H20 Treatment Synopsis.docx
DOCX document 18 KB Posted
- Attached to
- Water Treatment Facility
- Solicitation number
- 1149739
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a pre-solicitation synopsis for water treatment facility work at the Monument Fire Center on the Pikes Peak Ranger District in Monument, Colorado. The U.S. Department of Agriculture Forest Service is contemplating a single contract award for a total small business set-aside with an estimated value under $500,000. The Monument Fire Center serves as a permanent, year-round operational hub for the Pike Interagency Hotshot and Monument Helitack crews, with staffing ranging from 20 to 46 full-time employees including seasonals. The facility operates a public non-transient non-community (NTNC) water system classified as a Class B water treatment facility serving seven buildings including three bunkhouses, a three-story office building, a classroom building, a dwelling, and a helitack office. The estimated period of performance runs from April 1, 2026 through August 30, 2026.
Interested vendors must submit a capability statement within 15 days of this notice to Crystal Amos, the Contracting Officer, at crystal.amos@usda.gov. The capability statement must include company name, Unique Entity Identification (UEI), point of contact information, business address, email, phone number, and business size classification (Small Business, 8(a) Concern, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Business, HUBZone Small Business, Small Disadvantaged Business, or Women-Owned Small Business), along with UEI and SAM expiration date. A site visit will be held with details posted on SAM.gov; interested parties must email the Contracting Officer for specific details. The formal solicitation will be distributed through System Award Management (SAM.gov), and all information in this synopsis is subject to modification and does not constitute a binding commitment from the Government.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amd_001_H20 Treatment Synopsis.docx | DOCX document | |
| A01_SOW_MFC Water Treatment_Rev2 12jAN26.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. This is a synopsis for The Monument Fire Center on the Pikes Peak Ranger District is located approximately 3 miles west of the Town of Monument, Colorado.
a) The site address is: 3751 Mount Herman Road, Monument, CO 80132. The Government will not reimburse respondents for cost incurred or associated with responding to this notice. This is not a solicitation, nor is it a promise to issue a solicitation. All information in this notice is subject to modification and does not bind the Government.
If a solicitation is issued, it will be distributed via System Award Management, (SAM) at SAM.gov, and interested parties must comply with all solicitation terms and conditions.
2. NAICS CODE: 237110 – Water and Sewer Line and Related Structures Construction
3. Contract Type: The government is contemplating a single contract award
4. Synopsis Posting Period: 15 days.
5. Contracting Office Points of Contact: Crystal Amos, crystal.amos@usda.gov
6. Site Visit will be held, date and time will be posted via SAM.gov. Those interested, must email Contracting Officer for details.
7. Background and Description: The Monument Fire Center includes living and working facilities for the Pike Interagency Hotshot and Monument Helitack crews. The crews are national assets that respond to wildfires and provide support throughout the entire fire management process.
The center resides on a 1,000-acre compound on the Pike National Forest, located three miles west of Monument, Colorado, at an elevation of 7,256 feet. The site is staffed permanently year-round with the highest population potential over spring, summer, and fall. The site population varies during the year with a minimum of 20 permanent full-time employees to as many as 46 full-time employees including seasonals.
The distribution system serves seven buildings including Bunkhouses A, B, and C, a 3-Story Office Building, a Classroom Building, a Dwelling, and a Helitack Office. The water system is a public NTNC system (CDPHE Public Water System ID CO0321525) utilizing ground water and operated by a contracted operator. The water system is classified as a class “B” water treatment facility and the distribution system is a class “1” water distribution system.
8. Location: 3751 Mount Herman Road, Monument, CO 801328.
10. Estimated Period of Performance: 01 April 2026 – 30 August 2026. Disclosure of
11. Magnitude: less than $500,000
12. Type of Set-aside: Total small business set-aside.
13. Responses: Interested and capable sources are encouraged to respond to this synopsis with a Capability Statement.
Capability Statement must include:
Company Name, Unique Entity Identification, Point of Contact, Address, email, phone number and indicate business size, i.e., Small Business, 8(a) Concern, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Business, HUBZone Small Business, Small Disadvantaged Business, or Women-Owned Small Business, UEI and SAM expiration date.
Responses are due within 15 days of this notice and must be submitted to Contracting Officer, crystal.amos@usda.gov
File details come from the government source that posted it. Updated .