WA FLAP JEFFER 134309(2), Two Trout Creek Culvert Replacement

Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
69056725B000014
Agency
Responses due
Not on record
Set-aside
Total Small Business

Opportunity facts

Place of performance
Forks, Washington, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Highway Administration intends to solicit construction of an Aquatic Organism Passage culvert replacement in Jefferson County, Washington, with solicitation anticipated in Fall/Winter 2025 and completion targeted for Winter 2026. The procurement is set aside for total small business. Work is located approximately 16 miles south of Forks on Oil City Road at milepost 0.5 in a tributary to the Hoh River. The estimated price range is $2,000,000 to $5,000,000. The scope includes removing a failing corrugated metal culvert that blocks fish passage and installing a new precast reinforced concrete box culvert (18 feet span, 12 feet rise) spanning approximately 0.1 miles. Work encompasses earthwork (clearing, grubbing, excavation), installation of 1,200 linear feet of silt fence and 2,600 linear feet of fiber roll, 52 linear feet of reinforced concrete box culvert, 200 linear feet of guardrail, stream diversion, fish passage boulders, in-stream logs for habitat improvement, streambed material placement, vegetation restoration using native species, and temporary traffic control. The design incorporates environmental mitigation strategies including sediment retention sills, rock weirs, and erosion control measures. The project uses FP-24 specifications and US Customary Units. Prospective bidders should monitor SAM.gov for the exact solicitation release date and may direct technical questions to wfl.plansspec@dot.gov or general inquiries to wfl.contracts@dot.gov or 360-619-7520. Preliminary plans are available.

Notice text

WA FLAP JEFFER 134309(2), Two Trout Creek Culvert Replacement

Jefferson County, Washington State

This work consists of constructing an Aquatic Organism Passage (AOP) Culvert at Oil City Road MP 0.5 to replace a failing culvert that blocks fish passage in a tributary to the Hoh River.

Project Location: This project is located approximately 16 Miles South of Forks city, Jefferson County, Washington State.

Project Length: 0.1 Miles

Estimated Price Range: Between $2,000,000 and $5,000,000

Tentative Solicitation Date: Fall/Winter 2025

Tentative Fixed Completion Date: Winter 2026

See Attachments for additional information.

Files

Notice history

Notice Type Posted
WA FLAP JEFFER 134309(2), Two Trout Creek Culvert Replacement Award Award Notice
WA FLAP JEFFER 134309(2), Two Trout Creek Culvert Replacement Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8 Forks, Washington, United States · NAICS 237310 Federal Highway Administration No set-aside
WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4 Port Angeles, Washington, United States · NAICS 237310 Federal Highway Administration Total Small Business
YELL 338223 - Bridge Preservation NAICS 237310 — No set-aside
FY26 Clouter Creek Middle and Highway Cell Diking Charleston, SC 29403 · NAICS 237990 ENDIST Charleston Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors