Water Treatment Facility
Closed Pre-Solicitation Posted
- Solicitation number
- 1149739
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Place of performance
- Monument, Colorado 80132, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Department of Agriculture Forest Service is seeking a contractor to install Optimal Corrosion Control Treatment (OCCT) equipment at the Monument Fire Center water treatment facility located near Monument, Colorado. The project requires the contractor to provide all labor, materials, equipment, and utilities necessary to install new treatment process equipment, including filter housings, baffle tanks, chemical feed pumps, monitoring instrumentation, valves, and piping, along with demolition of the existing treatment building and installation of electrical and HVAC systems. Key objectives include addressing soluble lead in the well water to comply with Colorado Department of Public Health and Environment regulations. The solicitation does not specify formal evaluation criteria in the pre-solicitation materials provided; however, contractors must demonstrate capability by submitting required documentation including company credentials, UEI, business size classification, and site visit attendance. Critical deadlines include a mandatory site visit on January 28, 2026, at 11:00 AM (confirmation required by 8:00 AM that day), a capability statement due within 15 days of the original notice (by February 7, 2026), and a formal solicitation expected to be released through SAM.gov with a current deadline of February 12, 2026.
This is a Total Small Business set-aside contract with an estimated value under $500,000. The Monument Fire Center serves the Pike Interagency Hotshot and Monument Helitack crews with a year-round staff ranging from 20 to 46 employees across seven buildings, utilizing a 600-foot-deep well with 10 gallons-per-minute production capacity feeding a 6,000-gallon storage tank. The project timeline runs from April 1, 2026, through August 31, 2026, with the Government providing the new water treatment building (anticipated completion by May 30, 2026) and utilities during construction. Contractors must designate a Project Manager and Project Superintendent as key personnel and must submit deliverables including a construction schedule, material and equipment submittals, quality control reports, an Operations & Maintenance manual, and as-built drawings. No incumbent contractor or previous award information is identified in the pre-solicitation materials; all response costs are the responsibility of interested vendors with no Government reimbursement provided.
Notice text
2 versions
Update #2 · Latest ·
This is a synopsis for The Monument Fire Center on the Pikes Peak Ranger District is located approximately 3 miles west of the Town of Monument, Colorado.
Update #1 ·
This is a synopsis for The Monument Fire Center on the Pikes Peak Ranger District is located approximately 3 miles west of the Town of Monument, Colorado.
Files
| File | Type | Posted |
|---|---|---|
| Amd_001_H20 Treatment Synopsis.docx | DOCX document | |
| A01_SOW_MFC Water Treatment_Rev2 12jAN26.docx | DOCX document | |
| H20 Treatment Synopsis.docx | DOCX document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| F103--Boiler Water Treatment Program | Veterans Integrated Service Network 12 | No set-aside | |
| FCC butner - water chemical testing and consultation services | BOP Field Acquisition Office | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity