SECTION_B_-_Amendment_2.docx

DOCX document 16 KB Posted

Attached to
Warren Township Wetland Reserve Program (WRP) Restoration Project, Waushara County, WI.
Solicitation number
AG-5F48-S-15-0013
Issued by

About this file

Updated Section B Price Schedule to add Line Item 009 for Dewatering **use this updated Price Schedule to submit quote**

View the file

Other files

File Type Posted
SF-30_Amendment_2_signed.pdf PDF
Att_1_Specs_add_dewatering.doc DOC document
Att_2_Plans_add_dewatering.pdf PDF
SF-30_Amendment_1_signed.pdf PDF
Page_2.pdf PDF
Att_5_-_OSHA_1910_1926.docx DOCX document
Att_4_WDOL_WI150015_4-10-15.pdf PDF
Att_1_Warren_Township_Specs.pdf PDF
Att_3_Site_Map.pdf PDF
Att_2_Warren_Township_Plans.pdf PDF
SF-1442_Warren.pdf PDF
Solicitation_AG-5F48-S-15-0013.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B – SUPPLIES OR SERVICES AND PRICES

WARREN TOWNSHIP WRP RESTORATION PROJECT – WAUSHARA COUNTY

PRICE SCHEDULE

***AMENDMENT 2***

Line Item No.
Description
Quantity
Unit Of

Measure

Unit Price
Total Price

Mobilization/Demobilization

1
LUMP SUM
$ XXXXX
002
Water Control Structure/Pipe/Trash Rack/Animal Guard Installed
1
LUMP SUM
$ XXXXX
003
Excavation Sump Pump Removal
1
LUMP SUM
$ XXXXX
004
Organic Fill for Embankments
1
LUMP SUM
$ XXXXX
005
Excavation Tile Removal
300
LIN. FT
006
Construction Site Pollution Control – Silt Fence
2,845
LIN. FT
007
Seeding
3.1
ACRES
008
Mulch
3.1
ACRES
009
Dewatering – if needed**
1
LUMP SUM
$ XXXXX

Total Project Price

**IF SITE CONDITIONS DO NOT REQUIRE DEWATERING, THIS LINE ITEM WILL NOT BE PAID.**

AG-5F48-S-15-0013 Page 4 Warren Township WRP - Waushara