This document contains an invitation for bid for a federal construction project. The Western Area Power Administration is soliciting bids to upgrade station service at three substations near Byron, Cottonwood, and Livermore, California on a firm-fixed price contract. Work includes replacing transformers and switchgear, installing automatic transfer switches and distribution panels, upgrading structures and cable, and adding a 230kV bay. The estimated value is between $2.5 million and $5 million. The solicitation is a 100% small business set-aside for NAICS code 237130 with a size standard of $39.5 million. The bid schedule specifies line items for various work elements at each substation. Interested parties can access solicitation documents on March 30, 2020 on SAM.gov. Questions must be submitted in writing by the specified date. Bids are due by the response date listed and must be submitted in hard copy with no electronic submissions accepted.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION B
SUPPLIES OR SERVICES AND PRICES
BIDDING SCHEDULE
WAPA Sierra Nevada Region Station Service Upgrades Project
PART A: TRACY SUBSTATION, STATION SERVICE UPGRADES
CLIN Work or Material Estimated Quantity Unit Unit Price Amount
0001T Mobilization and preparatory work LS $ _
0002T Miscellaneous sitework LS $ _
0003T Demolition LS $ _
0004T Concrete foundations 49.6 CY $ $ _
0005T Cable Trench LS $ _
0006T Concrete encasement LS $ _
0007T Steel structures, welded (galvanized) 2788 LB $ $ _
0008T Modifying steel structures 30 LB
0009T Free-standing automatic transfer switch, 480V, 1200 amps, three-phase
2 EA $ $ _
0010T Station service transformers 4 EA $ $ _
0011T 1/0 AWG, 25-kV, insulated copper cable 3600 LF $ $ _
0012T 1/0 AWG, 35-kV, insulated copper cable 2700 LF $ $ _
0013T Safety Switches 4 EA $ $ _
0014T Shielded insulated conductors LS $ $ _
89503120BWA000022
Attachment A
0015T Outdoor AC main distribution panelboard 2 EA $ $ _
0016T Furnishing 12/C No. 10 AWG control cable 2500 LF $ $ _
0017T Furnishing RS-485 communication cable 1100 LF $ $ _
0018T Installing 12/C No. 10 AWG control cable 2500 LF $ $ _
0019T Installing RS-485 communication cable 1100 LF $ $ _
0020T Associated electrical equipment and material LS $ $ _
0021T Existing outdoor electrical equipment and material
LS $ $ _
PART A TOTAL $ _
PART B: LAWRENCE LIVERMORE SUBSTATION, STATION SERVICE UPGRADES
CLIN Work or Material
Quantity Unit Unit Price Amount
0001L Mobilization and preparatory work LS $ _
0002L Miscellaneous sitework LS $ _
0003L Demolition LS $ _
0004L Concrete foundations 27 CY $ $ _
0005L Cable trench LS $ _
0006L Concrete encasement LS $ _
0007L Steel structures, welded (galvanized) 1564 LB $ $ _
0008L Automatic transfer switch, 240V, 600 amps, three phase
1 EA $ $ _
89503120BWA000022
0009L Station service transformers 2 EA $ $ _
0010L 1/0 AWG, 25-kV, insulated copper cable 360 LF $ $ _
0011L Safety Switches 2 EA $ $ _
0012L Insulated conductors LS $ $ _
0013L Outdoor AC main distribution panelboard 2 EA $ $ _
0014L Furnishing RS-485 communication cable 250 LF $ $ _
0015L Installing RS-485 communication cable 250 LF $ $ _
0016L Associated electrical equipment and material LS $ $ _
0017L Existing outdoor electrical equipment and material
LS $ $ _
PART B TOTAL $ _
PART C: OLINDA SUBSTATION, STATION SERVICE UPGRADES
CLIN Work or Material Estimated Quantity Unit Unit Price Amount
0001D Mobilization and preparatory work LS $ _
0002D Miscellaneous sitework LS $ _
0003D Demolition LS $ _
0004D Concrete foundations 73.7 CY $ $ _
0005D Cable trench LS $ _
0006D Concrete pull boxes LS $ _
89503120BWA000022
0007D Concrete encasement LS $ _
0008D Steel structures, welded (galvanized) 9328 LB $ $ _
0009D Station service voltage transformer, 230-kV, 333 kVA (Government furnished)
3 EA $ $ _
0010D Motor-operated disconnecting switch 230kV, 2,000 amps with whips
1 EA $ $ _
0011D Free-standing automatic transfer switch, 480V, 1200 amps, three-phase
1 EA $ $ _
0012D Station service transformer 1 EA $ $ _
0013D Temporary 1/0 AWG, 35-kV, insulated copper cable
450' LF $ $ _
0014D 1/0 AWG, 35-kV, insulated copper cable 450' LF $ $ _
0015D Safety Switches 3 EA $ $ _
0016D Shielded 500MCM 600V Insulated conductors LS $ $ _
0017D Shielded insulated conductors LS $ $ _
0018D Outdoor AC main distribution panelboard 1 EA $ $ _
0019D Furnishing 12/C No. 10 AWG control cable 1000 LF $ $ _
0020D Furnishing 2/C No. 6 AWG control cable 500 LF $ $ _
0021D Furnishing RS-485 communication cable 450 LF $ $ _
0022D Installing 12/C No. 10 AWG control cable 1000 LF $ $ _
0023D Installing 2/C No. 6 AWG control cable 500 LF $ $ _
0024D Installing RS-485 communication cable 450 LF $ $ _
89503120BWA000022
0025D Associated electrical equipment and material LS $ $ _
0026D Existing outdoor electrical equipment and material
LS $ $ _
PART C TOTAL $ _
PART A TOTAL $ _
PART B TOTAL $ _
PART C TOTAL $ _
TOTAL FOR PARTS A, B, & C $ _
ABBREVIATIONS
CLIN = Contract Line Item Number
CY = cubic yards EA = each LF = linear feet LS = for the lump sum of LB = pounds
89503120BWA000022
Bid Schedule
File details come from the government source that posted it. Updated .