About this opportunity

This solicitation seeks to replace all control valves, check valves, flow control valves, tube lines, and rubber hydraulic lines within the existing hydraulic system at the Green River Lake Control Tower in Campbellsville, Kentucky. The U.S. Army Corps of Engineers Engineering District Louisville requires the selected contractor to complete the work within 210 calendar days of receiving the notice to proceed, with all quotes due no later than June 9, 2021. The award will be made to the lowest priced technically acceptable offeror.

This 100% set-aside for small business procurement is classified under NAICS code 332912 for fluid power valve and hose fitting manufacturing. The place of performance is the Green River Lake Control Tower facility located at 544 Lake Road in Campbellsville, Kentucky. Interested parties must ensure registration within the System for Award Management to facilitate payment via electronic funds transfer upon completion of replacing the hydraulic system components, which are rated for a maximum pressure of 1,875 PSI, within the required 210-day performance period.

Notice text

3 versions

Update #3 · Latest ·

SPECIAL INSTRUCTIONS

Amendment 0001 has been added to include an aditional site visit on Thursday 03 June 2021 at 10:00am Eastern Time. 

******Additional Information: An additional picture was added to the Attachments/Links section for clarification on the capacity of the Hydraulic Tower Unit (hydraulic reservoir).  The reservoir has a 275 gallon cap.  This information was on the placard that could have been seen during the site visit.******

This Request for Quote (RFQ) is for a contract to replace all control valves, check valves, flow control valves, tube lines, and all rubber hydraulic lines within the existing hydraulic system in the Green River Lake Control Tower, Taylor County, Kentucky.

The contractor shall replace all control valves, check valves, flow control valves, tube lines, and all rubber hydraulic lines within the existing hydraulic system.  Rubber lines shall be replaced with braided stainless lines.  Tube lines will be replaced with new stainless steel tube lines.  The existing hydraulic system is rated for a maximum pressure of 1,875 psi.

Work will begin within 10 calendar days of the Notice to Proceed (NTP) and will conclude 210 calendar days after the NTP. 

Location:

U.S. Army Corps of Engineers

Green River Lake

544 Lake Road

Campbellsville, KY 42718

270-465-4463

This procurement is 100% set-aside for Small Business, NAICS: 332912- Fluid Power Valve and Hose Fitting Manufacturing

Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.

Note: The contract award will be based on Lowest Price to the Government. One firm fixed-price award from this RFQ. In addition to the completed price breakout schedule quote, the Offeror must complete and submit the Representations and Certifications located within the solicitation.

Please submit quotes to:

U.S. Army Corps of Engineers

Jessica L. McCall at Jessica.L.McCall@USACE.ARMY.MIL

Quotes are due 09 June 2021, 11:00 AM Eastern Standard Time. Fax submittals will not be accepted. Electronic submittals will be accepted and may be emailed to Jessica.L.Mccall@usace.army.mil.

SITE VISITS ARE HIGHLY RECOMMENDED. A site visit on Tuesday 25 May 2021 at 10:00am Eastern Standard Time has been scheduled. Contact Lori Brewster, Project Manager, (270) 465-4463, Campbellsville, Kentucky 42718.

An additional site visit has been scheduled for Thursday 03 June 2021 at 10:00am Eastern Time.

The contractor will be required to attend a pre-work conference prior to beginning work during which the Contractor’s plan of work, safety procedures, startup date, and other items in this contract will be discussed.

All contractors must be registered in the System for Award Management (www.SAM.gov) prior to submission of a quote.

All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from http://www.SAM.gov. Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg.

Please begin the registration process immediately in order to have an active registration prior to the solicitation closing date.

ALERT: You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record.  The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration. 

Effective 29 June 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter.  However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM.

Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (known as DUNS). The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM. To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).

Update #2 ·

SPECIAL INSTRUCTIONS

Amendment 0001 has been added to include an aditional site visit on Thursday 03 June 2021 at 10:00am Eastern Time. 

This Request for Quote (RFQ) is for a contract to replace all control valves, check valves, flow control valves, tube lines, and all rubber hydraulic lines within the existing hydraulic system in the Green River Lake Control Tower, Taylor County, Kentucky.

The contractor shall replace all control valves, check valves, flow control valves, tube lines, and all rubber hydraulic lines within the existing hydraulic system.  Rubber lines shall be replaced with braided stainless lines.  Tube lines will be replaced with new stainless steel tube lines.  The existing hydraulic system is rated for a maximum pressure of 1,875 psi.

Work will begin within 10 calendar days of the Notice to Proceed (NTP) and will conclude 210 calendar days after the NTP. 

Location:

U.S. Army Corps of Engineers

Green River Lake

544 Lake Road

Campbellsville, KY 42718

270-465-4463

This procurement is 100% set-aside for Small Business, NAICS: 332912- Fluid Power Valve and Hose Fitting Manufacturing

Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.

Note: The contract award will be based on Lowest Price to the Government. One firm fixed-price award from this RFQ. In addition to the completed price breakout schedule quote, the Offeror must complete and submit the Representations and Certifications located within the solicitation.

Please submit quotes to:

U.S. Army Corps of Engineers

Jessica L. McCall at Jessica.L.McCall@USACE.ARMY.MIL

Quotes are due 09 June 2021, 11:00 AM Eastern Standard Time. Fax submittals will not be accepted. Electronic submittals will be accepted and may be emailed to Jessica.L.Mccall@usace.army.mil.

SITE VISITS ARE HIGHLY RECOMMENDED. A site visit on Tuesday 25 May 2021 at 10:00am Eastern Standard Time has been scheduled. Contact Lori Brewster, Project Manager, (270) 465-4463, Campbellsville, Kentucky 42718.

An additional site visit has been scheduled for Thursday 03 June 2021 at 10:00am Eastern Time.

The contractor will be required to attend a pre-work conference prior to beginning work during which the Contractor’s plan of work, safety procedures, startup date, and other items in this contract will be discussed.

All contractors must be registered in the System for Award Management (www.SAM.gov) prior to submission of a quote.

All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from http://www.SAM.gov. Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg.

Please begin the registration process immediately in order to have an active registration prior to the solicitation closing date.

ALERT: You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record.  The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration. 

Effective 29 June 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter.  However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM.

Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (known as DUNS). The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM. To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).

Update #1 ·

SPECIAL INSTRUCTIONS

This Request for Quote (RFQ) is for a contract to replace all control valves, check valves, flow control valves, tube lines, and all rubber hydraulic lines within the existing hydraulic system in the Green River Lake Control Tower, Taylor County, Kentucky.

The contractor shall replace all control valves, check valves, flow control valves, tube lines, and all rubber hydraulic lines within the existing hydraulic system.  Rubber lines shall be replaced with braided stainless lines.  Tube lines will be replaced with new stainless steel tube lines.  The existing hydraulic system is rated for a maximum pressure of 1,875 psi.

Work will begin within 10 calendar days of the Notice to Proceed (NTP) and will conclude 210 calendar days after the NTP. 

Location:

U.S. Army Corps of Engineers

Green River Lake

544 Lake Road

Campbellsville, KY 42718

270-465-4463

This procurement is 100% set-aside for Small Business, NAICS: 332912- Fluid Power Valve and Hose Fitting Manufacturing

Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.

Note: The contract award will be based on Lowest Price to the Government. One firm fixed-price award from this RFQ. In addition to the completed price breakout schedule quote, the Offeror must complete and submit the Representations and Certifications located within the solicitation.

Please submit quotes to:

U.S. Army Corps of Engineers

Jessica L. McCall at Jessica.L.McCall@USACE.ARMY.MIL

Quotes are due 09 June 2021, 11:00 AM Eastern Standard Time. Fax submittals will not be accepted. Electronic submittals will be accepted and may be emailed to Jessica.L.Mccall@usace.army.mil.

SITE VISITS ARE HIGHLY RECOMMENDED. A site visit on Tuesday 25 May 2021 at 10:00am Eastern Standard Time has been scheduled. Contact Lori Brewster, Project Manager, (270) 465-4463, Campbellsville, Kentucky 42718.

The contractor will be required to attend a pre-work conference prior to beginning work during which the Contractor’s plan of work, safety procedures, startup date, and other items in this contract will be discussed.

All contractors must be registered in the System for Award Management (www.SAM.gov) prior to submission of a quote.

All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from http://www.SAM.gov. Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg.

Please begin the registration process immediately in order to have an active registration prior to the solicitation closing date.

ALERT: You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record.  The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration. 

Effective 29 June 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter.  However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM.

Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (known as DUNS). The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM. To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).

Files

File Type Posted
Hydraulic Reservoir Picture.pdf PDF
W912QR21Q0061_0001.pdf PDF
W912QR21Q0061.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
WH Ford RTC Fueling System Repairs 42345 · NAICS 237120 ENDIST Omaha Total Small Business
Tunnel 9 Pitch Upgrade Silver Spring, Maryland 20903, United States · NAICS 332912 Air Force Test Center Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors