Wastewater manhole invert
Closed Solicitation Posted
- Solicitation number
- 51283PR250000020
- Agency
-
Coast Guard
Department of Homeland Security
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Place of performance
- New Haven, Connecticut 06512, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The United States Coast Guard (Department of Homeland Security) is soliciting proposals for wastewater manhole restoration services at the Sector Long Island Sound facility in New Haven, Connecticut. The contract requires a qualified contractor to rework and restore an existing manhole invert table, specifically addressing problematic wastewater line transitions and flow issues. Primary contract requirements include jet/vac waste removal, masonry invert table restoration, and conducting wastewater flow testing with flushing media. The solicitation was posted on February 21, 2025, with proposal responses due by March 5, 2025, giving potential bidders approximately two weeks to prepare and submit their documentation. Contractors will be evaluated based on their ability to complete the specialized infrastructure repair work within the specified parameters and technical requirements outlined in the Statement of Work.
The contract is not set aside for any specific business category and is open to qualified contractors in the Water and Sewer Line and Related Structures Construction (NAICS 237110) industry. The work must be completed within 30 calendar days, with performance limited to Monday through Friday between 8:00 AM and 4:30 PM, unless alternative hours are pre-approved. The specific performance location is 120 Woodward Ave, New Haven, CT 06512, where basic utilities like electrical outlets and water will be provided by the government. Contractors are responsible for bringing their own sanitation facilities, ensuring proper disposal services, and maintaining site cleanliness throughout the project. A one-year warranty is required on all work performed, which adds an additional quality assurance component to the contract requirements.
Notice text
2 versions
Update #2 · Latest ·
-
- SCOPE: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to rework and restore existing manhole invert table to correctly transition wastewater lines.
-
-
- Work shall include providing all transportation, materials, and labor. The awarded contractor shall complete the following:
-
- Jet/Vac waste and material from problematic manhole.
- Rework the existing manhole masonry invert table to permanently correct the newly installed 8" PVC sanitary line and all other line transition into the table.
- Conduct a wastewater flow test to include flushing media.
QUESTIONS RECEIVED / ANSWERED:
- Confirm the bid date and time listed above are unchanged. Closes on March 05 @ 12:00pm EST
- Construction cost estimate or a construction cost range for the project. Governments estimate is $10,000.00 – Proposals must include detailed costs for materials, labor, site conditions, contingencies, equipment.
- Plan holders’ list/bidders list Will be provided to all vendors upon award
- Have you issued an addenda? No addenda added
- When is the best time to follow up for bid results? An email will go out to all vendors that successfully submitted a quote once an award is made
Please make sure all quotes, evaluation criteria, meet the requirements per the SOW.
Update #1 ·
-
- SCOPE: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to rework and restore existing manhole invert table to correctly transition wastewater lines.
-
-
- Work shall include providing all transportation, materials, and labor. The awarded contractor shall complete the following:
-
- Jet/Vac waste and material from problematic manhole.
- Rework the existing manhole masonry invert table to permanently correct the newly installed 8" PVC sanitary line and all other line transition into the table.
- Conduct a wastewater flow test to include flushing media.
Files
| File | Type | Posted |
|---|---|---|
| STATEMENT OF WORK-SLIS Wastewater Manhole.docx | DOCX document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| H146--Hach Water Quality Monitoring Service | Veterans Integrated Service Network 1 | No set-aside | |
| HAVO 326181 Rehabilitate Rainshed&Water Treatment | National Office | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity