STATEMENT OF WORK-SLIS Wastewater Manhole.docx
DOCX document 3 MB Posted
- Attached to
- WASTEWATER MANHOLE INVERT
- Solicitation number
- 51283PR250000020
About this file
This Statement of Work outlines requirements for wastewater manhole restoration work at USCG Sector Long Island Sound in New Haven, CT. The contractor must rework and restore an existing manhole invert table to correctly transition wastewater lines, specifically addressing an eroded invert table causing improper waste media flow and backups.
The work includes jet/vac cleaning of the problematic manhole, reworking the masonry invert table to permanently correct an 8" PVC sanitary line transition, and conducting wastewater flow testing. The contract must be completed within 30 calendar days, with work performed Monday-Friday 8:00 AM to 4:30 PM unless otherwise approved. The contractor must provide their own sanitation facilities and disposal services, protect existing property, and maintain site cleanliness. Work location is 120 Woodward Ave, New Haven CT 06512, with basic utilities (electrical outlets and water) provided by the government. A one-year warranty is required on all work performed.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
USCG Sector Long Island Sound Wastewater Manhole Restoration
PR #
STATEMENT OF WORK
FOR
USCG Sector Long Island Sound Wastewater Manhole Restoration
GENERAL REQUIREMENTS
PART 1 – GENERAL
1.1 SCOPE: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to rework and restore existing manhole invert table to correctly transition wastewater lines.
1.1.1 Work shall include providing all transportation, materials, and labor. The awarded contractor shall complete the following:
· Jet/Vac waste and material from problematic manhole.
· Rework the existing manhole masonry invert table to permanently correct the newly installed 8" PVC sanitary line and all other line transition into the table.
· Conduct a wastewater flow test to include flushing media.
1.2 EXISTING CONDITIONS: Manhole invert table has eroded causing an abrasive surface which doesn’t allow waste media to properly flow leading to backups in unit water closets.
1.3 SITE VISITS: Bidders are strongly encouraged to inspect the site where work is to be performed to satisfy them regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Arrangements for such visits shall be made by contacting Quality Assurance Inspector (QAI) DCC Cameron Croteau. Any questions regarding this specification or the work shall be addressed in writing and directed to the Contracting Officer.
1.4 LOCATION: 120 Woodward Ave, New Haven CT 06512
1.5 HOURS OF WORK: Normal working hours for the contract are 8:00 A.M. to 4:30 P.M., Monday through Friday. If the Contractor desires to work other than normal duty hours, on weekends or federal holidays, he/she must request written permission from the QAI at least 24 hours in advance of such work and approval must be received prior to the requested work time.
1.6 COORDINATION OF CONTRACT WORK WITH GOVERNMENT WORK: The Government will continue to operate within its buildings and areas during the execution of the contract. The Government will keep interference with the Contractor’s operation to a minimum. The Contractor shall conduct his/her operations so as not to interfere with the Governments operation of the facility.
1.7 SANITATION FACILITIES: To be provided by the contractor.
1.8 ON SITE SUPERVISION. Prior to commencing work, the Contractor shall submit a letter to the QAI, designating an employee from his/her company as the foreman or supervisor. The supervisor shall be on site any time work is being performed. The supervisor shall be able to read, write, speak English, and have the authority to approve and accept delivery orders and minor (under $2000.00) modifications to delivery orders.
1.9 PROTECTION OF PROPERTY: The Contractor shall comply with the requirements of Paragraph 52.236-9 and 52.236-10 of the Federal Acquisition Regulation and the following: All existing grounds, fences, utilities, equipment, building components and adjacent property, including vehicles, shall be protected from any damage resulting from contract operations. Contractors will be responsible for any damage to Government property. Damaged property (done by the Contractor) shall be repaired by the Contractor, at Contractor’s expense, to meet previous existing conditions.
1.9.1 The Contractor shall take all necessary precautions to meet proper safety standards and regulations of the State and Federal Codes. OSHA regulations apply to all work performed on site. In addition, they shall conform to any restrictions as may be outlined by the Base Safety Officer and Fire Department during the contract.
1.10 DISPOSAL OF REMOVED MATERIALS: All material removed by the Contractor that is not indicated to be salvaged by the Government shall become the property of the Contractor. This material shall be disposed of legally off Coast Guard property. The Contractor shall not cause, suffer, or permit the handling, transportation, or storage of any material in a manner that result, or may result in emissions that cause or contribute to a condition of air pollution, any debris that could create air-borne dust must be shipped in a closed container or wet down and securely tarped over. The Contractor is responsible to comply with all applicable federal, state and local environmental and disposal regulations.
1.11 RESTORATION AND CLEAN UP: All areas disturbed by construction shall be restored to match the condition and material that existed prior to the start of work. The contractor shall keep the work areas always clean of trash and debris. The contractor shall not allow trash or debris to blow from the work area.
1.12 UTILTIES: Electrical 110/120 V outlets are available, contractor responsible for providing extension cords. Water can be supplied at request.
1.13 GOVERNMENT INSPECTION: The Contractor shall keep the QAI informed of contract operations and plans so that they may arrange to be present at the various times that work is being performed. Inspector must be present for operation testing and pressure testing.
1.14 DRAWINGS: See enclosures 1, 2 and 3 for existing manhole and area of work.
1.15 PERFORMANCE PERIOD: All work under this contract including site cleanup, punch list, acceptance by the QAI and required submittals shall be completed within 30 calendar days of issuance of the contract by the Contracting Officer unless stated otherwise.
1.16 WARRANTY: The provisions of the entire warranty clause from paragraph 52.246-21 (April 84) and Federal Acquisition Regulation are incorporated into this contract. The clause is written, in part, as follows:
“In addition to any other warranties set out elsewhere in this contract, the Contractor shall warrant that work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material, or design furnished or workmanship performed by the Contractor or any of his subcontractors or suppliers at any tier. Such warranty shall continue for a period of one year from the date of final acceptance of the work.”
POC’s
Sector SLIS Asst. Facilities Eng DCC Cameron Croteau 207-650-5108
Enclosure 1
Enclosure 2
Enclosure 3 image2.png image3.png image4.png image5.png image6.png image7.png image8.png image9.png image1.jpg image2.jpeg image10.png image1.png