This is a preliminary design document for the Two Trout Creek Culvert Replacement project in Jefferson County, Washington, prepared by the Federal Highway Administration's Western Federal Lands Highway Division. The project involves replacing an existing culvert on Highway 101 with a new precast reinforced concrete box culvert measuring 18 feet in span and 12 feet in rise, spanning approximately 0.095 miles. The project includes comprehensive environmental mitigation strategies such as stream diversion, sediment retention sills, rock weirs, log barriers, and vegetation restoration using native willow, cottonwood, and other tree species.

Key technical elements include temporary stream diversion, installation of fish passage boulders, streambed sediment placement, and environmental design features like root wad log barriers. The design incorporates guardrail installations, roadway aggregate base, and erosion control measures. The project will require careful management of existing trees, with specific guidelines for tree removal and replanting. Traffic control will be implemented using standard federal highway temporary traffic control protocols, including advanced warning signs and single-lane closure layouts. The preliminary design is marked as "NOT FOR CONSTRUCTION" and will require further review and approval before implementation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PARK

NATIONAL

CASCADES

NORTH

u n d o S t e g u

P

P A

C I F I C

O C

A E

N tS raitof Juan de Fuca

OC

LU

MBIA

R

IV

ER

A S N

KE

R

VERI

M

COLU B

I A

V R I

E R

Lakes

Banks

Lakes

Moses

Reservoir

Potholes

PARK

NATIONAL

OLYMPIC

N.P.

RAINIER

MOUNT

MON.

NAT'L VOLC.

ST. HELENS

MOUNT

BELLINGHAM

Forks

Aberdeen

Chehalis

Longview

OLYMPIA

TACOMA

SEATTLE

EVERETT

Wenatchee

Lake

Moses

SPOKANE

Pullman

Pasco

RICHLAND

Kennewick Walla Walla

ANGELES

PORT

Townsend

Port Vernon

Mt.

VANCOUVER

WASHINGTON KEY MAP

YAKIMA

BRITISH COLUMBIA

I D

A H

O

OREGON

UNITED STATES

CANADA

R

E N

O R

A I

N

N

ST F

R

I

D

D E P A

T

NTOFT A SP

T T

O

U

TE

ATESO

AM

E R

IC

A

M

P R

E L

IM

IN

A R

Y

N

101PROJECT LOCATION

Project Location

FORKS

PARK

NATIONAL

OLYMPIC

RESERVATION

INDIAN

QUILEUTE

RESERVATION

INDIAN

HOH

OCEAN

PACIFIC

PARK

NATIONAL

OLYMPIC

JEFFERSON CO.

CLALLAM CO.

Quill ayu te

Riv er

Hoh R iv er

O il

C ity R oa d

STATE PARK

BOGACHIEL

See Sheet A.3

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

CULVERT REPLACEMENT

TWO TROUT CREEK

WA FLAP JEFFER 134309(2)

PLANS FOR PROPOSED PROJECT

WASHINGTON

JEFFERSON COUNTY

LENGTH 0.095 MILES

TYPE OF CONSTRUCTION:

DESIGN DESIGNATION:

SPECIFICATION:

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

VANCOUVER, WASHINGTON

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PLANS PREPARED BY

Box Culvert Installation on Federal Highway Projects, FP-24

Construction of Roads and Bridges

Standard Specifications for

N/Ae (max)

30 MPHV

250ADT (2046)

200ADT (2026)

PROJECT MANAGER

J. DAVIS

Scale in miles

1 10 2 3

APPROVED:

Western Federal Lands Highway Division

Chief of Engineering, DATE

Two Trout Creek

:0

P

M

J u n e

T it le

V ic in it y

T it le V ic in it y

S h e e t] c p w w o r k

\d

\T it le S h e e t.

d g n

PROJECT

NUMBER

SHEET

WA FLAP JEFFER 134309(2) A.1

PRELIMINARY - NOT FOR CONSTRUCTION

BH TP

CUYD

culv.

CUFT

cubic yard(s) culvert cubic foot (feet) mon.

min.

MGAL

max.

matl.

M.P.

M.L.

monument minimum thousand gallon maximum material mile post main line

W

RIP

DI

G W G WV

CP GPS

36 31

36 31

N

E

N 1000

TP

SEC.

SEC.

θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.

AH

ADT

abut.

between bearing bridge balance point bench mark back face back btwn brg.

br.

BP

BM

b.f.

BK

ctrs.

CS

cont.

constr. jt.

conn.

conc.

col.

CMP

clr.

cc or c. to c.

centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center

NO SCALE

NOTE:

1.

on the appropriate plan sheet.

Other symbols used in the plans will be shown in a legend

W west drwg(s).

dist.

diaph.

dia.

DHV

D exp. jt.

exc.

EW

EQ or eq.

EOP

emb.

elev.

El. 94.16 e.f.

e E expansion joint excavation edge of water equation edge of pavement embankment elevation elevation in feet each face superelevation rate east drawing(s) distance diaphragm diameter design hourly volume diameter galv.

ga.

galvanized gage (gauge) jt.

IE

ID

joint invert elevation inside diameter ftg.

flg.

fin.

f.f.

footing flange finish front face

LW

lt. or LT Ls

LPSM

long.

LNFT

lat.

L low water left length of spiral lump sum longitudinal linear foot (feet) latitude length of curve rte.

rt. or RT reqd.

reinf.

rdwy.

R/W R.

R route right required reinforcement roadway right-of-way range radius typ.

Ts

TS

thd.

TBM

T.

T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance

VPI

vph V vertical point of intersection vehicles per hour design speed (velocity)

STS

struc.

stiff.

stgr.

std.

STA, Sta.

ST

SS

SRS

SQYD

SQFT

spa.

SLRY

shldr.

sect.

SC

SADT

S point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south

KSI

square inch thousand pounds per pvmt.

PT

PST

PSC

PSI

PSF

PS

POT

POS

POC

pl.

PI

PCS

PCC

PC

pavement point of tangent point of spiral to tangent point of spiral to curve pounds per square inch pounds per square foot point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve

OHWM

OG

OD

o. to o.

o.c.

ordinary high water mark original ground outside diameter out to out on center

NC

N normal crown north

A A

DI

National Boundary

State Boundary

County Boundary

City Boundary

Township or Range Line

Section Line

Section Corner (Found, Projected)

Control Point (Terrestrial and GPS)

Gas & Water Meter; Gas & Water Valve

Flagpole; Fire Hydrant

Cooking Grate; Garbage Can; Picnic Table

Boulder; Well; Antenna; Grave

Above Ground Tank; Underground Tank

Spot Elevation; Coordinate Grid Tick

Material Source; Bore Hole; Test Pit

Treeline; Individual Trees

Spring or Seep

Section Line 4

Section Corner (Found, Projected) 4

Section Line 16

Section Corner (Found, Projected)16

Property Line

Parcel Number

National Park Boundary

National Forest Boundary

National Wildlife Refuge Boundary

BLM Lands Boundary

Indian Reservation Boundary

Existing Roadway (Paved, Gravel)

Railroad

Trail

Fiber Roll

Silt Fence

Sandbag

Intermittent Drainage or Small Creek

Large Creek or River

Lake, Pond or Reservoir; Marshland

North Arrow

Slope Stake Limits Top of Cut

Toe of Fill

Construction Limits

Bottom of Ditch

Fence

Gate with Fence

Cattleguard

Guardrail

Concrete Barrier and Guard Wall

Retaining Wall wall face

Signs (single, double post; portable)

Delineators

Pipe Culvert (arrow shows flow)

Pipe Culvert with End Section

Pipe Culvert with Headwall

Pipe Culvert with Drop Inlet

Box Culvert

Underdrain

Overhead/Above Ground Utilities

Underground Utilities

Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features

Building

Right-of-Way Line

Permanent Easement

Construction Easement

Riprap

- no symbol -

Section A-A

EXISTING PROPOSED

STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, TP = telephone pedestal, TV = CATV pedestal,

- no symbol -

ABBREVIATIONS

PLAN SYMBOLS AND

101-1W

FP-14

6/2022

WFLHD DETAIL

:4

J u n e

D e t W

-1 p w

-w o rk \d

\W

-1

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

NUMBER

PRELIMINARY - NOT FOR CONSTRUCTION

N

END PROJECT

BEGIN PROJECT

8+00

3+00

DAOR YTIC

LI

O k e er C t uo rT o wT

H oh R iv er to F o r k s m ile s

A b e rd e e n m il e s t o

O il C it y T ra il h e a d m il e s t o

E= 798,095.8852

N= 312,094.5819

E= 797,847.1855

N= 311,665.6155

:3

A

M a r c h

V ic in it y

M a p p w w o r k \d

\V ic in it y M a p .d g n

VICINITY MAP

PROJECT

NUMBER

WA FLAP JEFFER 134309(2) A.3

PRELIMINARY - N

OT FOR CONSTRUCTION

Profile grade

12-inch compacted depth

Roadway Aggregate, method 2, LC

Existing ground

Stabilization Geotexile

10'

0.25 D

C o n s tr u c ti o n l im it

D

D

C o n s tr u c ti o n l im it

0.25 D

Existing ground C o n s tr u c ti o n l im it

See Fill Slope Rounding

Existing groundC o n s tr u c ti o n l im it

See Fill Slope Rounding

See Fill Slope Rounding

C o n s tr u c ti o n l im it

See Cut Slope Rounding

C o n s tr u c ti o n

L im it

Tur f es tabl ishment limi ts

Tu rf e sta blish ment limits

2'2'

Varies (1:4 to 1:2)

4+90 to 6+40, RT4+90 to 6+40, LT

2' 2'

Va rie s

(1 :4 to :2

3+00 to 8+00

"MAIN 01"

3% Crown3% Crown

Existing ground

5' 5'

CUT SLOPE ROUNDING

Existing ground

5'5'

FILL SLOPE ROUNDING

Turf establishment limits

Turf establishment limits

NOTE:

1.Construct slopes per cross sections.

Slope stake limitSlope stake limit

:3

J u n e

T y p ic a l

S e c ti n p w w o r k \d

\t y p ic a l-s e c ti o n .d g n

TYPICAL SECTION

PROJECT

C.1

WA FLAP JEFFER 134309(2)

Var iabl e (1 :6 t o 1:

2)

Va ria ble (1 :6 to :2

1:41:4

Shoulder

2'

Traveled lane

11'

Traveled lane

11'

Shoulder

2'

STATE PLANE COORDINATES GEO COORDINATES

POINT

NUMBER NORTH EAST ORTHOMETRIC

ELEVATION LATITUDE LONGITUDE ELLIPSOID

HEIGHT

COMBINED

FACTOR DESCRIPTION NOTE:

10 311721.901 797890.073 249.552 47°48'11.158310"N 124°15'46.134286"W 174.7417 0.999948924 kpff hub and nail 1.

11 311351.812 797669.966 234.618 47°48'07.412645"N 124°15'49.113823"W 159.7855 0.999949738 kpff hub and nail

22001 314094.451 799223.194 410.966 47°48'35.136121"N 124°15'28.170982"W 336.2974 0.999940579 5/8"ir w/fhwa alum cap

22002 313989.097 799185.720 415.224 47°48'34.080932"N 124°15'28.650795"W 340.5502 0.999940403 5/8"ir w/fhwa alum cap

22003 313787.395 799217.165 411.047 47°48'32.106058"N 124°15'28.059109"W 336.3679 0.999940654 5/8"ir w/fhwa alum cap

22004 313607.156 799085.807 390.577 47°48'30.271320"N 124°15'29.864182"W 315.8861 0.99994168 5/8"ir w/fhwa alum cap

22005 313376.192 798773.344 370.444 47°48'27.856911"N 124°15'34.286743"W 295.7317 0.999942706 5/8"ir w/fhwa alum cap

22006 312798.471 798559.608 330.867 47°48'22.066988"N 124°15'37.038134"W 256.1259 0.999944749 5/8"ir w/fhwa alum cap

22007 312621.378 798196.908 307.795 47°48'20.161561"N 124°15'42.230772"W 233.0287 0.999945902 5/8"ir w/fhwa alum cap

22008 312118.404 798126.957 279.483 47°48'15.171756"N 124°15'42.926338"W 204.6966 0.999947387 5/8"ir w/fhwa alum cap

22009 311925.833 797996.827 262.663 47°48'13.215905"N 124°15'44.705084"W 187.8643 0.999948243 5/8"ir w/fhwa alum cap

TROUT1 310831.051 797471.351 225.960 47°48'02.190867"N 124°15'51.680365"W 151.1013 0.999950292 5/8"ir w/fhwa alum cap

TROUT2 310431.612 797200.474 224.331 47°47'58.133448"N 124°15'55.383413"W 149.4469 0.999950479 5/8"ir w/fhwa alum cap

COORDINATE SYSTEM : Washington North SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18

EPOCH DATE : 2010.000

CADD SYSTEM COORDINATE SYSTEM : WA83/2011-NF NSRS11(NAD83/2011) Washington, North Zone, US Foot

PROJECT : Two Trout Creek Culvert Replacement DATE OF FIELD WORK :Multiple entries

PROJECT UNITS : US SURVEY FOOT

-F eb -2

:1

A M

C

U se rs \a da m

.d av ie s\

D oc um en ts \P ro je ct s_

\W as hi ng to n\

Tw o

Tr ou t\

PW

Tw o_ Tr ou t_ co nt ro ls he et

.x ls x] S he et

To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.

PROJECT

D.1WA FLAP JEFFER 134309(2)

SHEET

NUMBER

SURVEY CONTROLPRELIMINARY - N

N31°34'26"E

PI 2+76.92

Δ = 01°09'45" (LT)

R = 1,500.00' T = 15.22' L = 30.44' e = N/A

PI 8+70.35

Δ = 28°46'09" (LT)

R = 760.00' T = 194.92' L = 381.61' e = N/A

P C

.7

P T

.1

6 7 8

N32°44'11"E N02° 48'

17" E

P C

.4

P T

.0

P O

E

332500TP332550

CP

CP

5/8"IR W/FHWA ALUM CAP22009

TPTP

CP

5/8"IR W

/FHWA ALUM CAP

22008

N

BEGIN PROJECT

END PROJECT

See Section F for details and terminals Install guardrail work descriptions details See Section I work descriptions details See Sheet E.3 for

Profile grade

See Section G for details Install precast box culvert

(optional pump method, as needed) Temporary dam for stream diversion

2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50

238 238

240 240

242 242

244 244

246 246

248 248

250 250

252 252

254 254

256 256

258 258

260 260

262 262

264 264

266 266

268 268

270 270

272 272

274 274

276 276

278 278

280 280

282 282

284 284

286 286

288 288

290 290

+4.86

+8.7 6%

+0.62%

.0

.8

.0

.4

.0

.9

.0

.9

SSD = 213'

K = 20

160' VC

HLSD = 1310'

K = 74

150' VC

HLSD = 184'

K = 26

100' VC

HLSD = 124'

K = 18

150' VC

3+000 "Main-01"

8+000 "Main-01"

E = 797,843.6595 N = 311,663.7431

E = 798,95.8824 N = 312,094.5749

:2

J u n e

M a in

P la n

S h e p w

-w o rk

\d \P la n a n d P ro fi le

.d g n

PROJECT

D.3

6 7

N

Existing index contour

Construction limit

Finished surface contour

Install silt fence

Install fiber roll

Install check dam (fiber roll)

:3

M a r c h

M a in

P la n

S h e p w w o r k \d

\P la n .d g n

EROSION CONTROL

PLAN

PROJECT

E.2 m in

4'-6" min.

6" (min.) freeboard. Submit temporary stream diversion m in

NO SCALE

Existing ground

Water surface elevation

OPTION B

OPTION A

Sandbag (typ.)

Sandbag (typ.)

Portable water bladder

Water surface elevation

Existing abutment or pier elevation (min.)

Top of berm

Existing ground at time of construction

Diverted water level

Limit of work zone at time of construction

Diverted water level

(anchoring method to be approved)

Waterproof membrane stream flow side of diversion berm.

Impervious sheeting. Place on elevation (min.)

Top of berm manufacturer's recommendations.

handling bags. Fill and place per

Machine-placed large material temporary diversion berm.

extent practicable when placing existing streambed material to the

Minimize leveling or trenching of sandbags (as needed)

Hand-placed streambed grade

Existing elevation

Water surface

OPTION C

NOTE:

4.

3.

2.

1.

membrane

Waterproof height of the sandbag barrier.

directed. Remove sediment when deposits reach half the berm daily. Repair as needed after rainfall events or as

While in use, inspect and maintain the temporary diversion given time.

Place a maximum of one diversion in the stream at any upper rows of sandbags above the joints in lower rows.

of bottom rows as there are vertical course. Overlap the

Place sandbags to form a pyramid by laying equal numbers plans for approval prior to installation.

minimum height equal to the water surface elevation with

As a minimum, provide a temporary diversion berm with a prefabricated or portable diversion berms, dams, etc.).

methods may be chosen (including any approved during construction operations. Alternate stream diversion

These options suggest configurations for diverting a stream

:4 a r c h

P r im a r y A li g n m e n t2

P la n

S h e p w w o r k

\d

\T e m p o r a r y

D iv e r s io n B e r m

M e th o d s .d g n

METHODS

TEMPORARY DIVERSION BERM

PROJECT

E.3

NO SCALE

POST AND GEOTEXTILE INSTALLATION DETAIL

SILT FENCE INSTALLATION AT TOE OF FILL

Fi ll slo pe

T o e o f s lo p e

PLAN

ELEVATION

4.

3.

2.

1.

T o e o f s lo p e

Fi ll sl op e

ELEVATION

PLAN

PLAN

PLAN

END DETAIL

END POSTS DETAIL

POSTS AT JOINTS

Varies

Varies

Geotextile

Steel or wood post

Backfilled and compacted soil f o r s p a c in g

S e e N o te

Limits of clearing

(undisturbed)

Existing ground

Silt fence reinforcement

NOTE:

Staple or tie

Section B

Geotextile fabric, Tie top of posts together driven tightly together.

Steel or wood posts

Steel or wood post

Staple or tie

Geotextile fabric

Fasten fabric to posts around each post one full turn.

Fold geotextile fabric See Note 3

End Posts Detail

End posts, see

End Posts Detail

End posts, see

See Note 3 fabric, Section A

Geotextile

Flow

Flow

Flow running around the ends.

Curve ends of silt fence upgrade to prevent water from as possible.

Install silt fence to follow the ground contours as closely does not slide down, supporting posts.

All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.

as long as specified dimensions are satisfied. Follow

Alternate preassembled silt fence options will be allowed m in m in m in

6-foot (max.) spacing without silt fence reinforcement.

10-foot (max.) spacing with silt fence reinforcement.

4" min.

6" min. trench

DETAIL APPROVED FOR USE 10/2016

REVISED:

157-1W

WFLHD DETAIL

SILT FENCE8

:3

A

M

F e b r u a r y

D e t

W c p w w o r k

\d

\W

.d g n

DETAIL

OFFICE OF FEDERAL LANDS HIGHWAY

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

PROJECT

Se e N ote

6%

5%

4%

3%

2%

NO SCALE

6%

5%

4%

3%

2%

5%

4%

3%

2%

7.

6.

5.

4.

3.

2.

1.

Adjust check dam spacing based on site-specific conditions.

around the ends of the fiber roll.

Provide sufficient length to prevent water from flowing

Drive stakes into undisturbed soil of trench bottom.

stakes. Drive stakes at each end of the fiber roll and at

Install check dams in ditches perpendicular to the flowline.

installation.

Repair all rills or gullies and properly compact prior to functional requirements of the check dam device.

gravel bags as approved by the CO, to meet the

Construct check dams from fiber rolls, filter rock, or

MODERATE GRADES

CHECK DAM

CROSS SECTION

V-DITCH

CROSS SECTION

FLAT-BOTTOM DTICH

CROSS SECTION

CROSS SECTION

STAKING DETAIL

FIBER ROLL

PLAN

are similar for flat-bottom ditches

Check dam installation details

V-ditch design shown.

Flow line

GRADE

DITCH

(See Note 7)

CHECK DAM SPACING*

GRAVEL BAG

Gravel bag the ends. See Note 6 to prevent flow around

Curve ends upstream

Filter rock

Filter rock

FIBER ROLL CHECK DAM

GRAVEL BAG CHECK DAM

SPACING (max.)

CHECK DAM

See Note 5

NOTE:

GRADE

DITCH

SPACING (max.)

CHECK DAM

(See Note 7)

CHECK DAM SPACING

FILTER ROCK

GRADE

DITCH

(See Note 7)

CHECK DAM SPACING*

FIBER ROLL

SPACING (max.)

CHECK DAM

FILTER ROCK CHECK DAM

uphill side of fiber roll trench material on

Place excavated

Flow

F lo w on ditch grades steeper than 5%.

Do not use fiber roll check dams

* Spacing calculated based on on ditch grades steeper than 6%.

* Do not use gravel bag check dams

(FT)

(FT)

(FT)

Trench 2" (min.)

m in

Fiber roll 9" Ø (min.)

Trench 2" (min.)

-inch wood 8 1-inch x 18

1Stake fiber rolls in place with 1

Expose stakes 2-inches (min.) above top of fiber roll.

2-foot (max.) spacing.

m in

"6 m in m in .6

9" Ø minimum fiber roll.

DETAIL APPROVED FOR USE 7/2016

REVISED:

157-15W

WFLHD DETAIL

:4

F e b r u a r y

D e t

W p w w o r k

\d

\W

.d g n

DETAIL

OFFICE OF FEDERAL LANDS HIGHWAY

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

PROJECT

Spacing Slope

STAKES REQUIRED

1:1

1:2

1:3

1:4 or flatter for each roll

Stakes required

FIBER ROLL SPACING

Fiber roll length

Fl ow

T o e o f fi ll s lo p e

ELEVATION

PLAN

disturbed areas

Runoff from

INSTALLATION BEYOND TOE OF SLOPE

INSTALLATION ALONG SLOPES

FIBER ROLL STAKING DETAIL

PROPERLY STAKED AND ENTRENCHED FIBER ROLL

Existing ground (typ.)

Fiber roll

Flow direction

Slope

Direction ofrunoff from disturbed areas sp ac in g ch ar t

S ee

Fi be r

R ol l

Fiber roll ff o n ur f o n oi t c er i

D along contours

Install fiber rolls

Fiber roll

Slope

Fi ll slo pe

Direction of runoff ground

Existing soil to match ground level

Backfilled and compacted

Flow larger than fiber roll wood stakes. See Note 2.

Pay lim its

Pay lim its

SLOPE PROTECTION INSTALLATION

ALTERNATE FIBER ROLL JOINT DETAIL

FIBER ROLL LAPPING DETAIL

on uphill side of fiber roll

Place excavated materialStagger joints (typ.)

2.

1.

permanent installations. Do not crush fiber roll while staking.

roll is secure to slope. Live stakes may be used for and install fiber rolls

Step 1: Excavate trench Step 2: Backfill soil against fiber rolls

FIBER ROLL

(FT)

(FT)

2" (min.) Excavate trench 2"

1" x 1" or 1" Ø ove rlap

12" (m in.)

t o m in m in

1" x 1" Wood stake as specified in plans

3' min. or

3' (min.)

Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.

