This document contains an amendment to a solicitation for a federal construction contract. The United States Army Corps of Engineers, New Orleans District, requires excavation of approximately 750,000 cubic yards of sand material from the Bonnet Carre spillway in St. Charles and St. John the Baptist Parishes, Louisiana. The sand will be hauled and stockpiled in the U.S. Highway 61 stockpile area, and crushed stone roads will be constructed and maintained. The amendment provides responses to 30 questions from industry, addressing conditions of borrow pits, responsibility for road maintenance, traffic plans and haul routes. The magnitude of work is estimated between $10 million and $25 million.

View the file

Other files

File Type Posted
W912P820B0060 Bid Abstract SIGNED.pdf PDF
W912P820B0060-P00004.pdf PDF
W912P820B0060-P00003.pdf PDF
W912P820B0060 Solicitation.pdf PDF
W912P820B0060-P00002.pdf PDF
W912P820B0060-P00001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

West Shore Lake Pontchartrain, Louisiana, Hurricane and Storm Damage Risk Reduction Project, Sand Stockpile Contract 1, St. Charles and St. John the Baptist Parishes, Louisiana (ED 20-028) has been amended to:

1. Provide the Government Response to Additional Industry Questions.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Dec-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P820B0060

X 9B. DATED (SEE ITEM 11)

14-Oct-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Dec-2020

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P820B0060

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - INSTRUCTIONS TO BIDDERS

The following have been added by full text:

AMENDMENT 0005

Industry Question and Government Response for West Shore Lake Pontchartrain, Louisiana, Hurricane and Storm Damage Risk Reduction Project, Sand Stockpile Contract 1, St. Charles and St. John the Baptist Parishes, Louisiana (ED 20-028) Q.20 The current Pit #6 has a road spitting the pit. Will this road still be intact upon mobilization for this bid? If so, will contractors be able to excavate and use this road material if it meets specification?

A.20 Government Response: Yes. The contractor shall utilize all material within the boundaries of the pit.

Q.21 Will there be another contract issued prior to this contract for someone to go in and remove any overburden or clay in the pits?

A.21 Government Response: No.

Q.22 What will be the condition of the borrow pits upon mobilization in comparison to the current pit conditions?

A.22 Government Response: No change in conditions, other than natural changes due to weather conditions.

Q.23 Will another contractor be establishing the egress route on the Northeast side of HWY 61 prior to this contract?

A.23 Government Response: Asphalt pavement will be placed on the existing levee egress ramp by others. This is the only improvement to the egress route. All other necessary improvements to the egress route will be the responsibility of the contractor throughout the duration of this contract.

Q.24 Who will be responsible for maintaining the existing spillway haul roads if multiple contractors will be utilizing the roads during this contract?

A.24 Government Response: The contractor is responsible for coordinating with other contractors using the same access roads. It is a shared responsibility to maintain the access roads.

Q.25 Why are sections of the borings shown as "No Sample" taken?

A.25 Government Response: Issues retrieving the samples due to soil conditions resulted in no samples being obtained.

Q.26 Does the Corps have additional restrictions on how these trucks may find their way back to the spillway?

A.26 Government Response: See specification Section 01 55 26.00 12 Traffic Control and Coordination. Your Traffic Engineer shall develop the haul routes. The proposed routes shall be coordinated with local and state authorities and avoid residential neighborhoods.

Q.27 Can the Corps suggest a best acceptable route, or provide guidelines on route selection?

A.27 Government Response: No. Your Traffic Engineer shall prepare the traffic control and truck haul route plan after coordinating with local and state authorities.

W912P820B0060

Q.28 Is there a possible flagman alternative that would be considered sufficient to allow trucks departing the stockpile area to turn left onto Airline Hwy?

A.28 Government Response: No.

Q.29 Can you please provide the Corps' estimated quantities for the lump sum bid items?

A.29 Government Response: See Amendment 3, Question #2.

Q.30 Egress from the Bonnet Carre Spillway to Hwy 61 is impassable. Will it be the contractor's responsibility to fix the road or will this be handled by others?

A.30 Government Response: It is the contractor’s responsibility to improve the road for hauling.

The egress levee ramp will be improved by others.

Q.31 If the contractor were to provide additional ingress and egress to the Bonnet Carre Spillway, would this be acceptable by the Government?

A.31 Government Response: The approval of additional ingress and egress may be granted on a case-by-case basis. There is no guarantee that the Government will accept alternate haul routes.

(End of Summary of Changes)