quotes (RFQ), Statement of Work (SOW), and Davis Bacon Act Wage Rates. Contractor shall provide all labor, materials, transportation, supervision, storage and warranty for drainage renovations at the Woods Hole Laboratory in accordance with the Statement of Work.

Update #1 ·

Please review the attached Request for Quotes (RFQ), Statement of Work (SOW), and Davis Bacon Act Wage Rates. 

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Woods Hole Patio Area Drainage Project Award Award Notice
Woods Hole Patio Area Drainage Project This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity