Hydraulic Reservoir Picture.pdf

PDF 126 KB Posted

Attached to
W912QR21Q0061-Green River Lake Hydraulic Line Replacement
Solicitation number
W912QR21Q0061
Issued by

About this file

This request for quote from the Department of the Army Corps of Engineers Engineering District Louisville seeks to replace all control valves, check valves, flow control valves, tube lines, and rubber hydraulic lines within the existing hydraulic system at the Green River Lake Control Tower in Taylor County, Kentucky. The contractor shall complete the work within 210 calendar days of receiving the notice to proceed, no later than June 9, 2021. The solicitation is set aside exclusively for small businesses and will result in a fixed-price contract awarded to the lowest priced technically acceptable offeror. Interested parties should visit the site on May 25, 2021 and ensure their entity is registered within the System for Award Management to receive payment via electronic funds transfer upon completion of the work.

View the file

Other files

File Type Posted
W912QR21Q0061_0001.pdf PDF
W912QR21Q0061.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .