William J. Green Federal Building Restack Phase 2B Renovation Project
Closed Solicitation Posted
- Solicitation number
- 47PD0121R0022
- Agency
-
Region 3
Public Buildings Service, General Services Administration
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Z1AA Maintenance Of Office Buildings
- Place of performance
- Philadelphia, Pennsylvania 19106, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The General Services Administration seeks to award a firm fixed-price contract to complete interior tenant fit-outs and upgrades at the William J. Green Federal Building in Philadelphia as part of Phase 2B of the building's renovation project. Proposals will be evaluated in two phases, with Phase 1 due June 4, 2021 focusing on past experience and performance, while Phase 2 will incorporate technical specifications and pricing. The selected contractor must minimize disruptions to occupied tenant agencies including the FBI, IRS, and DEA by scheduling noisy work off-hours and maintaining close coordination. Offerors must demonstrate the ability to perform the work within 480 calendar days from notice to proceed while obtaining necessary security clearances to access sensitive agency spaces.
There is no set-aside designation for this procurement. The primary NAICS code is 238210 and PSC code S206. The incumbent contractor is [contractor name]. The work involves renovating approximately 125,800 square feet and upgrading building systems over 480 calendar days at the William Penn Annex East location in Philadelphia, Pennsylvania. Security protocols must be followed given the sensitive nature of on-site agency activities.
Notice text
5 versions
Update #5 · Latest ·
GOVERNMENTS FORMAL AMENDMENT 006 POSTED 8/23/2021 Restricted Design documents and Revised Davis Bacon Wage determination The following information is uploaded with restricted access only available to contractors who have been selected to proceed from round one source selection to round two. The Governments' amendment 006 consists of the follow:
1. Zip drive 19853Z
2. Zip drive 192357Z
3. Zip drive 193007Z
4. Revised Governments Amednment document 006
5. Updated Davis Bacon Wage determiniation
GOVERNMENT'S FORMAL AMENDMENT 003 POSTED 5/25/2021
GOVERNMENT'S FORMAL AMENDMENT 002 POSTED 5/72021
GOVERNMENT'S FORMAL AMENDMENT 001 POSTED 4/26/2021
The General Services Administration has a requirement to procure construction services at the William J. Green Federal Building located at 6th and Market Streets, Philadelphia PA for Phase 2B of the Green Restack Interior Renovation Project. The Green Building is a 10 story office building containing 507,669 usable square feet, and 708,975 rentable square feet. It was designed in conjunction with the adjacent James A. Byrne Courthouse & constructed between 1970 and 1973. The main customer agencies are the Federal Bureau of Investigation (FBI), the Internal Revenue Service (IRS), and the Drug Enforcement Administration (DEA).
Until November 2016, the Green Federal Building had not had a major renovation since it was built, aside from having the air handling units replaced as part of ARRA. There have been many non-strategic office expansions and ad-hoc space releases occur throughout the building. This has resulted in non-contiguous blocks of tenant space on multiple floors, creating operational inefficiencies that are a challenge to customer agencies.
In November 2016 GSA awarded a Guaranteed Maximum Price Contract for the construction/renovation of multiple tenant agencies to provide an effective long term housing solution for various tenant government agencies within the Green Federal building. Performing tenant improvements and building system upgrades will improve the building's current utilization, free up marketable vacant space, and allow local leases to consolidate in a federally owned facility. This project, designated as Restack Phase 2B will be awarded as a FIRM FIXED PRICE, for the remaining interior tenant fit-out renovations. The project will help agencies to reduce and right size their agency to help GSA meet the Utilization Rate goals (utilization rate will improve by 28%, office utilization rates will improve by 40%), while simultaneously moving approximately 120k SF of lease space back to federal space.
The building will be occupied during the construction phase which may cause disruptions to the tenant’s and their operations. The contract is required to make every attempt to mitigate such disruptions by conducting certain tasks on nights and weekends and also by having early and frequent communications with all tenant agencies affording them ample time to properly prepare and make adjustments. The contractor will be required to submit a “Management Plan” with their technical proposal which will be evaluated prior to making a selection.
The Green Federal Building houses several high profile and security sensitive agencies who carry out missions that are vital to National Security. The construction must be conducted in a manner that provides minimal disruptions to their daily activities. The building provides limited swing space which will make this project significantly more challenging. To minimize disruptions, it is the goal of the project team to only move each agency once.
The Contractor shall provide and pay for all labor, materials, equipment, tools, water, heat, utilities, transportation, and other facilities and services necessary for the proper execution of the work described in and reasonably inferable from the Contract Documents (the Work), whether temporary or permanent. In consideration for, and upon condition of, the Contractor's completion of the Work, GSA shall pay the Contractor the price or prices established in the contract, subject to the terms and conditions set forth in this Contract.
The building will be occupied during the construction phase and contractors will be required to perform heavy noise producing work and or chemical work causing odors off hours to minimize disruptions to the tenant’s and their operations. The Green Federal Building houses several high profile and security sensitive agencies and therefore contractors will be required to obtain security clearances to work within the building, any contractors not able to obtain such clearances will not be permitted to work. The construction must be conducted in a manner that provides minimal disruptions to their daily activities. The building provides limited swing space which will make this project significantly more challenging. To minimize disruptions, it is the goal of the project team to only move each agency once. Covid-19 safety protocols will be required to be followed by all contractors working in the building.
Further requirements are contained with the specifications and documents.
GOVERNMENTS FORMAL AMENDMENT 001 POSTED 4/26/2021
GOVERNMENT'S FORMAL AMENDMENT 002 POSTED 5/7/2021
GOVERNMENT'S FORMAL AMENDMENT 003 POSTED 5/25/2021
Update #4 ·
GOVERNMENT'S FORMAL AMENDMENT 003 POSTED 5/25/2021
GOVERNMENT'S FORMAL AMENDMENT 002 POSTED 5/72021
GOVERNMENT'S FORMAL AMENDMENT 001 POSTED 4/26/2021
The General Services Administration has a requirement to procure construction services at the William J. Green Federal Building located at 6th and Market Streets, Philadelphia PA for Phase 2B of the Green Restack Interior Renovation Project. The Green Building is a 10 story office building containing 507,669 usable square feet, and 708,975 rentable square feet. It was designed in conjunction with the adjacent James A. Byrne Courthouse & constructed between 1970 and 1973. The main customer agencies are the Federal Bureau of Investigation (FBI), the Internal Revenue Service (IRS), and the Drug Enforcement Administration (DEA).
Until November 2016, the Green Federal Building had not had a major renovation since it was built, aside from having the air handling units replaced as part of ARRA. There have been many non-strategic office expansions and ad-hoc space releases occur throughout the building. This has resulted in non-contiguous blocks of tenant space on multiple floors, creating operational inefficiencies that are a challenge to customer agencies.
In November 2016 GSA awarded a Guaranteed Maximum Price Contract for the construction/renovation of multiple tenant agencies to provide an effective long term housing solution for various tenant government agencies within the Green Federal building. Performing tenant improvements and building system upgrades will improve the building's current utilization, free up marketable vacant space, and allow local leases to consolidate in a federally owned facility. This project, designated as Restack Phase 2B will be awarded as a FIRM FIXED PRICE, for the remaining interior tenant fit-out renovations. The project will help agencies to reduce and right size their agency to help GSA meet the Utilization Rate goals (utilization rate will improve by 28%, office utilization rates will improve by 40%), while simultaneously moving approximately 120k SF of lease space back to federal space.
The building will be occupied during the construction phase which may cause disruptions to the tenant’s and their operations. The contract is required to make every attempt to mitigate such disruptions by conducting certain tasks on nights and weekends and also by having early and frequent communications with all tenant agencies affording them ample time to properly prepare and make adjustments. The contractor will be required to submit a “Management Plan” with their technical proposal which will be evaluated prior to making a selection.
The Green Federal Building houses several high profile and security sensitive agencies who carry out missions that are vital to National Security. The construction must be conducted in a manner that provides minimal disruptions to their daily activities. The building provides limited swing space which will make this project significantly more challenging. To minimize disruptions, it is the goal of the project team to only move each agency once.
The Contractor shall provide and pay for all labor, materials, equipment, tools, water, heat, utilities, transportation, and other facilities and services necessary for the proper execution of the work described in and reasonably inferable from the Contract Documents (the Work), whether temporary or permanent. In consideration for, and upon condition of, the Contractor's completion of the Work, GSA shall pay the Contractor the price or prices established in the contract, subject to the terms and conditions set forth in this Contract.
The building will be occupied during the construction phase and contractors will be required to perform heavy noise producing work and or chemical work causing odors off hours to minimize disruptions to the tenant’s and their operations. The Green Federal Building houses several high profile and security sensitive agencies and therefore contractors will be required to obtain security clearances to work within the building, any contractors not able to obtain such clearances will not be permitted to work. The construction must be conducted in a manner that provides minimal disruptions to their daily activities. The building provides limited swing space which will make this project significantly more challenging. To minimize disruptions, it is the goal of the project team to only move each agency once. Covid-19 safety protocols will be required to be followed by all contractors working in the building.
Further requirements are contained with the specifications and documents.
GOVERNMENTS FORMAL AMENDMENT 001 POSTED 4/26/2021
GOVERNMENT'S FORMAL AMENDMENT 002 POSTED 5/7/2021
GOVERNMENT'S FORMAL AMENDMENT 003 POSTED 5/25/2021
Update #3 ·
GOVERNMENT'S FORMAL AMENDMENT 002 POSTED 5/72021
GOVERNMENT'S FORMAL AMENDMENT 001 POSTED 4/26/2021
The General Services Administration has a requirement to procure construction services at the William J. Green Federal Building located at 6th and Market Streets, Philadelphia PA for Phase 2B of the Green Restack Interior Renovation Project. The Green Building is a 10 story office building containing 507,669 usable square feet, and 708,975 rentable square feet. It was designed in conjunction with the adjacent James A. Byrne Courthouse & constructed between 1970 and 1973. The main customer agencies are the Federal Bureau of Investigation (FBI), the Internal Revenue Service (IRS), and the Drug Enforcement Administration (DEA).
Until November 2016, the Green Federal Building had not had a major renovation since it was built, aside from having the air handling units replaced as part of ARRA. There have been many non-strategic office expansions and ad-hoc space releases occur throughout the building. This has resulted in non-contiguous blocks of tenant space on multiple floors, creating operational inefficiencies that are a challenge to customer agencies.
In November 2016 GSA awarded a Guaranteed Maximum Price Contract for the construction/renovation of multiple tenant agencies to provide an effective long term housing solution for various tenant government agencies within the Green Federal building. Performing tenant improvements and building system upgrades will improve the building's current utilization, free up marketable vacant space, and allow local leases to consolidate in a federally owned facility. This project, designated as Restack Phase 2B will be awarded as a FIRM FIXED PRICE, for the remaining interior tenant fit-out renovations. The project will help agencies to reduce and right size their agency to help GSA meet the Utilization Rate goals (utilization rate will improve by 28%, office utilization rates will improve by 40%), while simultaneously moving approximately 120k SF of lease space back to federal space.
The building will be occupied during the construction phase which may cause disruptions to the tenant’s and their operations. The contract is required to make every attempt to mitigate such disruptions by conducting certain tasks on nights and weekends and also by having early and frequent communications with all tenant agencies affording them ample time to properly prepare and make adjustments. The contractor will be required to submit a “Management Plan” with their technical proposal which will be evaluated prior to making a selection.
The Green Federal Building houses several high profile and security sensitive agencies who carry out missions that are vital to National Security. The construction must be conducted in a manner that provides minimal disruptions to their daily activities. The building provides limited swing space which will make this project significantly more challenging. To minimize disruptions, it is the goal of the project team to only move each agency once.
The Contractor shall provide and pay for all labor, materials, equipment, tools, water, heat, utilities, transportation, and other facilities and services necessary for the proper execution of the work described in and reasonably inferable from the Contract Documents (the Work), whether temporary or permanent. In consideration for, and upon condition of, the Contractor's completion of the Work, GSA shall pay the Contractor the price or prices established in the contract, subject to the terms and conditions set forth in this Contract.
The building will be occupied during the construction phase and contractors will be required to perform heavy noise producing work and or chemical work causing odors off hours to minimize disruptions to the tenant’s and their operations. The Green Federal Building houses several high profile and security sensitive agencies and therefore contractors will be required to obtain security clearances to work within the building, any contractors not able to obtain such clearances will not be permitted to work. The construction must be conducted in a manner that provides minimal disruptions to their daily activities. The building provides limited swing space which will make this project significantly more challenging. To minimize disruptions, it is the goal of the project team to only move each agency once. Covid-19 safety protocols will be required to be followed by all contractors working in the building.
Further requirements are contained with the specifications and documents.
GOVERNMENTS FORMAL AMENDMENT 001 POSTED 4/26/2021
GOVERNMENT'S FORMAL AMENDMENT 002 POSTED 5/7/2021
Update #2 ·
The General Services Administration has a requirement to procure construction services at the William J. Green Federal Building located at 6th and Market Streets, Philadelphia PA for Phase 2B of the Green Restack Interior Renovation Project. The Green Building is a 10 story office building containing 507,669 usable square feet, and 708,975 rentable square feet. It was designed in conjunction with the adjacent James A. Byrne Courthouse & constructed between 1970 and 1973. The main customer agencies are the Federal Bureau of Investigation (FBI), the Internal Revenue Service (IRS), and the Drug Enforcement Administration (DEA).
Until November 2016, the Green Federal Building had not had a major renovation since it was built, aside from having the air handling units replaced as part of ARRA. There have been many non-strategic office expansions and ad-hoc space releases occur throughout the building. This has resulted in non-contiguous blocks of tenant space on multiple floors, creating operational inefficiencies that are a challenge to customer agencies.
In November 2016 GSA awarded a Guaranteed Maximum Price Contract for the construction/renovation of multiple tenant agencies to provide an effective long term housing solution for various tenant government agencies within the Green Federal building. Performing tenant improvements and building system upgrades will improve the building's current utilization, free up marketable vacant space, and allow local leases to consolidate in a federally owned facility. This project, designated as Restack Phase 2B will be awarded as a FIRM FIXED PRICE, for the remaining interior tenant fit-out renovations. The project will help agencies to reduce and right size their agency to help GSA meet the Utilization Rate goals (utilization rate will improve by 28%, office utilization rates will improve by 40%), while simultaneously moving approximately 120k SF of lease space back to federal space.
The building will be occupied during the construction phase which may cause disruptions to the tenant’s and their operations. The contract is required to make every attempt to mitigate such disruptions by conducting certain tasks on nights and weekends and also by having early and frequent communications with all tenant agencies affording them ample time to properly prepare and make adjustments. The contractor will be required to submit a “Management Plan” with their technical proposal which will be evaluated prior to making a selection.
The Green Federal Building houses several high profile and security sensitive agencies who carry out missions that are vital to National Security. The construction must be conducted in a manner that provides minimal disruptions to their daily activities. The building provides limited swing space which will make this project significantly more challenging. To minimize disruptions, it is the goal of the project team to only move each agency once.
The Contractor shall provide and pay for all labor, materials, equipment, tools, water, heat, utilities, transportation, and other facilities and services necessary for the proper execution of the work described in and reasonably inferable from the Contract Documents (the Work), whether temporary or permanent. In consideration for, and upon condition of, the Contractor's completion of the Work, GSA shall pay the Contractor the price or prices established in the contract, subject to the terms and conditions set forth in this Contract.
The building will be occupied during the construction phase and contractors will be required to perform heavy noise producing work and or chemical work causing odors off hours to minimize disruptions to the tenant’s and their operations. The Green Federal Building houses several high profile and security sensitive agencies and therefore contractors will be required to obtain security clearances to work within the building, any contractors not able to obtain such clearances will not be permitted to work. The construction must be conducted in a manner that provides minimal disruptions to their daily activities. The building provides limited swing space which will make this project significantly more challenging. To minimize disruptions, it is the goal of the project team to only move each agency once. Covid-19 safety protocols will be required to be followed by all contractors working in the building.
Further requirements are contained with the specifications and documents.
GOVERNMENTS FORMAL AMENDMENT 001 POSTED 4/26/2021
Update #1 ·
The General Services Administration has a requirement to procure construction services at the William J. Green Federal Building located at 6th and Market Streets, Philadelphia PA for Phase 2B of the Green Restack Interior Renovation Project. The Green Building is a 10 story office building containing 507,669 usable square feet, and 708,975 rentable square feet. It was designed in conjunction with the adjacent James A. Byrne Courthouse & constructed between 1970 and 1973. The main customer agencies are the Federal Bureau of Investigation (FBI), the Internal Revenue Service (IRS), and the Drug Enforcement Administration (DEA).
Until November 2016, the Green Federal Building had not had a major renovation since it was built, aside from having the air handling units replaced as part of ARRA. There have been many non-strategic office expansions and ad-hoc space releases occur throughout the building. This has resulted in non-contiguous blocks of tenant space on multiple floors, creating operational inefficiencies that are a challenge to customer agencies.
In November 2016 GSA awarded a Guaranteed Maximum Price Contract for the construction/renovation of multiple tenant agencies to provide an effective long term housing solution for various tenant government agencies within the Green Federal building. Performing tenant improvements and building system upgrades will improve the building's current utilization, free up marketable vacant space, and allow local leases to consolidate in a federally owned facility. This project, designated as Restack Phase 2B will be awarded as a FIRM FIXED PRICE, for the remaining interior tenant fit-out renovations. The project will help agencies to reduce and right size their agency to help GSA meet the Utilization Rate goals (utilization rate will improve by 28%, office utilization rates will improve by 40%), while simultaneously moving approximately 120k SF of lease space back to federal space.
The building will be occupied during the construction phase which may cause disruptions to the tenant’s and their operations. The contract is required to make every attempt to mitigate such disruptions by conducting certain tasks on nights and weekends and also by having early and frequent communications with all tenant agencies affording them ample time to properly prepare and make adjustments. The contractor will be required to submit a “Management Plan” with their technical proposal which will be evaluated prior to making a selection.
The Green Federal Building houses several high profile and security sensitive agencies who carry out missions that are vital to National Security. The construction must be conducted in a manner that provides minimal disruptions to their daily activities. The building provides limited swing space which will make this project significantly more challenging. To minimize disruptions, it is the goal of the project team to only move each agency once.
The Contractor shall provide and pay for all labor, materials, equipment, tools, water, heat, utilities, transportation, and other facilities and services necessary for the proper execution of the work described in and reasonably inferable from the Contract Documents (the Work), whether temporary or permanent. In consideration for, and upon condition of, the Contractor's completion of the Work, GSA shall pay the Contractor the price or prices established in the contract, subject to the terms and conditions set forth in this Contract.
The building will be occupied during the construction phase and contractors will be required to perform heavy noise producing work and or chemical work causing odors off hours to minimize disruptions to the tenant’s and their operations. The Green Federal Building houses several high profile and security sensitive agencies and therefore contractors will be required to obtain security clearances to work within the building, any contractors not able to obtain such clearances will not be permitted to work. The construction must be conducted in a manner that provides minimal disruptions to their daily activities. The building provides limited swing space which will make this project significantly more challenging. To minimize disruptions, it is the goal of the project team to only move each agency once. Covid-19 safety protocols will be required to be followed by all contractors working in the building.
Further requirements are contained with the specifications and documents.