6-inches from fiber roll end angles towards the adjacent

Overlap fiber rolls 12-inch minimum. Drive stakes at

NOTE:

WFLHD DETAIL

DETAIL APPROVED FOR USE 10/2014

7/2016REVISED:

157-21W

:2

A

M

F e b r u a r y

D e t

W c p w w o r k

\d

\W

.d g n

DETAIL

OFFICE OF FEDERAL LANDS HIGHWAY

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

PROJECT

Flow

Use sandbags to construct temporary barrier w

SECTION A-A

Plastic liner

Silt fence (typ.

when scheduled) w

Bury plastic liner 6" deep and secure with sandbags (typ.)

SECTION B-B

PROJECT

NOTE:

1. See Erosion Control Section for temporary culvert diameter, riprap class, channel dimensions and quantities.

2. Use plastic liner or riprap along the entire length and width of the temporary diversion channel.

3. Construct channel at a minimum grade of 0.5 percent.

4. Do not construct with longitudinal joints if using a plastic liner. Bury the upstream edge of the liner a minimum of 6" deep and secure with riprap or sandbags.

5. When specified replace the portion of the diversion channel through the roadway embankment with temporary culvert. Compact temporary culvert backfill using one of the methods listed in Subsection 204.ll(a).

6. Provide geotextile filter conforming to Subsection 714.0l(c).

SHEET

NUMBER

PLASTIC LINED DIVERSION CHANNEL

See Note 5 X I {X

I I X I

------ ------ ..______ I xi ..______ '--- I 'x L\ '�--

Silt fence (typ. A \ when scheduled) � '� �

Permanent culvert

Roadway centerline

-- � Earthwork limits

Riprap lining

Temporary diversion channel with plastic liner or riprap

Permanent natural channel

PLAN

Use sandbags to prevent backf/ow into natural channel

DIVERSION CHANNEL

w

SECTION A-A

Silt fence (typ.

when scheduled)

Sandbags

Geotextile filter Riprap lining

SECTION B-B

RIPRAP LINED DIVERSION CHANNEL

Subgrade Temporary culvert backfill

. . . . . � � -;-;- way

. --:-:- ..... _ ent

Roaaway · : --:-:-emb mi�7'\'<lll:0Yll7:@/ tSYli7'w !�7'\ '<II !S'07/7'\'<i &W/1'0:< Natural ground

SECTION B-B

TEMPORARY CULVERT

NO SCALE

Geotextile filter

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

OFFICE OF FEDERAL LANDS HIGHWAY

TEMPORARY STREAM

DIVERSION CHANNELS

FLH STANDARD

628-1

SPECIFICATION

FP-24

APPROVED FOR USE

1/2024

Compacted native soil

Erosion control blanket

Erosion control blanket

Compacted native soil

Erosion control blanket

12" spacing

12" spacing

6" x 6" Trench

6" x 6" Trench

NOTE:

Overlap in the direction of the prevailing wind.

recommendations.

Install fasteners according to the manufacturer's

2.

1.

Se e

Not e

Pr ev ai lin g wi nd

AT TOP OF SLOPE

ANCHOR TRENCH

DETAIL A

AT TOE OF SLOPE

ANCHOR TRENCH

DETAIL B

SHINGLE SPLICE

DETAIL C

PERSPECTIVE VIEW

Fasteners @

Fastener

Fastener

Flow

Fastener (typ)

Fasteners @

Toe of slope of slope. See Detail A

Anchor trench at top

Slope stake

Blanket edge

Shingle splice. See Detail C edge overlap of slope. See Detail B

Anchor trench at toe

Blanket ends

S ee N ote 1

Fasten er sp acin g

6"

6"

3'

' m

ax. c to c

4" min.

overlap

6" m in.

12" max. c to c

12" max. c to c

12" max. c to c

PRODUCT ON SLOPES

ROLLED EROSION CONTROL

629-1W

FP-24

8/2024

WFL STANDARD

:4

F e b r u a r y

S td W p w w o r k

\d

\W

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

6.

5.

4.

3.

2.

1.

embankment

Edge of widened post section. See Note 4 face of the rail in the standard

Tangent line projected from the embankment

Edge of widened post section. See Note 4 face of the rail in the standard

Tangent line projected from the

Varies by manufacturer end of terminal not shown.

Terminal posts and

Varies by manufacturer end of terminal not shown.

Terminal posts and terminal grading extents where practical.

Construct a 1V:4H slope outside of the guardrail terminal.

Install a reflectorized object marker on the end of the according to the manufacturer's recommendations.

end farther from the edge of shoulder, or use a taper

Install terminal at a 1:25 taper or flatter to position the the manufacturer's recommendations.

necessary to install the tangent terminal according to manufacturer for a specific product. Adjust grading as begin at post 3. Verify the length of need with the

For design purposes, the length of need is assumed to of site limitations, use the alternative grading layout.

as practical within site constraints. If necessary because are provided, use the preferred grading layout as much staking notes or model. If no staking notes or model

Construct the terminal grading layout as shown in the other details.

recommendations. See manufacturer's drawings for

Install tangent terminal according to the manufacturer's

See Note 6

Guardrail terminal grading o r f la tt e r

V

:1 H

Front of rail face

PLAN

PREFERRED GRADING

Post section

Standard

L

See Note 6

Guardrail terminal grading o r f la tt e r

V

:1

H

Hinge point line

See Note 3

Length of Need

Guardrail system

Pay limits

Pay limits terminal system type tangent or type MGS tangent

Back of post

Back of post

Front of rail face

Hinge point line

PLAN

ALTERNATIVE GRADING

post section

Standard

L

Guardrail system

Pay limits

Pay limits terminal system type tangent or type MGS tangent

See Note 3

Length of Need

12'-6"

(min.)

10'-0" m in m in m in

12'-6" m in

TEST LEVEL

L

NOTE:

NO SCALE

50 (for MGS)

37.5 or 50 (for G4)

(FT)

3 (> 45 mph)

2 (≤ 45 mph)

AND GRADING

TYPE TANGENT TERMINAL

W-BEAM GUARDRAIL

MGS AND G4

617-20

1/2024

FLH STANDARD

:4

J u ly

S td

-2 p w

-w o rk

\d \S td -2

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

guardrail post bolt

3" x 4" (min.)

Post spacing 6'-3""2

3'-1 fill slope

Variable

TOP

symmetry of�

FRONTSIDE SIDE

TOP

PLAN VIEW

BLOCKOUT

steeper than fill slope Variable slope but not

W beam rail

(See Note 2) Blockout on terminal systems All posts except those

DETAIL

POST AND BLOCKOUT

4.

3.

2.

1.

SHAPE POST

STRUCTURAL

Note 4 See terminal systems approach and departure Widening required for Subgrade shoulder.

TYPICAL GUARDRAIL ELEVATION

OMITTED POST DETAIL

See Note 1

POST FACE

terminal systems approach and departure Widening required for Subgrade shoulder.

Hinge point Hinge point

1V:2H or flatter slope shown on Typical Section Aggregate base or as groundline at face of rail Edge of pavement or

1V:10H or flatter slope blockout (typ.)

Post and rail as applicable ground line at face of Edge of pavement or splice Mid-span

Lap in direction of traffic

See Note 2

See Note 2

TYPICAL GUARDRAIL CROSS SECTION TYPICAL GUARDRAIL CROSS SECTION

s t le n g th

P o s t le n g th

GUARDRAIL MOUNT

FLEXIBLE DELINEATOR

1V:10H or flatter slope groundline at face of rail Edge of pavement or shown on Typical Section Aggregate base or as terminal systems approach and departure Widening required for Subgrade shoulder.

1V:2H or flatter slope

Hinge point shown on Typical Section Aggregate base or as

1V:10H or flatter slope

TYPICAL GUARDRAIL CROSS SECTION

manufacturer's recommendations.

an adhesive or mechanical means according to the Fasten delineator to the web of the steel post using either Install a flexible hinged delineator every fourth post.

manufacturing practices.

part, including its appearance, and accepted to be those consistent with the proper functioning of the Dimensional tolerances not shown or implied are intended consistent material throughout the length of guardrail run.

may be wood, plastic, or composite material. Use Size of blockout shown elsewhere in the plans. Blockout guardrail post and the hinge point. For all other locations, be omitted in locations where the typical guardrail cross When encountering impenetrable material, one post may

Traffic

(one omitted post) Unsupported span

(max.)

Note 2 See

N o te

S e e sheeting Retroreflective

Note 2

See bolts and nuts (8 per splice)

" x 10" or 14" guardrail bolt8

(ty p.)

6"

8" or 12"

(t y p

" dia. (typ.)4

" plain round washer.4

" recess nut8

6"

"4

" dia.4

W6 x 9 or W6 x 8.5

8" or 12"

"4 o r

6"

"4

5" (max.)

see Section 617 and Standard 617-13 or 617-37.

section includes 2-feet (min.) between the back of the

8" or 12" blockout

6' Post 8' Post

8" blockout

8' POST ON SLOPE, 8" BLOCKOUT6' POST CENTERED ON HINGE, 8" OR 12" BLOCKOUT

56'-3" (min.) Distance between omitted posts

43'-9" (min.)

12'-6"

6' Post

6' POST, 8" OR 12" BLOCKOUT

(typ.)

2'-0"

8" or 12" blockout

(t y p

" x 10" or 14"8

" guardrail splice4 1" x 18

NOTE:

NO SCALE STEEL POSTS

MGS W-BEAM GUARDRAIL

617-32

2/2024

:4

J u ly

S td

-3 p w

-w o rk

\d \S td -3

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

SPAN WITH HEADWALL DETAIL

WOOD POST DETAIL STEEL POST DETAIL CRT POST DETAIL

PLAN

ELEVATION

Finished grade

PLAN VIEW

See Note 1

POST AND

BURIED OBSTRUCTION

BURIED OBSTRUCTION

See Note 3 See Note 3

Hinge point line

Rail splice (typ.)

(no nesting required)

Single W-beam rail element

Slope varies

Slope varies

Slope varies the face of the headwall flush (zero offset) with

Back of post may be See Note 4

Headwall the face of the headwall flush (zero offset) with

Back of post may be

Hinge point line

CRT WOOD POST

FRONT SIDE

TOP

the maximum height of the culvert headwall above the the finished grade to act as a vertical roadway curb, In locations where the culvert headwall extends above upstream and downstream of posts 2 and 7 is

The minimum length of guardrail, including the end terminals, Use wood posts for CRT posts.

Posts 1 and 8 may be wood or steel.

5.

4.

3.

2.

1.

See Note 1

POST AND

See Note 2

POST THRU

12" (min.)12" (min.)

8"

24"

6"

24"

12"

8"

24" hole (typ.)

" dia.2

8"

" dia.4

6"

6"

See Standard 617-31 or 617-32 for other assembly details.

finished grade is 2 inches.

62.5 feet.

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

2 3 4 5 6 7 8

8 1 8 2 7

NO SCALE

NOTE:or 25'-0" (3 omitted posts)

18'-9" (2 omitted posts)

6'-3"

LONG-SPAN SYSTEM

MGS W-BEAM GUARDRAIL

617-37

FP-24, FP-14

1/2024

:2

J u ly

S td p w w o r k

\d

\S td

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

110 100 90 80 70 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 11060

OUTLETINLETPIPEHYDRAULIC INFORMATION

LENGTH: 52 ft

PIPE SLOPE: 0.61 ft/ft

HEADWALL: Concrete

FLOWLINE SLOPE: 0.61 ft/ft

Q : 32.7 CFS

Q : 62.6 CFS

BANKFULL CHANNEL WIDTH: 12.0 ft

TYPE: Concrete Box

SPAN: 18 ft RISE: 12 ft

LOWER BEVEL HEIGHT: LOWER BEVEL HEIGHT:

BEVEL:

HEADWALL: Concrete

BEVEL:

Q : 78.4 CFS

INV N/E/EL: 241.73' 238.54'INV N/E/EL:

WALL THICKNESS: NA

HW : 247.95 feet

N

OHW : 247.41 feet

BURIAL DEPTH: 5.0 ft BURIAL DEPTH: 5.0 ft

Offset 57.26 RT

5+57.04

E 798026.43

N 311852.74

End channel grading

PLAN AND PROFILE

TWO TROUT CREEK CULVERT

G.1

PROJECT

NUMBER

SHEET

WA FLAP JEFFER 134309(2)

A O

P S h e t p w w o r k

\d

\w a a je f f e r

A

O P

P la n

S h e e t.

d g n :5

J u n e

Offset 25.23 LT

5+69.03

E 797962.38

N 311906.16

Existing ground detail Sheet G.2material per

Backfill with streambed

16.8' spacing per detail sheet G.3

Install sediment retention sill at

Channel elev. 246.73'

Channel elev. 243.54' per detail sheet G.4

Install rock weirs at 16.8' spacing

5+65.35

N 797982.07

E 311889.86centerline

New culvert

48" culverts

Remove existing

:1

Two Trout Creek

Flow

SCALE IN FEET

10 0 10 20 30 40

Proposed roadway alignment

Proposed edge of pavement

LC

52'

Concrete headwall

Concrete wingwall (typ.)

1'

Proposed roadway

16.8'

Begin channel grading

End channel grading

Existing edge of gravel

Construction limits

Offset 65.7 LT

6+01.50

E 797934.20

N 311961.60

Begin channel grading

Offset 26.19 RT

5+61.55

E 798002.31

N 311872.85

Slope 6.1% box culvert (18' span, 12' rise)

Precast reinforced concrete

Temporary stream diversion stream diversion

Temporary

Existing top of bank contours (typ.)

Finished grade

Existing toe of slope

Existing contours (typ.)

3' width, 3' thick

Placed riprap, class 3

.7 class 3

Placed riprap, 3'

Varies

(Typical) Wingwall riprap detail

SECTION A-A

PLAN

NOTE:

FOOTNOTE:

3.

2.

1.

Pipe arch culvert

W

Streambed sediment

Streambed cobble

Pipe arch culvert wall

Box culvert wall

Stagger in-channel fish passage boulders within the culvert span.

gradations (647.07 and 703.21(e)).

streambed cobble (703.21(e)), and bank stone (703.21(d)), See special contract requirements for streambed sediment and wash in fines as specified in special contract requirements.

Mix streambed cobbles evenly throughout streambed sediment

Channel flowline

Streambed sedimentRound pipe culvert wall Streambed top

Round culvert

B D

Culvert wall

LC

Flow

BB

A

W

X (typ.)

where specified on plan per detail Sheet G.3

Sediment retention sill on plan where specified detail Sheet G.4

Rock weir per culvert boulder within

Fish passage where specified on plan per detail Sheet G.3

Sediment retention sill specified on plan boulder where

Fish passage

NO SCALE

Streambed Material.

Infill informational quantities are incidental to ITEM 64704-1000 [4] dimension.

smallest 4 3 Embed fish passage boulders within active channel [3] sediment where listed in the infill quantities table.

Construct well defined banks with bank stone and streambed[2] parabolic shape.

Slope streambed aggregate towards flowline to ensure[1]

[1]Channel flowline

[2]Bank stone

[2]Bank stone

A Flow

SECTION B-B

(typ.)

36" min.

Streambed cobble

Culvert outlet where specified on plan per detail Sheet G.3

Sediment retention sill

[3]within culvert

Fish passage boulder

Streambed sediment X (typ.)

plan sheet or Length on

4' match rock weir spacing

Stagger fish boulders each side and

LC

specified on plan

Sheet G.4 where

Rock weir per detail outlet

Culvert

LOCATION

(FT)

X

(CUYD)

COBBLE

STREAMBED

(CUYD)

SEDIMENT

STREAMBED

(CUYD)

STONE

BANK

GRADATION

COBBLE

STREAMBED

(FT)

W

MITIGATION

FISH PASSAGE BOULDER

(IN)

DIA. NO.

[4]STREAMBED MATERIAL

TWO TROUT CREEK 16.8 12 24 3D

(IN)

BD

d e p th

B u r ia l

B u r ia l d e p th

BD/3

3% (typ.)

Slope

145 145 15

:1

J u n e

D e s ig n S u r v

F p w w o r k

\d

\w a a je f f e r

A

O P

D e ta il

S h e e ts

.d g n

TREATMENT

STREAM CULVERT

SIMULATED

PROJECT

WA FLAP JEFFER 134309(2) G.2

B

H

CROSS-SECTION

PRECAST BOX CULVERT

SEDIMENT RETENTION SILLS

LC

DETAIL

CONCRETE SILL

X

Flow retention sill

Top of sediment

2 - #5

12"

1 row alternate sides

2 - #5

1" threaded inserts (typ.)

#5 @ 1'-6" with inserts (typ.)

1" threaded

1" threaded inserts (typ.)

c l.

2" cl.

D

V a r ie s

D

LOCATION (IN)

B

(IN)

H

(NO.)

Min.

SRS

(FT)

Max.

X

MITIGATION

SEDIMENT RETENTION SILLS (SRS)

locating SRS in corrugation valleys or away from plate seems.

X dimension may be varied +/- 6-inches as needed for

Apply two coats zinc paint to all welds.

Hot dip galvanized baffles and gussets.

3.

2.

1.

TWO TROUT CREEK 3 18 24 16.8

Minor Concrete

:2

J u n e

D e s ig n S u r v p w w o r k \d

\w a a je f f e r A

O P

D e ta il S h e e ts

.d g n

DETAILS

SEDIMENT RETENTION SILL

CULVERT

PROJECT

G.3

Flow lo wA

A

(in)

DIAMETER

FOOTER ROCK

TOP ROCK AND

(no.)

QUANTITY

ROCK WEIR

MITIGATION

ROCK WEIR

(ft)

B

(ft)

[5] Z

(ft)

W

LOCATION

ELEVATION

PLAN

SECTION A-A

NO SCALE

FOOTNOTE:

parameter Z.

Outside of culvert, weirs should be u-shaped as specified by

Align footer rocks flush against bed retention sills inside culvert. [5] and stable foundation for the top rocks.

Place footer rocks close together to create a tightly packed[4] streambed material.

Fill voids in top rock and footer rock with specified[3]

Space top rocks in center 1/3 only.[2]

Orient top rocks to deflect water towards center of stream.[1]

[4] [3]Footer rock

Z

D o w n s tr e a m f r o m c o n tr o l)

Top rock

Bottom of channel

Bottom of channel

[4] [3]Footer rock high water level

Ordinary normal low flow

Edge of water

Control point

[2] [1] [2] [1]

[2]

[3] [2]Top rock

[2]

[2] [2] [2]

[2] streambed material elevation or top of

Original streambed

[4] [3]Footer rock

[3]Top rock water level

Ordinary high

BWB

B W3

W 3

W3

B

W3

TWO TROUT CREEK 12 3 7 5

:1

J u n e

D e s ig n S u r v p w w o r k

\d

\w a a je f f e r

A

O P

D e ta il

S h e e ts

.d g n

DETAIL

ROCK WEIR

PROJECT

G.4

CONNECTION PLATE DETAIL

plate assembly

Welded connection

Headed Stud culvert concrete

Precast and wingwall joint wrap along culvert

Grout and mastic wingwall

Concrete

Geotechnical Memorandum 1024.

or geotechnical information seeF

EOTECHNICAL INFORMATION:G

Nominal bearing resistance: 4.0 ksf.

Unit weight: 125 lbs/cu. ft.

SOIL:

of any bar shall be 2-inches.

(ASTM, A615) grade 60. The minimum concrete cover to the face

Provide reinforcing steel conforming to AASHTO M31, deformed

REINFORCING STEEL:

-inch.4 compressive strength f'c=4500 psi. Chamfer all exposed edges

Provide structural concrete, class A(AE) with minimum 28-day design

CONCRETE:

HL-93.

LIVE LOAD:

Concrete: 150 lb per cubic foot.

DEAD LOAD:

the CO. See Section 104.

grades shown in the plans and provide shop drawings for review by walls conforming to ASTM-C1577 and to the dimensions, lines, and

Provide precast concrete box culvert, headwalls, wingwalls, and cut-off of Roads and Bridges on Federal Highway Projects, FP-24 (U.S. Customary).

Federal Highway Administration Standard Specifications for Construction

Detail is for general information only.

CONSTRUCTION:

(t y p

PLAN

Box invert

Bottom of Box

10'-0"10'-0"

Top headwall

Box crown

BOX CULVERT

(per manufacturer)

Wire mesh along both sides (typ.)

" Bevel2

" x 22

2 along both sides

" Bevel2

" x 22

10" min.

10" min. base slab

Bottom of Cut-off Wall sections (typ.)

manufacturer between precast

Install tie rods or connector plates per

NO SCALE

SECTION A-A SECTION B-B

precast sections (typ.)

manufacturer between connector plates per

Install tie rods or manufacturer

Weep holes per

12" depth material, Bedding install connector plates per manufacturer along culvert and wingwall joint (typ.), and

Water tight grout and mastic wrap per manufacturer (4' min.)

Watertight box joint spacing

A

A

B

B plates (typ.)

connection

Embedded

52'-0"

12" depth

Bedding material, 5'-0"

:5

J u n e

B o x

C u lv e r p w w o r k

\d

\w a a je f f e r

A

O P

P la n

S h e e t.

d g n

SHEET 1 OF 2

STRUCTURE DETAILS

BOX CULVERT

PROJECT

G.5

3.

2.

1.

1.5 inches or greater than 2.0-inches.

concrete cover over the reinforcing steel shall not be less than reinforcing meeting the requirements of AASHTO LRFD Section 5.

Reinforcing for headwall and cutoff walls shall be welded wire recommendations.

Dowels shall be installed in accordance with the manufacturers

Fill dowel holes with polymer mortar.

12"

15°

WATERTIGHT BOX JOINT SECTION

R is e

DETAIL

HEADWALL AND CUTOFF WALL

Headwall (per precast culvert manufacturer)

Headwall (per precast culvert manufacturer) precast culvert manufacturer)

Cutoff wall (per

R is e

SECTION PROFILE

V a r ie s

1'-0" long spaced 3'-0" max.

3" dia. holes with No. 8 dowels

1'-0" long spaced 3'-0" max.

3" dia. holes with No. 4 dowels

1'-0" long spaced 3'-0" max.

3" dia. holes with No. 4 dowels

1'-0" long spaced 3'-0" max.

3" dia. holes with No. 8 dowels

2'-6" max.

Bedding material, 12" depth

Cutoff wall (per precast culvert manufacturer)

"2

4"8 ref.

rope " mastic 4

" gap2

Non-shrink grout

"4

4 " ref.8 top and sides only

(outside joint) on mastic joint wrap

Grout and 9" wide

Inside face of box culvert box culvert

Outside face of

12"

18' Span gasket Closed cell

BOX CULVERT BEDDING DETAIL

Span + 4'

Bedding material

R is e

Span Thickness in 6" lifts

Soil compacted

:5

J u n e

B o x

C u lv e r p w w o r k

\d

\w a a je f f e r

A

O P

P la n

S h e e t.

d g n

SHEET 2 OF 2

STRUCTURE DETAILS

BOX CULVERT

PROJECT

G.6

Project work site

CO concurrence

Temporary Traffic Supervisor with the

Final location is determined by the

See Sheet H.1 for details

Advanced sign, Ref-1 location

CO concurrence

Temporary Traffic Supervisor with the

Final location is determined by the

See Sheet H.1 for details

Advanced sign, Ref-1 location

N

Two trout creek H oh R iv er

Scale: 1" = 600'

:4

J u n e

U n n a m e d P la n

P la n

S h e p w w o r k

\d

\T r a f f ic

C o n tr o l

A d v a n c d p

.d g n

ADVANCED SIGN MAP

TEMPORARY TRAFFIC CONTROL

PROJECT

H.2

ROAD WORK

END

WORK

ROAD

AHEAD

ROAD NAME

WORK

ROAD

AHEAD

ROAD WORK

END

WORK

ROAD

xxxxx

WORK

ROAD

xxxxxxx

ROAD WORK

NEXT xx MILES

WORK

ROAD

AHEAD

xx

MPH

ROAD NAME

ROAD WORK

END

WORK

ROAD

xxxxxxx

ROAD WORK

END

xx

MPH

WORK

ROAD

xxxxxxx

ROAD WORK

NEXT xx MILES

12.

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

ROAD TYPE

DISTANCE BETWEEN

A B C

NOTE:

M in o r R o a d

M a jo r R o

B as de ter mi ne d b y t he C

O

Wor k z on e A re a o f I nfl ue nc

(S ee S ign S pa cin g T ab le)

ADVANCE W

ARNI

NG

AREA

(S ee S ign S pa cin g T ab le)

ADVANCE W

ARNI

NG

AREA

A

B

C

A

A

A

A

Pr oje ct Lim its

See Note 8 W16-8P W20-1 over

W20-1

G20-2

See Note 9 W20-1

See Note 9 W20-1

(optional) W13-1P

See Note 10 G20-1

G20-2

See Note 8 W16-8P W20-1 over

G20-2

G20-2

See Note 9 W20-1

See Note 9 W20-1

(optional) W13-1P

See Note 10 G20-1 specify the distance to the work area in feet or in miles. Install an The message on the W20-1 signs may be ROAD WORK AHEAD or may roads only).

name of the road on which the construction does occur (applies to major construction work occurs, include a supplementary plaque indicating the If W20-1 is placed on a roadway other than that on which the actual

Cover post-mounted signs when not applicable.

Do not store traffic control devices along the roadway when not in use.

Maintain two-way traffic during all non-work hours except as approved.

Ensure all sign supports exposed to traffic are crashworthy.

construction area.

needed to indicate a maximum recommended speed through the Install advisory speed plaques under the W20 series warning signs as messages as required.

signs, locate the warning signs to fit field conditions as approved. Vary Where advance warning signs, placed as shown, interfere with permanent operations.

and details in this traffic control plan as necessary to accommodate actual applicable to this project. The Contractor may add or delete information Not all details shown on the temporary traffic control sheets may be

Erect all project advance warning signs before starting construction work.

State standards may be used as an alternative if approved.

verify that an encroachment permit has been obtained.

If signing on a roadway under a jurisdiction other than the client agency, nearest whole mile.

at each end of the project. Show the distance on the G20-1 sign to the

Ro ad N ame

SIGN SPACING TABLE

For work zones that are 2 miles or more in length, install G20-1 signs

Sign Spacing Table.

When used, place the two W20-1 signs "B" feet apart according to the additional W20-1 sign when approach speeds exceed 50 mph.

Expressway / Freeway

NO SCALE

SIGNS IN FEET

Rural greater than 50 mph

Urban and Rural 35 mph to 50 mph

Urban and Rural 30 mph and less

ADVANCE SIGNING

TEMPORARY TRAFFIC CONTROL

635-1

:4 u n e

S td

-1 p w

-w o rk \d m s

\S td

-1

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

not the advisory speed.

Approach speed based on the regulatory posted speed, *

Traffic flow

Traffic flow

ROAD WORK

END

STOP

HERE ON

RED

xx

MPH

ONE LANE

ROAD

AHEAD

WORK

ROAD

AHEAD

STOP

HERE ON

RED

ROAD WORK

END

(optional) light warning

Type B

See Note 5

STOP LINE

See Note 5

STOP LINE

See Note 2

Temporary traffic signal

See Note 2

Temporary traffic signal

Channelizing devices it has two signal faces that are at least 8 feet apart and meets the other

50' - 100'50' - 100'

40' - 180'

See Note 7

10' min.

40' - 180'

NOTE:LENGTH AND SPACING TABLE

SIGN SPACING TABLE

8.

7.

6.

5.

4.

3.

2.

1.

A single signal installation is acceptable, on the right-hand side of the road, if depicted for the opposite direction of travel.

Signs are shown for one direction of travel only. Place signs similar to those the buffer space.

Do not allow equipment, materials, or vehicles to be parked or stored in

Section 156.

For project specific minimum width, refer to Special Contract Requirements, AHEAD (W20-1) and END ROAD WORK (G20-2) signs.

If closure is completely within the project limits, eliminate the ROAD WORK be used for stop lines and no-passing pavement markings.

stop line that comply with the MUTCD. Removable pavement markings may the work space and the stop line. Add no-passing lines in advance of the

Remove existing conflicting pavement markings and raised markers between

For paved roadway surfaces, install stop lines complying with the MUTCD.

qualified engineer.

approved. If signals are moved, determine revised signal timing using a

Final location and spacing of devices may be changed to fit field conditions as or automatically, ensure red signal indications are flashed to both approaches.

engineer. When the signal is changed to the flashing mode either manually requirements of the MUTCD. Establish signal timing using a qualified

Install and operate temporary traffic control signals in accordance with the requirements of the MUTCD.

See Note 6

G20-2

W3-3

R10-6

See Note 6

W20-1 W20-4

(optional)

W13-1P

(optional)

W1-4R

R10-6

See Note 6

G20-2

(See Length and Spacing Table) VARIABLE TERMINATION AREA

ABUFFER SPACE TAPER AREA

(optional)

WORK SPACE

(optional)

BUFFER SPACETAPER AREAABC

ADVANCE WARNING AREA (See Sign Spacing Table)

See Note 5 Device spacing

Spacing Table)

(See Length and

DISTANCE BETWEEN

A B C

Expressway / Freeway

SPEED*

APPROACH

AREA

TAPER

SPACE

BUFFER

SPACE

WORK

CHANNELIZING DEVICE

LENGTH

SPACE

BUFFER

ROAD TYPE

Rural greater than 50 mph

Urban and Rural 35 mph to 50 mph

Urban and Rural 30 mph and less

SIGNS IN FEET

MPH

FEET

SPACING IN FEET

(WITH SIGNALS)

SINGLE LANE CLOSURE LAYOUT

TEMPORARY TRAFFIC CONTROL

635-9

:1 u n e

S td p w w o r k \d m s \S td .d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

Traffic flow

Traffic flow

LENGTH AND SPACING TABLE

pavement markings

Remove conflicting

Channelizing devices

See Note 2

Portable traffic barrier

NOTE:

4.

3.

2.

1.

stored in the buffer space.

Do not allow equipment, materials, or vehicles to be parked or

Requirements, Section 156.

For project specific minimum width, refer to Special Contract protect the barrier ends with a crash cushion. Include

Terminate barrier ends outside the work zone clear zone or

Place barrier according to the AASHTO Roadside Design Guide.

devices may be changed to fit field conditions as approved.

Install signs and other devices for single lane closure according spacing

Device

(optional)

BUFFER SPACE

TAPER AREA

TAPER AREA (

(optional)

BUFFER SPACE

VARIABLE WORK SPACE

(See Length and Spacing Table)

Approach speed based on the regulatory posted speed, not the advisory speed.* to Standard 635-6, 7, 8, or 9. Final location and spacing of reflectors on barrier at 25 ft intervals.

See Note 3

10' min.

(50' - 100')

50' - 100')

SPEED*

APPROACH

AREA

TAPER

SPACE

BUFFER

SPACE

WORK

CHANNELIZING DEVICE

LENGTH

SPACE

BUFFER

WIDTH

CLEAR ZONE

WORK ZONE

RATE

FLARE

BARRIER

CONCRETE

1:16

1:16

1:16

1:16

1:14

1:12

1:10

1:9

1:8

1:8

1:8

MPH

FEET

SPACING IN FEET

FEET

See Note 2

See Note 2

WITH TEMPORARY BARRIER

SINGLE LANE CLOSURE LAYOUT

TEMPORARY TRAFFIC CONTROL

635-13

:1 u n e

S td p w w o r k

\d m s

\S td

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

.7

.1

T 3 4

6 7

.4

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

O

U T

L E

T

" H

E M

L O

C K

" H

E M

L O

C K

" A

L D

E R

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

O

U T

L E

T

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" S

P R

U C

E

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" S

P R

U C

E

I

N L E

T

" H

E M

L O

C K

" H

E M

L O

C K

" A

L D

E R

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" C

E D

A R

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" C

E D

A R

" A

L D

E R

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" A

L D

E R

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" A

L D

E R

I

N L E

T

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" A

L D

E R

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" A

L D

E R

" H

E M

L O

C K

" A

L D

E R

" A

L D

E R

" H

E M

L O

C K

" A

L D

E R

" H

E M

L O

C K

" C

E D

A R

" H

E M

L O

C K

" A

L D

E R

" C

E D

A R

" A

L D

E R

" A

L D

E R

" C

E D

A R

" H

E M

L O

C K

" C

E D

A R

" H

E M

L O

C K

" A

L D

E R

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" A

L D

E R

" H

E M

L O

C K

" H

E M

L O

C K

" A

L D

E R

" C

E D

A R

" C

E D

A R

" H

E M

L O

C K

" H

E M

L O

C K

" C

E D

A R

" H

E M

L O

C K

" H

E M

L O

C K

" C

E D

A R

" H

E M

L O

C K

" A

L D

E R

5/8"IR W/FHWA ALUM CAP

22009

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" A

L D

E R

" H

E M

L O

C K

" C

E D

A R

" H

E M

L O

C K

" A

L D

E R

" A

L D

E R

" H

E M

L O

C K

" H

E M

L O

C K

" A

L D

E R

" C

E D

A R

" A

L D

E R

" A

L D

E R

" H

E M

L O

C K

" A

L D

E R

" C

E D

A R

" A

L D

E R

" H

E M

L O

C K

" H

E M

L O

C K

" C

E D

A R

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" C

E D

A R

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" A

L D

E R

" A

L D

E R

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" A

L D

E R

" H

E M

L O

C K

" H

E M

L O

C K

" C

E D

A R

" C

E D

A R

" H

E M

L O

C K

" C

E D

A R

" A

L D

E R

" A

L D

E R1 " C

E D

A R

" A

L D

E R

" C

E D

A R

" C

E D

A R

" A

L D

E R

" H

E M

L O

C K

" H

E M

L O

C K

" C

E D

A R

" A

L D

E R

" A

L D

E R

" C

E D

A R

" C

E D

A R

" C

E D

A R

" C

E D

A R

" H

E M

L O

C K

" H

E M

L O

C K

" A

L D

E R

" A

L D

E R

" H

E M

L O

C K

" A

L D

E R

" H

E M

L O

C K

" H

E M

L O

C K

" A

L D

E R

" A

L D

E R

" A

L D

E R

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" H

E M

L O

C K

" A

L D

E R

" C

E D

A R

" C

E D

A R

" H

E M

L O

C K

" A

L D

E R

" A

L D

E R

" A

L D

E R

" A

L D

E R

5/8"

IR W

/FHWA ALUM CAP

" A

L D

E R

" A

L D

E R

N

Slope stake limits Construction Limit

NOTE:

1.

unless designated to be remained by the CO

Trees within the slope stake limits are to be removed unless otherwise directed removal by the CO the construction limits are to be remained

Tree in between slope staking limits and 2.

Ty pe o f t re e pl an tin g an d ex ac t a re a

TBD

:4

A p r il

M a in

P la n

S h e p w w o r k \d

\T r e e r e m o v a l p la n .d g n

TREE PLAN

PROJECT

I.2

2'-0" 8'-0"

:4 a r c h

S ta n d a r p w w o r k

\d

\W il lo w a n d C o tt o n w o o d

I n s ta ll a ti o n

D e ta il s .d g n

INSTALLATION DETAILS

WILLOW AND COTTONWOOD

PROJECT

NUMBER

WA FLAP JEFFER 134309(2) I.3

Set hingeline at OHW trench method

Pole plantings, WA FLAP JEFFER 134309(2) I.4

Type text here

48" OUTLET

48" OUTLET

48" INLET

48" INLET

N

B

B place as directed by CO.

15' to 20' length including root wad, 18" to 24" diameter

Environmental design, root wad

NO SCALE

on Sheet I.6

See Detail 1

Existing top of bank d ia m e te r

' m in

Root ball fan

Trunk length

T r u n k d ia

D B

H

A

A

SECTION A-A (Typical)

Minimum 10' length

18" to 24" diameter

Untreated timber pile, in place

4' below ground surface

Extend timber pile

Untreated timber pile, in place

15' to 20' length including root wad

18" to 24" diameter

Environmental design, root wad above top of root wad

Extend timber pile max 3'

Untreated timber pile, in place

(typ.)

Existing tree

Streambed

Flow

:5

J u n e

E n v

M it ig a ti o n

S h e e p w w o r k \d

\w a a je f f e r A

O P

P la n S h e e t.

d g n

SHEET 1 OF 2

LOG BARRIER

ENVIRONMENTAL MITIGATION

PROJECT

I.5

N directed by CO including root wad, fit in field as

18" to 24" diameter, minimum 20' length

Environmental design, root wad by CO

12' length, fit in field as directed minimum 24" diameter, minimum

Environmental design, log barrier directed by CO including root wad, fit in field as

18" to 24" diameter, minimum 20' length

Environmental design, root wad

12' length,fit in field as directed by CO minimum 24" diameter, minimum

Environmental design, log barrier

PLAN VIEW

DETAIL 1

SECTION B-B (Typical)

Fit in field as directed by CO

Overlap log barriers 2' to 3'.

field as directed by CO log barriers. Fit in

2' to 3' gap between

NO SCALE

SECTION C-C (Typical) in the streambed

Bury log 1/3 of its diameter

Environmental design, log barrier below streambed

Bury end of root wad 3 feet

Environmental design, root wad

Top of bank

Streambed

Streambed

C

C

F lo w

:3

J u n e

E n v

M it ig a ti o n

S h e e p w w o r k \d

\w a a je f f e r A

O P

P la n S h e e t.

d g n

SHEET 2 OF 2

LOG BARRIER

ENVIRONMENTAL MITIGATION

PROJECT

I.6

OT FOR CONSTRUCTION

Thinh.Phan Cross-Out

Thinh.Phan Inserted Text

E_Section Environmental Mitigation and Erosion control .pdf
E_W629-1.pdf
WFL Detail Drawings
W629-1: Rolled Erosion Control Product on Slopes
Metric
US Customary
W_W157-21.pdf
WFL Detail Drawings
W157-21: Fiber Roll
Metric
US Customary
E_W157-15.pdf
WFL Detail Drawings
W157-15: Check Dam, Moderate Grades
Metric
US Customary
E_W157-1.pdf
WFL Detail Drawings
W157-1: Silt Fence
Metric
US Customary
Diversion channel Std628-1.pdf
FLH Standard Drawings
628-1: Temporary Stream Diversion Channels
Metric
US Customary
E_W157-1.pdf
WFL Detail Drawings
W157-1: Silt Fence
Metric
US Customary
F_Section Safety.pdf
FLH Standard Drawings
617-20: MGS and G4 W-Beam Guardrail, Type Tangent Terminal and Grading
Metric
US Customary
Std617-32 MGS WBeam Grd Steel Posts.pdf
FLH Standard Drawings
617-32: MGS W-Beam Guardrail, Steel Posts
Metric
US Customary
Std617-37 MGS WBeam Grd Longspan sys.pdf
FLH Standard Drawings
617-37: MGS W-Beam Guardrail Long-Span System
Metric
US Customary
H_Section Temporary Traffic Control.pdf
Temp Traffic single lane with barrier Std635-1.pdf

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .