Warren Township Wetland Reserve Program (WRP) Restoration Project, Waushara County, WI.
Award Notice Posted
- Solicitation number
- AG-5F48-S-15-0013
- Agency
-
National Resources Conservation Service
Department of Agriculture
- Awarded
- to Wondra Construction Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- AG5F48P150025 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- Waushara County, Wisconsin, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Warren Township Wetland Reserve Program (WRP) Restoration Project, Waushara County, WI.
**START DATE FOR PROJECTS IS CONTINGENT UPON SITE CONDITIONS AND RECEIPT OF PERMITS. NRCS HAS APPLIED FOR ALL NEEDED PERMITS**
The Warren Township Wetlands Reserve Easement (WRE) Restoration Project consists of restoring a drained and degraded former wetland.
PROJECT PERIOD OF PERFORMANCE: 49 calendar days.
SITE SHOWING: A site showing will be conducted Tuesday, 5/19/15, at 2 pm CST.
Meet at T18N R12E Section 8. The site is within the city limits of Redgranite. Access to site is a private driveway off Bonnell Avenue. Site entrance is a grass field road. See Attachment 3, Site Map.
In order to be considered for award, a firm must submit the following:
• Solicitation, Offer, and Award, Standard Form 1442 (one original signed copy), pages 1 and 2, with blocks 14 through 20 completed
• Completed Section B - Price Schedule.
Electronically complete Representations, Certifications, and Other Statements of Quoters, electronically at the SAM website, https://www.sam.gov.
Emailed submissions ARE acceptable.
Due date for quotes is extended from Thursday 5/28/15, 2pm CST to Thursday 6/4/15, 2pm CST.
Note #4 on Sheet 4 of 15 of Attachment 2, Warren Township Plans, should read as follows:
4. Silt fence shall be installed prior to embankment construction and shall be placed within one foot of the edge of the existing ditch. The outside toe of the embankment shall begin at the silt fence. The new embankment shall be constructed on top of the existing spoil left over from the initial ditch creation. Silt fence shall be installed on embankment #1 from stations 9+00 through 14+65 and on embankment #2 from stations 0+00 through 20+00 and stations 24+50 through 27+80.
Amendment 2:
EXTENDS THE DUE DATE FOR QUOTES from Thursday, 6/4/15, 2pm CST to Monday, 6/8/15, 2pm CST.
Updates Period of Performance from 35 calendar days to 49 calendar days.
Provides an updated Price Schedule that adds Line Item 009 for Dewatering, lump sum. If site conditions do not require dewatering, Line Item 009 will not be paid.
Provides updated Special Construction Provisions under Attachment 1, Specifications, to add De-Watering.
Provides updated Plans, Attachment 2, to address De-Watering.
Update #2 ·
Due date for quotes is extended from Thursday 5/28/15, 2pm CST to Thursday 6/4/15, 2pm CST.
Note #4 on Sheet 4 of 15 of Attachment 2, Warren Township Plans, should read as follows:
4. Silt fence shall be installed prior to embankment construction and shall be placed within one foot of the edge of the existing ditch. The outside toe of the embankment shall begin at the silt fence. The new embankment shall be constructed on top of the existing spoil left over from the initial ditch creation. Silt fence shall be installed on embankment #1 from stations 9+00 through 14+65 and on embankment #2 from stations 0+00 through 20+00 and stations 24+50 through 27+80.
Update #1 ·
Warren Township Wetland Reserve Program (WRP) Restoration Project, Waushara County, WI.
**START DATE FOR PROJECTS IS CONTINGENT UPON SITE CONDITIONS AND RECEIPT OF PERMITS. NRCS HAS APPLIED FOR ALL NEEDED PERMITS**
The Warren Township Wetlands Reserve Easement (WRE) Restoration Project consists of restoring a drained and degraded former wetland.
PROJECT PERIOD OF PERFORMANCE: 35 calendar days.
SITE SHOWING: A site showing will be conducted Tuesday, 5/19/15, at 2 pm CST.
Meet at T18N R12E Section 8. The site is within the city limits of Redgranite. Access to site is a private driveway off Bonnell Avenue. Site entrance is a grass field road. See Attachment 3, Site Map.
In order to be considered for award, a firm must submit the following:
• Solicitation, Offer, and Award, Standard Form 1442 (one original signed copy), pages 1 and 2, with blocks 14 through 20 completed
• Completed Section B - Price Schedule.
Electronically complete Representations, Certifications, and Other Statements of Quoters, electronically at the SAM website, https://www.sam.gov.
Emailed submissions ARE acceptable.
Files
| File | Type | Posted |
|---|---|---|
| SF-30_Amendment_2_signed.pdf | ||
| SECTION_B_-_Amendment_2.docx | DOCX document | |
| Att_2_Plans_add_dewatering.pdf | ||
| Att_1_Specs_add_dewatering.doc | DOC document | |
| SF-30_Amendment_1_signed.pdf | ||
| Page_2.pdf | ||
| Att_3_Site_Map.pdf | ||
| Att_2_Warren_Township_Plans.pdf | ||
| Att_1_Warren_Township_Specs.pdf | ||
| SF-1442_Warren.pdf | ||
| Att_5_-_OSHA_1910_1926.docx | DOCX document | |
| Att_4_WDOL_WI150015_4-10-15.pdf | ||
| Solicitation_AG-5F48-S-15-0013.docx | DOCX document |
Show all 13
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity