WAPA- Sierra Nevada Region Substation Service Upgrade Construction Project
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 89503120BWA000022
- Agency
-
Western Area Power Administration
Department of Energy
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237130 Power and Communication Line and Related Structures Construction
- PSC
- Y1NZ Construction Of Other Utilities
- Place of performance
- Ca Usa
Notice details come from SAM.gov. Updated .
About this opportunity
This competitive solicitation is seeking bids for construction services to upgrade station service equipment at three substations located near Byron, Cottonwood, and Livermore, California. The Western Area Power Administration will remove existing unit substations and install new pad-mounted transformers, automatic transfer switches, distribution panels and associated components. The solicitation is a 100% small business set-aside conducted according to FAR Subparts 14 and 36 and is seeking a firm-fixed price contract. Interested parties can access solicitation documents on SAM.gov beginning March 30, 2020. Questions are due by the specified date and bids are due on the specified date in hard copy with no electronic submissions accepted.
The NAICS code designated is 237130 for electrical contractors with a $39.5 million size standard. The estimated value of the contract is between $2.5 million to $5 million. Work will be performed near the three specified locations in California over the period of performance. The solicitation includes specifications and drawings for upgrades to equipment at the Byron, Cottonwood, Livermore, and Olinda substations.
Notice text
This is a competitive 100% Small Business Set-aside Invitation for Bid (IFB). The acquisition is subject to the North American Industry Classification System (NAICS) code of 237130 with a size standard of $39.5 million. This acquisition will be handled as an IFB prepared in accordance with Federal Acquisition Regulation (FAR) Subparts 14 and 36. A firm-fixed price contract award is contemplated. The project magnitude is estimated between to $2,500,000 and $5,000,000. Place of performance will be near three separate locations: Byron, Cottonwood, and Livermore, CA.
The purpose of this project is to remove existing unit substation DZC, DZA, DZB and pad mount transformers, install multiple pad mount transformers, automatic transfer switches, main distribution panels and associated station service equipment. Also, installation of 230kV bay including disconnect switch, government furnished SSVT’s and associated material and equipment at three WAPA substations (Livermore, Olinda and Tracy Substations).
The solicitation, specifications and drawings, and any subsequent amendments will only be available in electronic format, downloadable from the internet free of charge. No CD-ROMS or hardcopy documents will be distributed. Interested parties can download the solicitation at http://www.beta.sam.gov on or about March 30, 2020.
Any questions shall be submitted in writing to Western Area Power Administration, Attn: Tim Modjeski, Contract Specialist, P.O. Box 6457, Phoenix, AZ 85005 or email to modjeski@wapa.gov referencing the solicitation number in the subject line. No phone calls will be accepted. All responsible sources may submit a bid, which will be considered by the agency. Note: Any prospective contractor must be registered in the System for Award Management (SAM) in order to be eligible for award. To obtain information on completing your SAM registration and/or obtaining a DUNS number go to the following website: www.beta.sam.gov. Ensure your Online Representations and Certifications is completed and current in SAM. It is important to read the solicitation COMPLETELY as there are DATES that MUST be met. Bids will NOT be accepted by telegraphic, facsimile or electronic commerce.
Files
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| WAPA- Sierra Nevada Region Substation Service Upgrade Construction Project | Award Notice | |
| WAPA- Sierra Nevada Region Substation Service Upgrade Construction Project | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| LB Lateral Water Line and Facilities Replacement for Wastewater System | — | No set-aside | |
| Folsom Dam Electronic Access Control and Surveillance (EACSS) Fiber Backbone Up | — | Service-Disabled Veteran-Owned Small Business | |
| Forest Service - Solar Batteries Frenchman Work Center | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity