West muddy creek #5 bridge replacement

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
1240LT25R0046
Agency
Forest Service Department of Agriculture
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Gunnison, Colorado, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Agriculture Forest Service is seeking contractors for the West Muddy Creek Bridge #4 and Bridge #5 Replacement project in the Gunnison National Forest, Colorado. The project involves replacing two bridges on National Forest Service Road 261 to restore access and accommodate highway loading vehicles with 85,000 pound vehicle configurations utilizing AASHTO LRFD RL-93 loadings. Work must be performed according to the project drawings and specifications provided for each bridge structure. A mandatory site visit was held on September 3, 2025, at 10:00 a.m. Mountain Time, with contractors required to schedule attendance by September 2, 2025. Amendment A0001 issued on September 10, 2025, provides the site visit attendees list and answers to contractor questions. Proposals are due by 11:00 a.m. Central Time on September 26, 2025, and must be submitted via email to the designated contracting officers.

This solicitation is designated as a Total Small Business set-aside opportunity under NAICS code 237310 for Highway, Street, and Bridge Construction. The contract performance period extends from October 1, 2025, through October 31, 2026, with no field work expected during winter months as contractors should focus on preparing submittals and equipment for spring groundwork. Both bridges can be worked on simultaneously, and there are no weight limitations between the bridge sites and Highway 133. The project site is located at coordinates 39°06'56.5"N 107°31'28.4"W on Forest Service Road 265 at mile post 15.01 in Gunnison, Colorado. Site conditions include year-round water flow with higher volumes during spring runoff, and temporary bridge components will be staged at the Muddy Creek Guard Station approximately 3.7 miles from Bridge #5, with limited to no cell phone service available at the work location.

Notice text

2 versions

Update #2 · Latest ·

09/10/2025:  AMENDMENT 0001 (A0001): Read the amendment in its entirety as it contains the Summary of Changes which includes the Attendee's List from the September 3, 2025, site visit along with answers to contractror's questions. The Amendment is located in the Attachments/Links. 

PROJECT:  West Muddy Creek Bridge #4 and Bridge #5  Replacement - Gunnison National Forest in Gunnison, Colorado.

Description: Project will restore access to NFSR 261 to accommodate highway loading vehicles (85,000 pound vehicle configurations) utilizing AASHTO LRFD RL-93 loadings. Work shall be performed as shown in the Project Drawings and specified in the Project Specifications for each bridge. Seet these documents in the Attachments/Links.

SITE VISIT:   There will be a site visit/conference held for this project on Wednesday, September 3, 2025, at 10:00 a.m. Mountain Time.  Site address located at 39°06'56.5"N 107°31'28.4"W or FS road 265 mile post 15.01 for the West Muddy Creek #4 and #5 Bridges Replacement Project in Gunnison CO. 

Contacts for Site Visit are: Patrick (Doug) Marah at patrick.marah@usda.gov or call (970)260-4761 or Daris Matos -Justiniano at daris.matos@usda.gov or call (970)964-8803. Call to schedule a site visit no later than September 2, 2025, at 1:00 p.m. Mountain Time.  Please note:  Limited to No Cell phone service is available on site. 

Update #1 ·

PROJECT:  West Muddy Creek Bridge #4 and Bridge #5  Replacement - Gunnison National Forest in Gunnison, Colorado.

Description: Project will restore access to NFSR 261 to accommodate highway loading vehicles (85,000 pound vehicle configurations) utilizing AASHTO LRFD RL-93 loadings. Work shall be performed as shown in the Project Drawings and specified in the Project Specifications for each bridge. Seet these documents in the Attachments/Links.

SITE VISIT:   There will be a site visit/conference held for this project on Wednesday, September 3, 2025, at 10:00 a.m. Mountain Time.  Site address located at 39°06'56.5"N 107°31'28.4"W or FS road 265 mile post 15.01 for the West Muddy Creek #4 and #5 Bridges Replacement Project in Gunnison CO. 

Contacts for Site Visit are: Patrick (Doug) Marah at patrick.marah@usda.gov or call (970)260-4761 or Daris Matos -Justiniano at daris.matos@usda.gov or call (970)964-8803. Call to schedule a site visit no later than September 2, 2025, at 1:00 p.m. Mountain Time.  Please note:  Limited to No Cell phone service is available on site. 

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
West muddy creek #5 bridge replacement Award Award Notice
West muddy creek #5 bridge replacement This notice · Latest solicitation Solicitation
West muddy creek #5 bridge replacement Original Pre-Solicitation