Water purification system

Closed Solicitation Posted

Solicitation number
NFFKF7002100444AG2
Agency
National Oceanic and Atmospheric Administration Department of Commerce
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
221310 Water Supply and Irrigation Systems
PSC
N046 Installation Of Equipment- Water Purification And Sewage Treatment Equipment
Place of performance
Pascagoula MS 39567 USA

Notice details come from SAM.gov. Updated .

Notice text

Contractor shall provide the following:

  • Quantity 1 - Water Purification System with the following Technical Specifications:
    • Produce type 1 - Ultrapure water for Liquid Chromatography/Triple Quadrupole- Mass Spectrometer (LC/QQQ-MS)  and Inductively Coupled Plasma Mass Spectrometer (ICP/MS) analyses, (18.2 mega-ohm purity)
    • Benchtop Unit
    • Maximum Dimensions:  600mm (height) x 350 mm (width) x 350 mm (depth)
    • Voltage Requirements: Input--AC 100 - 240 VAC, 50 - 60 Hz, 2.0 A Maximum Output--DC 24 V, 5.0 A Maximum 
    • Tank shall have a minimum capacity of  60L; Bacterial Content shall be: <0.01 CFU/mL, Feedwater Source: Tap Water, Flow Rate: Up to 1 L/min, and  produce 10 liter per minute minimum purified water
    • One-Year Warranty including all Parts and Labor
  • All attachments, accessories and a full starter kit of needed consumables shall be provided with the purchase of the Water Purification System; System must be Complete and ready to use upon installation
  • Delivery and installation of the Water purification system to the 2nd floor of the NOAA Pascagoula, MS Facility.
  • Installation Qualification/Operational Qualification (IQ/OQ) testing/diagnostics Service shall be provided and include a comprehensive document detailing all protocols successfully carried out to ensure the operational readiness of the platform for use 
  • One-day, on-site Water purification system Familiarization Training for two analysts. NISL may utilize a virtual environment so other NISL analysts can attend the training.
  • 4 option years Extended Preventative Maintenance that includes technical phone and email support during normal business hours; all Parts and Labor due to normal wear and usage and in accordance with Water Purification System manufacturers requirements.

Attachments

Files attached to this notice, newest first
File Type Posted
Statement of Work Water Purifier Final (2).docx DOCX document
Combined synopsis Water Purifier.docx DOCX document
Water Purifier SF 18 Quote Form.doc DOC document

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity