About this file

Page 2 of Amendment 1

View the file

Other files

File Type Posted
SF-30_Amendment_2_signed.pdf PDF
Att_1_Specs_add_dewatering.doc DOC document
SECTION_B_-_Amendment_2.docx DOCX document
Att_2_Plans_add_dewatering.pdf PDF
SF-30_Amendment_1_signed.pdf PDF
Att_5_-_OSHA_1910_1926.docx DOCX document
Att_4_WDOL_WI150015_4-10-15.pdf PDF
Att_1_Warren_Township_Specs.pdf PDF
Att_3_Site_Map.pdf PDF
Att_2_Warren_Township_Plans.pdf PDF
SF-1442_Warren.pdf PDF
Solicitation_AG-5F48-S-15-0013.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 1

SOLICITATION #AG-5F48-S-15-0013

WARREN TOWNSHIP WRP RESTORATION PROJECT

WAUSHARA COUNTY, WISCONSIN

Note #4 on Sheet 4 of 15 of Attachment 2, Warren Township Plans, should read as follows:

4. Silt fence shall be installed prior to embankment construction and shall be placed within one foot of the edge of the existing ditch. The outside toe of the embankment shall begin at the silt fence. The new embankment shall be constructed on top of the existing spoil left over from the initial ditch creation. Silt fence shall be installed on embankment #1 from stations 9+00 through 14+65 and on embankment #2 from stations 0+00 through 20+00 and stations 24+50 through 27+80.

WARREN TOWNSHIP WRP RESTORATION PROJECT
WAUSHARA COUNTY, WISCONSIN