Page_2.pdf
PDF 37 KB Posted
- Solicitation number
- AG-5F48-S-15-0013
About this file
Page 2 of Amendment 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF-30_Amendment_2_signed.pdf | ||
| Att_1_Specs_add_dewatering.doc | DOC document | |
| SECTION_B_-_Amendment_2.docx | DOCX document | |
| Att_2_Plans_add_dewatering.pdf | ||
| SF-30_Amendment_1_signed.pdf | ||
| Att_5_-_OSHA_1910_1926.docx | DOCX document | |
| Att_4_WDOL_WI150015_4-10-15.pdf | ||
| Att_1_Warren_Township_Specs.pdf | ||
| Att_3_Site_Map.pdf | ||
| Att_2_Warren_Township_Plans.pdf | ||
| SF-1442_Warren.pdf | ||
| Solicitation_AG-5F48-S-15-0013.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 1
SOLICITATION #AG-5F48-S-15-0013
WARREN TOWNSHIP WRP RESTORATION PROJECT
WAUSHARA COUNTY, WISCONSIN
Note #4 on Sheet 4 of 15 of Attachment 2, Warren Township Plans, should read as follows:
4. Silt fence shall be installed prior to embankment construction and shall be placed within one foot of the edge of the existing ditch. The outside toe of the embankment shall begin at the silt fence. The new embankment shall be constructed on top of the existing spoil left over from the initial ditch creation. Silt fence shall be installed on embankment #1 from stations 9+00 through 14+65 and on embankment #2 from stations 0+00 through 20+00 and stations 24+50 through 27+80.
| WARREN TOWNSHIP WRP RESTORATION PROJECT |
| WAUSHARA COUNTY, WISCONSIN |