Westshore Lake Pontchartrain Sand Stockpile
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912P820B0060
- Agency
-
ENDIST New Orleans
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Laplace LA 70068 USA
Notice details come from SAM.gov. Updated .
About this opportunity
The United States Army Corps of Engineers, New Orleans District is soliciting bids to excavate approximately 750,000 cubic yards of sand material from the Bonnet Carre spillway, haul and stockpile the sand in the Highway 61 stockpile area in St. Charles and St. John the Baptist Parishes, Louisiana. Additional requirements include clearing and grubbing vegetation from the stockpile area, constructing and maintaining crushed stone access roads, and providing bid, payment and performance bonds. Bids were due virtually by December 18, 2020, with amendments issued to provide clarification on questions and adjust the bid opening date.
This total small business set-aside procurement has a NAICS code of 237990, PSC code of R999, and place of performance in Laplace, Louisiana. Estimates indicate a value between $10-25 million for the work. Eleven contractors submitted bids ranging from approximately $9.4 million to $18.8 million, with E & L Construction Group submitting the low bid of $13.5 million and the government estimate being $11.6 million. Amendments to the solicitation responded to industry questions and adjusted the bid opening schedule and requirements.
Notice text
5 versions
Update #5 · Latest ·
The United States Army Corps of Engineers (USACE) New Orleans District has the following requirement: DESCRIPTION WORK: The work consists of excavating sand material from the Bonnet Carre spillway, hauling and stockpiling sand material in the U.S. Highway 61 stockpile area; clearing and grubbing vegetation from the stockpile area and other incidental work. Crushed stone roads will be constructed and maintained. Sand to be stockpiled is 750,000 cubic yards.
In accordance with DFARS 236.204, the magnitude of the work is between $10 and $25 Million dollars.
This procurement will require a bid bond, and payment and performance bonds to be provided shortly after award as will be stipulated in the Invitation for Bid. Bid opening will be conducted virtually.
Amendments:
0001, issued 11/2/2020 to change bid opening date and update Site Visit POC
0002, issued 11/3/2020 to provide answer to industry question and set date for submission of questions
0003, issued 11/19/2020 to provide answers to Industry Questions, Engineering Changes, Set new Question Deadline Date and A statement that a subsequent amendment will be forthcoming extending the bid opening date
0004, issued 11/20/2020 to set a new bid due date and bid opening date
0005, issued 12/7/2020 to provide answers to Industry Questions
Signed Bid Abstract uploaded 12/21/2020
**************************************************************************************************************************************
12/18/2020 - URGENT UPDATE
Due to technically difficulties, the Bid Opening Reading will take place on a new teleconference line. Please use the following call-in information to attend the meeting:
Toll-Free: 844-291-5495
Access Code: 7032586
Update #4 ·
The United States Army Corps of Engineers (USACE) New Orleans District has the following requirement: DESCRIPTION WORK: The work consists of excavating sand material from the Bonnet Carre spillway, hauling and stockpiling sand material in the U.S. Highway 61 stockpile area; clearing and grubbing vegetation from the stockpile area and other incidental work. Crushed stone roads will be constructed and maintained. Sand to be stockpiled is 750,000 cubic yards.
In accordance with DFARS 236.204, the magnitude of the work is between $10 and $25 Million dollars.
This procurement will require a bid bond, and payment and performance bonds to be provided shortly after award as will be stipulated in the Invitation for Bid. Bid opening will be conducted virtually.
Amendments:
0001, issued 11/2/2020 to change bid opening date and update Site Visit POC
0002, issued 11/3/2020 to provide answer to industry question and set date for submission of questions
0003, issued 11/19/2020 to provide answers to Industry Questions, Engineering Changes, Set new Question Deadline Date and A statement that a subsequent amendment will be forthcoming extending the bid opening date
0004, issued 11/20/2020 to set a new bid due date and bid opening date
0005, issued 12/7/2020 to provide answers to Industry Questions
**************************************************************************************************************************************
12/18/2020 - URGENT UPDATE
Due to technically difficulties, the Bid Opening Reading will take place on a new teleconference line. Please use the following call-in information to attend the meeting:
Toll-Free: 844-291-5495
Access Code: 7032586
Update #3 ·
The United States Army Corps of Engineers (USACE) New Orleans District has the following requirement: DESCRIPTION WORK: The work consists of excavating sand material from the Bonnet Carre spillway, hauling and stockpiling sand material in the U.S. Highway 61 stockpile area; clearing and grubbing vegetation from the stockpile area and other incidental work. Crushed stone roads will be constructed and maintained. Sand to be stockpiled is 750,000 cubic yards.
In accordance with DFARS 236.204, the magnitude of the work is between $10 and $25 Million dollars.
This procurement will require a bid bond, and payment and performance bonds to be provided shortly after award as will be stipulated in the Invitation for Bid. Bid opening will be conducted virtually.
Amendments:
0001, issued 11/2/2020 to change bid opening date and update Site Visit POC
0002, issued 11/3/2020 to provide answer to industry question and set date for submission of questions
0003, issued 11/19/2020 to provide answers to Industry Questions, Engineering Changes, Set new Question Deadline Date and A statement that a subsequent amendment will be forthcoming extending the bid opening date
0004, issued 11/20/2020 to set a new bid due date and bid opening date
0005, issued 12/7/2020 to provide answers to Industry Questions
Update #2 ·
The United States Army Corps of Engineers (USACE) New Orleans District has the following requirement: DESCRIPTION WORK: The work consists of excavating sand material from the Bonnet Carre spillway, hauling and stockpiling sand material in the U.S. Highway 61 stockpile area; clearing and grubbing vegetation from the stockpile area and other incidental work. Crushed stone roads will be constructed and maintained. Sand to be stockpiled is 750,000 cubic yards.
In accordance with DFARS 236.204, the magnitude of the work is between $10 and $25 Million dollars.
This procurement will require a bid bond, and payment and performance bonds to be provided shortly after award as will be stipulated in the Invitation for Bid. Bid opening will be conducted virtually.
Amendments:
0001, issued 11/2/2020 to change bid opening date and update Site Visit POC
0002, issued 11/3/2020 to provide answer to industry question and set date for submission of questions
0003, issued 11/19/2020 to provide answers to Industry Questions, Engineering Changes, Set new Question Deadline Date and A statement that a subsequent amendment will be forthcoming extending the bid opening date
0004, issued 11/20/20 to set a new bid due date and bid opening date
Update #1 ·
The United States Army Corps of Engineers (USACE) New Orleans District has the following requirement: DESCRIPTION WORK: The work consists of excavating sand material from the Bonnet Carre spillway, hauling and stockpiling sand material in the U.S. Highway 61 stockpile area; clearing and grubbing vegetation from the stockpile area and other incidental work. Crushed stone roads will be constructed and maintained. Sand to be stockpiled is 750,000 cubic yards.
In accordance with DFARS 236.204, the magnitude of the work is between $10 and $25 Million dollars.
This procurement will require a bid bond, and payment and performance bonds to be provided shortly after award as will be stipulated in the Invitation for Bid. Bid opening will be conducted virtually.
Amendments:
0001, issued 11/2/2020 to change bid opening date and update Site Visit POC
0002, issued 11/3/2020 to provide answer to industry question and set date for submission of questions
Files
| File | Type | Posted |
|---|---|---|
| W912P820B0060 Bid Abstract SIGNED.pdf | ||
| W912P820B0060-P00005.pdf | ||
| W912P820B0060-P00004.pdf | ||
| W912P820B0060-P00003.pdf | ||
| W912P820B0060-P00002.pdf | ||
| W912P820B0060 Solicitation.pdf | ||
| W912P820B0060-P00001.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Westshore Lake Pontchartrain Sand Stockpile | Award Notice | |
| This notice | Solicitation | |
| Westshore Lake Pontchartrain Sand Stockpile | Pre-Solicitation | |
| Catfish Point Control Structure, Sector Gate Replacement | Solicitation | |
| Catfish Point Control Structure, Sector Gate Replacement | Pre-Solicitation | |
| FY20 gulf coast regional hopper dredging | Solicitation | |
| USACE20HOPPER | Pre-Solicitation |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity