W912HN22B4011 - Project Number FA-16111-20 Enlarge/Modify Bldg. W-1967 Arrival/Departure Airfield Control Group (A/DACG)

Closed Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest special notice from .

Solicitation number
W912HN22B4011
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Fort Bragg, North Carolina 28310, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers Savannah District is seeking proposals for project number FA-16111-20 to enlarge and modify building W-1967, which houses the Arrival/Departure Airfield Control Group at Fort Bragg, North Carolina. The scope of work involves adding 806 square feet to the second story, renovating and expanding existing spaces including corridors, toilet rooms and latrines, and installing two pre-manufactured metal canopies. Offerors must submit firm-fixed-price bids electronically through PIEE by August 27, 2022. The contract will be awarded utilizing sealed bid procedures under North American Industry Classification System code 236220.

This acquisition is designated as a 100% total small business set-aside with an anticipated construction magnitude between $10 million and $25 million. The North American Industry Classification System code is 236220 for commercial and institutional building construction and the period of performance is 480 calendar days from notice to proceed at Fort Bragg, North Carolina.

Notice text

8 versions

Update #8 · Latest ·

ABSTRACT HAS BEEN POSTED

FOR BID OPENING INFORMATION - 

1400 Hours

https://usace1.webex.com/meet/gregory.m.graham | 27634198594

Join by video system

Dial gregory.m.graham@usace1.webex.com and enter your host PIN .

You can also dial 207.182.190.20 and enter your meeting number.

Join by phone

+1-844-800-2712 US Toll Free

+1-669-234-1177 US Toll

Access code: 2763 419 8594

AMD 0004- Provides SPECS_VOL1_AMD4

AMD 0004- Provide Hardware Information

AMD 0003-  Provides AS-BUILTS.pdf and make it part of the solicitation. All other terms and conditions remain unchanged.

AMD 0002 - Clarifies CLIN 0002 and changes the construction magnitude to $1M - $5M All other terms and conditions remain unchanged.

AMD 0001 - Changes Proposal Due Date from 27 August to 30 August 2022 at 1300 EST All other terms and conditions remain unchanged

SITE VISIT INFORMATION -  Site visit Roster has been updated

LOCATION IS THE A/DACG Building W-1967 at the airfield at 1000 hrs. The area is currently fenced off and no check-in is required to get to the fenced location. You will meet with the POC at that time. PROJNET will be updated with these same instructions.

Solicitation Notice Synopsis W912HN22B4011

Project Number: FA-16111-20

FA-16111-20 Enlarge/Modify Bldg. W-1967 Arrival/Departure Airfield Control Group (A/DACG)

The U.S. Army Corps of Engineers (USACE) Savannah District is issuing an Invitation for Bid (IFB) W912HN22B4011 for Project FA-16111-20 Enlarge/Modify Bldg. W-1967 Arrival/Departure Airfield Control Group (A/DACG)

Note: The subsequent solicitation will result in a C-Type Stand-alone contract.

Type of Contract & NAICS:  This Acquisition will be solicited using FAR Part 14, Sealed Bid Procedures for one (1) Firm-Fixed-Price (FFP) contract.  The North American Industry Classification System (NAICS) code is 236220 Commercial and Institutional Building Construction with a size standard of $39.5M.

Type of Set-Aside:  This acquisition is being offered as a 100% Total Small Business Set Aside

Construction Magnitude:  In accordance with DFARS 36.204, the magnitude of this construction project is anticipated to be between $1M-$5M.

Anticipated Solicitation Due Date:  The closing date is 27 August 2022. 

Period of Performance:  The period of performance including all options is 480 Calendar Days after the issuance of the notice to proceed.

Project scope: 

The Arrival/Departure Airfield Control Group(A/DACG) within the
existing Fort Bragg Installation Transportation Office. A/DACG provides customers with Air Load Planning support of
world-wide deployment operations. The work includes a 806sf second story addition to the existing building; repairs to the
Main Building, including the corridor and toilet rooms . Work also includes the Renovation of Latrines and addition of
latrine of the ground level to provide additional 304sf of floor area to increase the flushing fixtures count. The following
describes categorization of scope components aligned to Fort Bragg's requirements.
a. 806 square feet second story addition to existing building (New Load Planning Room).
b. Renovate and expand existing Operation Center on 2nd floor .
c. Renovation of associated spaces including corridor and toilet rooms.
d. Ground level Latrine renovation , including plumbing fixtures .
e. Expansion of ground level latrines by additional 304 square feet to increase flushing fixture count.
f. Two (2) new Pre-manufacturered metal canopies over both of the existing length scales in inclement weather.
g. Install empty conduits to the location of the rear wheel scale at each canopy for power and communications.

Solicitation Website:  The official solicitation, when posted, will be available free of charge by electronic posting only and may be found on the System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored.

Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://sam.gov to download the solicitation for this project.

If/when issued, Amendments will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Offerors must check the website periodically for any amendments to the solicitation.

Registrations:  System for Award Management (SAM)-Offerors shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. Suppose the Offeror is a Joint Venture (JV). In that case, the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If an Offeror is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective Offeror.

Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronic via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/.

PIEE DIRECT LINK - https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B4011

Point of Contacts:  For this acquisition, the contracting officer, Mr. Greg Graham, whose e-mail address is gregory.m.graham@usace.army.mil., and the Contract Specialist, Tatjana Fisher, whose e-mail address is tatjana.m.fisher@usace.army.mil.

Update #7 ·

FOR BID OPENING INFORMATION - 

1400 Hours

https://usace1.webex.com/meet/gregory.m.graham | 27634198594

Join by video system

Dial gregory.m.graham@usace1.webex.com and enter your host PIN .

You can also dial 207.182.190.20 and enter your meeting number.

Join by phone

+1-844-800-2712 US Toll Free

+1-669-234-1177 US Toll

Access code: 2763 419 8594

AMD 0004- Provides SPECS_VOL1_AMD4

AMD 0004- Provide Hardware Information

AMD 0003-  Provides AS-BUILTS.pdf and make it part of the solicitation. All other terms and conditions remain unchanged.

AMD 0002 - Clarifies CLIN 0002 and changes the construction magnitude to $1M - $5M All other terms and conditions remain unchanged.

AMD 0001 - Changes Proposal Due Date from 27 August to 30 August 2022 at 1300 EST All other terms and conditions remain unchanged

SITE VISIT INFORMATION -  Site visit Roster has been updated

LOCATION IS THE A/DACG Building W-1967 at the airfield at 1000 hrs. The area is currently fenced off and no check-in is required to get to the fenced location. You will meet with the POC at that time. PROJNET will be updated with these same instructions.

Solicitation Notice Synopsis W912HN22B4011

Project Number: FA-16111-20

FA-16111-20 Enlarge/Modify Bldg. W-1967 Arrival/Departure Airfield Control Group (A/DACG)

The U.S. Army Corps of Engineers (USACE) Savannah District is issuing an Invitation for Bid (IFB) W912HN22B4011 for Project FA-16111-20 Enlarge/Modify Bldg. W-1967 Arrival/Departure Airfield Control Group (A/DACG)

Note: The subsequent solicitation will result in a C-Type Stand-alone contract.

Type of Contract & NAICS:  This Acquisition will be solicited using FAR Part 14, Sealed Bid Procedures for one (1) Firm-Fixed-Price (FFP) contract.  The North American Industry Classification System (NAICS) code is 236220 Commercial and Institutional Building Construction with a size standard of $39.5M.

Type of Set-Aside:  This acquisition is being offered as a 100% Total Small Business Set Aside

Construction Magnitude:  In accordance with DFARS 36.204, the magnitude of this construction project is anticipated to be between $1M-$5M.

Anticipated Solicitation Due Date:  The closing date is 27 August 2022. 

Period of Performance:  The period of performance including all options is 480 Calendar Days after the issuance of the notice to proceed.

Project scope: 

The Arrival/Departure Airfield Control Group(A/DACG) within the
existing Fort Bragg Installation Transportation Office. A/DACG provides customers with Air Load Planning support of
world-wide deployment operations. The work includes a 806sf second story addition to the existing building; repairs to the
Main Building, including the corridor and toilet rooms . Work also includes the Renovation of Latrines and addition of
latrine of the ground level to provide additional 304sf of floor area to increase the flushing fixtures count. The following
describes categorization of scope components aligned to Fort Bragg's requirements.
a. 806 square feet second story addition to existing building (New Load Planning Room).
b. Renovate and expand existing Operation Center on 2nd floor .
c. Renovation of associated spaces including corridor and toilet rooms.
d. Ground level Latrine renovation , including plumbing fixtures .
e. Expansion of ground level latrines by additional 304 square feet to increase flushing fixture count.
f. Two (2) new Pre-manufacturered metal canopies over both of the existing length scales in inclement weather.
g. Install empty conduits to the location of the rear wheel scale at each canopy for power and communications.

Solicitation Website:  The official solicitation, when posted, will be available free of charge by electronic posting only and may be found on the System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored.

Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://sam.gov to download the solicitation for this project.

If/when issued, Amendments will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Offerors must check the website periodically for any amendments to the solicitation.

Registrations:  System for Award Management (SAM)-Offerors shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. Suppose the Offeror is a Joint Venture (JV). In that case, the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If an Offeror is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective Offeror.

Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronic via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/.

PIEE DIRECT LINK - https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B4011

Point of Contacts:  For this acquisition, the contracting officer, Mr. Greg Graham, whose e-mail address is gregory.m.graham@usace.army.mil., and the Contract Specialist, Tatjana Fisher, whose e-mail address is tatjana.m.fisher@usace.army.mil.

Update #6 ·

AMD 0004- Provides SPECS_VOL1_AMD4

 

AMD 0004- Provide Hardware Information

AMD 0003-  Provides AS-BUILTS.pdf and make it part of the solicitation. All other terms and conditions remain unchanged.

AMD 0002 - Clarifies CLIN 0002 and changes the construction magnitude to $1M - $5M All other terms and conditions remain unchanged.

AMD 0001 - Changes Proposal Due Date from 27 August to 30 August 2022 at 1300 EST All other terms and conditions remain unchanged

SITE VISIT INFORMATION -  Site visit Roster has been updated

LOCATION IS THE A/DACG Building W-1967 at the airfield at 1000 hrs. The area is currently fenced off and no check-in is required to get to the fenced location. You will meet with the POC at that time. PROJNET will be updated with these same instructions.

Solicitation Notice Synopsis W912HN22B4011

Project Number: FA-16111-20

FA-16111-20 Enlarge/Modify Bldg. W-1967 Arrival/Departure Airfield Control Group (A/DACG)

The U.S. Army Corps of Engineers (USACE) Savannah District is issuing an Invitation for Bid (IFB) W912HN22B4011 for Project FA-16111-20 Enlarge/Modify Bldg. W-1967 Arrival/Departure Airfield Control Group (A/DACG)

Note: The subsequent solicitation will result in a C-Type Stand-alone contract.

Type of Contract & NAICS:  This Acquisition will be solicited using FAR Part 14, Sealed Bid Procedures for one (1) Firm-Fixed-Price (FFP) contract.  The North American Industry Classification System (NAICS) code is 236220 Commercial and Institutional Building Construction with a size standard of $39.5M.

Type of Set-Aside:  This acquisition is being offered as a 100% Total Small Business Set Aside

Construction Magnitude:  In accordance with DFARS 36.204, the magnitude of this construction project is anticipated to be between $1M-$5M.

Anticipated Solicitation Due Date:  The closing date is 27 August 2022. 

Period of Performance:  The period of performance including all options is 480 Calendar Days after the issuance of the notice to proceed.

Project scope: 

The Arrival/Departure Airfield Control Group(A/DACG) within the
existing Fort Bragg Installation Transportation Office. A/DACG provides customers with Air Load Planning support of
world-wide deployment operations. The work includes a 806sf second story addition to the existing building; repairs to the
Main Building, including the corridor and toilet rooms . Work also includes the Renovation of Latrines and addition of
latrine of the ground level to provide additional 304sf of floor area to increase the flushing fixtures count. The following
describes categorization of scope components aligned to Fort Bragg's requirements.
a. 806 square feet second story addition to existing building (New Load Planning Room).
b. Renovate and expand existing Operation Center on 2nd floor .
c. Renovation of associated spaces including corridor and toilet rooms.
d. Ground level Latrine renovation , including plumbing fixtures .
e. Expansion of ground level latrines by additional 304 square feet to increase flushing fixture count.
f. Two (2) new Pre-manufacturered metal canopies over both of the existing length scales in inclement weather.
g. Install empty conduits to the location of the rear wheel scale at each canopy for power and communications.

Solicitation Website:  The official solicitation, when posted, will be available free of charge by electronic posting only and may be found on the System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored.

Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://sam.gov to download the solicitation for this project.

If/when issued, Amendments will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Offerors must check the website periodically for any amendments to the solicitation.

Registrations:  System for Award Management (SAM)-Offerors shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. Suppose the Offeror is a Joint Venture (JV). In that case, the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If an Offeror is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective Offeror.

Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronic via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/.

Point of Contacts:  For this acquisition, the contracting officer, Mr. Greg Graham, whose e-mail address is gregory.m.graham@usace.army.mil., and the Contract Specialist, Tatjana Fisher, whose e-mail address is tatjana.m.fisher@usace.army.mil.

Update #5 ·

AMD 0004- Provide Hardware Information

AMD 0003-  Provides AS-BUILTS.pdf and make it part of the solicitation. All other terms and conditions remain unchanged.

AMD 0002 - Clarifies CLIN 0002 and changes the construction magnitude to $1M - $5M All other terms and conditions remain unchanged.

AMD 0001 - Changes Proposal Due Date from 27 August to 30 August 2022 at 1300 EST All other terms and conditions remain unchanged

SITE VISIT INFORMATION -  Site visit Roster has been updated

LOCATION IS THE A/DACG Building W-1967 at the airfield at 1000 hrs. The area is currently fenced off and no check-in is required to get to the fenced location. You will meet with the POC at that time. PROJNET will be updated with these same instructions.

Solicitation Notice Synopsis W912HN22B4011

Project Number: FA-16111-20

FA-16111-20 Enlarge/Modify Bldg. W-1967 Arrival/Departure Airfield Control Group (A/DACG)

The U.S. Army Corps of Engineers (USACE) Savannah District is issuing an Invitation for Bid (IFB) W912HN22B4011 for Project FA-16111-20 Enlarge/Modify Bldg. W-1967 Arrival/Departure Airfield Control Group (A/DACG)

Note: The subsequent solicitation will result in a C-Type Stand-alone contract.

Type of Contract & NAICS:  This Acquisition will be solicited using FAR Part 14, Sealed Bid Procedures for one (1) Firm-Fixed-Price (FFP) contract.  The North American Industry Classification System (NAICS) code is 236220 Commercial and Institutional Building Construction with a size standard of $39.5M.

Type of Set-Aside:  This acquisition is being offered as a 100% Total Small Business Set Aside

Construction Magnitude:  In accordance with DFARS 36.204, the magnitude of this construction project is anticipated to be between $1M-$5M.

Anticipated Solicitation Due Date:  The closing date is 27 August 2022. 

Period of Performance:  The period of performance including all options is 480 Calendar Days after the issuance of the notice to proceed.

Project scope: 

The Arrival/Departure Airfield Control Group(A/DACG) within the
existing Fort Bragg Installation Transportation Office. A/DACG provides customers with Air Load Planning support of
world-wide deployment operations. The work includes a 806sf second story addition to the existing building; repairs to the
Main Building, including the corridor and toilet rooms . Work also includes the Renovation of Latrines and addition of
latrine of the ground level to provide additional 304sf of floor area to increase the flushing fixtures count. The following
describes categorization of scope components aligned to Fort Bragg's requirements.
a. 806 square feet second story addition to existing building (New Load Planning Room).
b. Renovate and expand existing Operation Center on 2nd floor .
c. Renovation of associated spaces including corridor and toilet rooms.
d. Ground level Latrine renovation , including plumbing fixtures .
e. Expansion of ground level latrines by additional 304 square feet to increase flushing fixture count.
f. Two (2) new Pre-manufacturered metal canopies over both of the existing length scales in inclement weather.
g. Install empty conduits to the location of the rear wheel scale at each canopy for power and communications.

Solicitation Website:  The official solicitation, when posted, will be available free of charge by electronic posting only and may be found on the System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored.

Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://sam.gov to download the solicitation for this project.

If/when issued, Amendments will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Offerors must check the website periodically for any amendments to the solicitation.

Registrations:  System for Award Management (SAM)-Offerors shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. Suppose the Offeror is a Joint Venture (JV). In that case, the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If an Offeror is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective Offeror.

Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronic via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/.

Point of Contacts:  For this acquisition, the contracting officer, Mr. Greg Graham, whose e-mail address is gregory.m.graham@usace.army.mil., and the Contract Specialist, Tatjana Fisher, whose e-mail address is tatjana.m.fisher@usace.army.mil.

Update #4 ·

AMD 0003-  Provides AS-BUILTS.pdf and make it part of the solicitation. All other terms and conditions remain unchanged.

AMD 0002 - Clarifies CLIN 0002 and changes the construction magnitude to $1M - $5M All other terms and conditions remain unchanged.

AMD 0001 - Changes Proposal Due Date from 27 August to 30 August 2022 at 1300 EST All other terms and conditions remain unchanged

SITE VISIT INFORMATION -  Site visit Roster has been updated

LOCATION IS THE A/DACG Building W-1967 at the airfield at 1000 hrs. The area is currently fenced off and no check-in is required to get to the fenced location. You will meet with the POC at that time. PROJNET will be updated with these same instructions.

Solicitation Notice Synopsis W912HN22B4011

Project Number: FA-16111-20

FA-16111-20 Enlarge/Modify Bldg. W-1967 Arrival/Departure Airfield Control Group (A/DACG)

The U.S. Army Corps of Engineers (USACE) Savannah District is issuing an Invitation for Bid (IFB) W912HN22B4011 for Project FA-16111-20 Enlarge/Modify Bldg. W-1967 Arrival/Departure Airfield Control Group (A/DACG)

Note: The subsequent solicitation will result in a C-Type Stand-alone contract.

Type of Contract & NAICS:  This Acquisition will be solicited using FAR Part 14, Sealed Bid Procedures for one (1) Firm-Fixed-Price (FFP) contract.  The North American Industry Classification System (NAICS) code is 236220 Commercial and Institutional Building Construction with a size standard of $39.5M.

Type of Set-Aside:  This acquisition is being offered as a 100% Total Small Business Set Aside

Construction Magnitude:  In accordance with DFARS 36.204, the magnitude of this construction project is anticipated to be between $1M-$5M.

Anticipated Solicitation Due Date:  The closing date is 27 August 2022. 

Period of Performance:  The period of performance including all options is 480 Calendar Days after the issuance of the notice to proceed.

Project scope: 

The Arrival/Departure Airfield Control Group(A/DACG) within the
existing Fort Bragg Installation Transportation Office. A/DACG provides customers with Air Load Planning support of
world-wide deployment operations. The work includes a 806sf second story addition to the existing building; repairs to the
Main Building, including the corridor and toilet rooms . Work also includes the Renovation of Latrines and addition of
latrine of the ground level to provide additional 304sf of floor area to increase the flushing fixtures count. The following
describes categorization of scope components aligned to Fort Bragg's requirements.
a. 806 square feet second story addition to existing building (New Load Planning Room).
b. Renovate and expand existing Operation Center on 2nd floor .
c. Renovation of associated spaces including corridor and toilet rooms.
d. Ground level Latrine renovation , including plumbing fixtures .
e. Expansion of ground level latrines by additional 304 square feet to increase flushing fixture count.
f. Two (2) new Pre-manufacturered metal canopies over both of the existing length scales in inclement weather.
g. Install empty conduits to the location of the rear wheel scale at each canopy for power and communications.

Solicitation Website:  The official solicitation, when posted, will be available free of charge by electronic posting only and may be found on the System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored.

Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://sam.gov to download the solicitation for this project.

If/when issued, Amendments will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Offerors must check the website periodically for any amendments to the solicitation.

Registrations:  System for Award Management (SAM)-Offerors shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. Suppose the Offeror is a Joint Venture (JV). In that case, the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If an Offeror is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective Offeror.

Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronic via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/.

Point of Contacts:  For this acquisition, the contracting officer, Mr. Greg Graham, whose e-mail address is gregory.m.graham@usace.army.mil., and the Contract Specialist, Tatjana Fisher, whose e-mail address is tatjana.m.fisher@usace.army.mil.

Update #3 ·

AMD 0002 - Clarifies CLIN 0002 and changes the construction magnitude to $1M - $5M All other terms and conditions remain unchanged.

AMD 0001 - Changes Proposal Due Date from 27 August to 30 August 2022 at 1300 EST All other terms and conditions remain unchanged

SITE VISIT INFORMATION -  Site visit Roster has been updated

LOCATION IS THE A/DACG Building W-1967 at the airfield at 1000 hrs. The area is currently fenced off and no check-in is required to get to the fenced location. You will meet with the POC at that time. PROJNET will be updated with these same instructions.

Solicitation Notice Synopsis W912HN22B4011

Project Number: FA-16111-20

FA-16111-20 Enlarge/Modify Bldg. W-1967 Arrival/Departure Airfield Control Group (A/DACG)

The U.S. Army Corps of Engineers (USACE) Savannah District is issuing an Invitation for Bid (IFB) W912HN22B4011 for Project FA-16111-20 Enlarge/Modify Bldg. W-1967 Arrival/Departure Airfield Control Group (A/DACG)

Note: The subsequent solicitation will result in a C-Type Stand-alone contract.

Type of Contract & NAICS:  This Acquisition will be solicited using FAR Part 14, Sealed Bid Procedures for one (1) Firm-Fixed-Price (FFP) contract.  The North American Industry Classification System (NAICS) code is 236220 Commercial and Institutional Building Construction with a size standard of $39.5M.

Type of Set-Aside:  This acquisition is being offered as a 100% Total Small Business Set Aside

Construction Magnitude:  In accordance with DFARS 36.204, the magnitude of this construction project is anticipated to be between $1M-$5M.

Anticipated Solicitation Due Date:  The closing date is 27 August 2022. 

Period of Performance:  The period of performance including all options is 480 Calendar Days after the issuance of the notice to proceed.

Project scope: 

The Arrival/Departure Airfield Control Group(A/DACG) within the
existing Fort Bragg Installation Transportation Office. A/DACG provides customers with Air Load Planning support of
world-wide deployment operations. The work includes a 806sf second story addition to the existing building; repairs to the
Main Building, including the corridor and toilet rooms . Work also includes the Renovation of Latrines and addition of
latrine of the ground level to provide additional 304sf of floor area to increase the flushing fixtures count. The following
describes categorization of scope components aligned to Fort Bragg's requirements.
a. 806 square feet second story addition to existing building (New Load Planning Room).
b. Renovate and expand existing Operation Center on 2nd floor .
c. Renovation of associated spaces including corridor and toilet rooms.
d. Ground level Latrine renovation , including plumbing fixtures .
e. Expansion of ground level latrines by additional 304 square feet to increase flushing fixture count.
f. Two (2) new Pre-manufacturered metal canopies over both of the existing length scales in inclement weather.
g. Install empty conduits to the location of the rear wheel scale at each canopy for power and communications.

Solicitation Website:  The official solicitation, when posted, will be available free of charge by electronic posting only and may be found on the System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored.

Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://sam.gov to download the solicitation for this project.

If/when issued, Amendments will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Offerors must check the website periodically for any amendments to the solicitation.

Registrations:  System for Award Management (SAM)-Offerors shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. Suppose the Offeror is a Joint Venture (JV). In that case, the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If an Offeror is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective Offeror.

Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronic via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/.

Point of Contacts:  For this acquisition, the contracting officer, Mr. Greg Graham, whose e-mail address is gregory.m.graham@usace.army.mil., and the Contract Specialist, Tatjana Fisher, whose e-mail address is tatjana.m.fisher@usace.army.mil.

Update #2 ·

SITE VISIT INFORMATION - 

LOCATION IS THE A/DACG Building W-1967 at the airfield at 1000 hrs. The area is currently fenced off and no check-in is required to get to the fenced location. You will meet with the POC at that time. PROJNET will be updated with these same instructions.

Solicitation Notice Synopsis W912HN22B4011

Project Number: FA-16111-20

FA-16111-20 Enlarge/Modify Bldg. W-1967 Arrival/Departure Airfield Control Group (A/DACG)

The U.S. Army Corps of Engineers (USACE) Savannah District is issuing an Invitation for Bid (IFB) W912HN22B4011 for Project FA-16111-20 Enlarge/Modify Bldg. W-1967 Arrival/Departure Airfield Control Group (A/DACG)

Note: The subsequent solicitation will result in a C-Type Stand-alone contract.

Type of Contract & NAICS:  This Acquisition will be solicited using FAR Part 14, Sealed Bid Procedures for one (1) Firm-Fixed-Price (FFP) contract.  The North American Industry Classification System (NAICS) code is 236220 Commercial and Institutional Building Construction with a size standard of $39.5M.

Type of Set-Aside:  This acquisition is being offered as a 100% Total Small Business Set Aside

Construction Magnitude:  In accordance with DFARS 236.204, the magnitude of this construction project is anticipated to be between $10M-$25M.

Anticipated Solicitation Release Date:  The closing date is 27 August 2022. 

Period of Performance:  The period of performance including all options is 480 Calendar Days after the issuance of the notice to proceed.

Project scope: 

The Arrival/Departure Airfield Control Group(A/DACG) within the
existing Fort Bragg Installation Transportation Office. A/DACG provides customers with Air Load Planning support of
world-wide deployment operations. The work includes a 806sf second story addition to the existing building; repairs to the
Main Building, including the corridor and toilet rooms . Work also includes the Renovation of Latrines and addition of
latrine of the ground level to provide additional 304sf of floor area to increase the flushing fixtures count. The following
describes categorization of scope components aligned to Fort Bragg's requirements.
a. 806 square feet second story addition to existing building (New Load Planning Room).
b. Renovate and expand existing Operation Center on 2nd floor .
c. Renovation of associated spaces including corridor and toilet rooms.
d. Ground level Latrine renovation , including plumbing fixtures .
e. Expansion of ground level latrines by additional 304 square feet to increase flushing fixture count.
f. Two (2) new Pre-manufacturered metal canopies over both of the existing length scales in inclement weather.
g. Install empty conduits to the location of the rear wheel scale at each canopy for power and communications.

Solicitation Website:  The official solicitation, when posted, will be available free of charge by electronic posting only and may be found on the System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored.

Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://sam.gov to download the solicitation for this project.

If/when issued, Amendments will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Offerors must check the website periodically for any amendments to the solicitation.

Registrations:  System for Award Management (SAM)-Offerors shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. Suppose the Offeror is a Joint Venture (JV). In that case, the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If an Offeror is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective Offeror.

Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronic via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/.

Point of Contacts:  For this acquisition, the contracting officer, Mr. Greg Graham, whose e-mail address is gregory.m.graham@usace.army.mil., and the Contract Specialist, Tatjana Fisher, whose e-mail address is tatjana.m.fisher@usace.army.mil.

Update #1 ·

Solicitation Notice Synopsis W912HN22B4011

Project Number: FA-16111-20

FA-16111-20 Enlarge/Modify Bldg. W-1967 Arrival/Departure Airfield Control Group (A/DACG)

The U.S. Army Corps of Engineers (USACE) Savannah District is issuing an Invitation for Bid (IFB) W912HN22B4011 for Project FA-16111-20 Enlarge/Modify Bldg. W-1967 Arrival/Departure Airfield Control Group (A/DACG)

Note: The subsequent solicitation will result in a C-Type Stand-alone contract.

Type of Contract & NAICS:  This Acquisition will be solicited using FAR Part 14, Sealed Bid Procedures for one (1) Firm-Fixed-Price (FFP) contract.  The North American Industry Classification System (NAICS) code is 236220 Commercial and Institutional Building Construction with a size standard of $39.5M.

Type of Set-Aside:  This acquisition is being offered as a 100% Total Small Business Set Aside

Construction Magnitude:  In accordance with DFARS 236.204, the magnitude of this construction project is anticipated to be between $10M-$25M.

Anticipated Solicitation Release Date:  The closing date is 27 August 2022. 

Period of Performance:  The period of performance including all options is 480 Calendar Days after the issuance of the notice to proceed.

Project scope: 

The Arrival/Departure Airfield Control Group(A/DACG) within the
existing Fort Bragg Installation Transportation Office. A/DACG provides customers with Air Load Planning support of
world-wide deployment operations. The work includes a 806sf second story addition to the existing building; repairs to the
Main Building, including the corridor and toilet rooms . Work also includes the Renovation of Latrines and addition of
latrine of the ground level to provide additional 304sf of floor area to increase the flushing fixtures count. The following
describes categorization of scope components aligned to Fort Bragg's requirements.
a. 806 square feet second story addition to existing building (New Load Planning Room).
b. Renovate and expand existing Operation Center on 2nd floor .
c. Renovation of associated spaces including corridor and toilet rooms.
d. Ground level Latrine renovation , including plumbing fixtures .
e. Expansion of ground level latrines by additional 304 square feet to increase flushing fixture count.
f. Two (2) new Pre-manufacturered metal canopies over both of the existing length scales in inclement weather.
g. Install empty conduits to the location of the rear wheel scale at each canopy for power and communications.

Solicitation Website:  The official solicitation, when posted, will be available free of charge by electronic posting only and may be found on the System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored.

Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://sam.gov to download the solicitation for this project.

If/when issued, Amendments will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Offerors must check the website periodically for any amendments to the solicitation.

Registrations:  System for Award Management (SAM)-Offerors shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. Suppose the Offeror is a Joint Venture (JV). In that case, the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If an Offeror is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective Offeror.

Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronic via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/.

Point of Contacts:  For this acquisition, the contracting officer, Mr. Greg Graham, whose e-mail address is gregory.m.graham@usace.army.mil., and the Contract Specialist, Tatjana Fisher, whose e-mail address is tatjana.m.fisher@usace.army.mil.

Files

Show all 16

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
PN 110205 - SOS Hangar Renovation - Progressive-Design-Build OT Pope Army Airfield, Fort Bragg, Cumberland County, North Carolina · NAICS 236220 ENDIST Wilmington No set-aside
USAG Pressure Washing Fort Bragg, North Carolina 28310, United States · NAICS 561790 Mission and Installation Contracting Command HUBZone
FY26-FY31 JIOP Commercial Range Services BPA at Fort Bragg Fort Bragg, North Carolina 28310, United States · NAICS 561210 — Total Small Business
Unaccompanied Enlisted Personnel Housing (UEPH) Barracks# 103 Fort Hood, Texas, United States · NAICS 236220 ENDIST Fort Worth No set-aside
FY23-28 General Construction Services BPA - W911S223S8000 Fort Drum, New York 13602, United States · NAICS 236220 MICC Fort Drum HUBZone

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors