W912BU21-7 MX dredging philadelphia to trenton

Closed Pre-Solicitation Posted

Not the latest version. See the latest solicitation from .

Solicitation number
W912BU21B0007
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
United States

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice is for maintenance dredging of approximately 100,000 cubic yards of sediment from the Delaware River navigation channel between Philadelphia and Trenton. The U.S. Army Corps of Engineers Philadelphia District intends to award a firm fixed price contract to conduct pre- and post-placement condition surveys and mechanical dredging, with placement of dredged materials in the Money Island Disposal Area. The solicitation number will be W912BU21B0007 and will be issued on August 2nd, with bid opening occurring at least 30 days later. All dredging must be completed by March 15, 2022.

There is no set-aside designated for this procurement. The estimated value for this project is between $5-10 million. Dredging will be required to a depth of 41 feet below the mean low water datum, plus one foot allowable overdepth. The base bid work consists of dredging approximately 51,500 cubic yards within six station sections totaling 76,800 cubic yards when including allowable overdepth. The performance period is 90 calendar days.

Notice text

2 versions

Update #2 · Latest ·

1. Action Code: Pre-solicitation/Synopsis

2. Class Code:  Z

3. Subject: Maintenance Dredging, Delaware River, Philadelphia to Sea and hristina River, Wilmington Harbor

4. Notice ID: W912BU21B0007

4. Set-Aside Code: Unrestricted

5. Response Date: 02 August 2021   Time: 1:00 P.M./EST

6. Place of Performance:  Delaware River, Pennsylvania and New Jersey

7. Description of Work:

The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed price contract that consists of Maintenance dredging.

Contract work consists of maintenance dredging of approximately 100,000 cubic yards of sediment within the Delaware River, Philadelphia to Trenton main navigation channel between Frankford Range (Station 18+500) and Beverly Range (Station 62+000).  Work includes mechanical dredging with placement of the dredged material into the Money Island Disposal Area in Falls Township, PA.  Dredging will be required to a depth of 41’ MLLW (Datum) plus 1’ allowable overdepth.  The contractor will also be required to construct various, miscellaneous dike and sluice improvements within the Disposal Area.  Solicitation Number W912BU21B0007 will be issued on or about 02 August 2021 with a bid opening date occurring at least 30 days after the Solicitation.  The period of performance is 120 calendar days.  All dredging must be completed by 15 March 2022 due to environmental restrictions. Estimated cost range of the project is $5,000,000 to $10,000,000.

Estimated Quantities. The total estimated quantity of material necessary to be removed under this contract, including allowable overdepth, is as follows

BASE BID WORK ASSIGNMENTS FOR THE DELAWARE RIVER, PHILADELPHIA TO TRENTON:

STATION – STATION   ACCEPTANCE       REQUIRED               ALLOWABLE

                                               SECTION             DREDGING               OVERDEPTH

                                                                                  TO 41’                         41’ TO 42’

______________________________________________________________________

18+500 to 21+500 Red                       1                      16,300                         7,100

23+500 to 25+500 Red                       2                      4,100                           2,700

28+500 to 30+500 Green                    3                      9,600                           3,700                   

30+500 to 32+500 Green                    4                      3,000                           2,600  

42+000 to 44+000 Red                       5                      9,800                           4,900

44+000 to 46+000 Red                       6                      8,700                           4,300 

59+700 t0 61+700 Red                       7                      17,200                         6,000

BASE SUB TOTALS                                                68,700                         31,300

                           

BASE TOTAL                                                          100,000   

a. The following environmental window restriction is applicable for this contract:

all dredging between Allegheny Avenue and Burlington Island must be conducted between 1 June and 15 March. Coordination between the specification writer and Environmental Resources Branch in Planning Division will be required to ensure the most recent, appropriate monitoring requirements and reporting forms (as required by the latest NMFS biological opinion) are incorporated into the specifications.

b. Dredging under this advertisement will be restricted to mechanical or bucket dredging due to the steep side slopes immediately outside the federal channel, the limited capacity within Palmyra Cove or Money Island, and proximity to the Tacony-Palmyra Bridge.

8. Liquidated Damages.  The awarded contract will contain Liquidated Damages at a rate to be specified in the Solicitation.

9. The period of performance will be 120 calendar days.

10. This is not a request for proposals at this time, the solicitation will be available on or about 02 August 2021.

Solicitation documents, plans and specifications will only be available via the Sam.gov website (Sam.gov) homepage located at https://www.Sam.gov. Registration for plans and specifications should be made via Sam.gov Internet homepage and hard copies will not be available. No written or fax requests will be accepted. It is the contractor’s responsibility to monitor FBO for any amendments. The solicitation will contain FAR 52.222-38 Compliance with Veterans’ Reporting Requirements, therefore contractors who have received a Federal Contract of $100,000.00 or greater, except as waived, must have submitted the preceding fiscal year Federal Contractor Veterans’ Employment Report (VETS-100 and/or VETS-100A Report) to be eligible for an award. If you have any questions or concerns regarding VETS-100 or VETS-100A reports please contact VETS-100 customer support at 1-866-237-0275 or via email at VETS100- customersupport@dol.gov. The solicitation will contain FAR provision 52.204-7; therefore a bidder must be registered in the System for Award Management (SAM) database prior to award. Davis Bacon rates will be applicable to the construction. Affirmative action to ensure equal employment opportunity is applicable to the resulting contract.

                                                                                                 

                                                                                                 

                                                                           

Update #1 ·

The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed price contract that consists of Maintenance dredging. 

Under this contract, Contractor will conduct pre- and post-placement condition surveys for each section. The contractor will be required to request surveys two working days prior to completing or beginning a dredging section.

Contract work consists of maintenance dredging of approximately 100,000 cubic yards of sediment within the Delaware River, Philadelphia to Trenton main navigation channel between Frankford Range (Station 18+500) and Beverly Range (Station 62+000).  Work includes mechanical dredging with placement of the dredged material into the Money Island Disposal Area in Falls Township, PA.  Dredging will be required to a depth of 41’ MLLW (Datum) plus 1’ allowable overdepth.  The contractor will also be required to construct various, miscellaneous dike and sluice improvements within the Disposal Area. Solicitation Number W912BU21B0007 will be issued on or about 02 August 2021 with a bid opening date occurring at least 30 days after the Solicitation. The period of performance is 90 calendar days.  All dredging must be completed by 15 March 2022 due to environmental restrictions.  Estimated cost of this project is $5,000,000 to $10,000,000.

Estimated Quantities. The total estimated quantity of material necessary to be removed under this contract, including allowable overdepth, is as follows:

BASE BID WORK ASSIGNMENTS FOR THE DELAWARE RIVER, PHILADELPHIA TO TRENTON:

                                                                                                           AVAILABLE                     AVAILABLE

                                                                                                              REQUIRED                  ALLOWABLE

                                                                                                              DREDGING                 OVERDEPTH

STATION                                                ACCEPTANCE                          TO 41’                         41’ TO 42’

                                                                   SECTION

________________________________________________________________________________________________________

18+500 to 21+500 Red                                   1                      16,300                         7,100

23+500 to 25+500 Red                                   2                      4,100                           2,700

28+500 to 30+500 Green                                3                      9,600                           3,700                   

30+500 to 32+500 Green                                4                      3,000                           2,600  

42+000 to 44+000 Red                                   5                      9,800                           4,900

44+000 to 46+000 Red                                   6                      8,700                           4,300 

 

BASE SUB TOTALS                                                             51,500                        25,300

BASE  TOTAL                                                                                          76,800  

a. The following environmental window restriction is applicable for this contract: all dredging between Allegheny Avenue and Burlington Island must be conducted between 1 June and 15 March. Coordination between the specification writer and Environmental Resources Branch in Planning Division will be required to ensure the most recent, appropriate monitoring requirements and reporting forms (as required by the latest NMFS biological opinion) are incorporated into the specifications.

b. Dredging under this advertisement will be restricted to mechanical or bucket dredging due to the steep side slopes immediately outside the federal channel, the limited capacity within Palmyra Cove or Money Island, and proximity to the Tacony-Palmyra Bridge.

8. Liquidated Damages.  The awarded contract will contain Liquidated Damages at a rate to be specified in the Solicitation.

9. The period of performance will be 90 days. The place of performance is Delaware River, Philadelphia to Sea and Christina River, Wilmington Harbor.

10. This is not a request for proposals at this time, Solicitation No. W912BU21B0007 will be issued on or about 02 August 2021 as an Unrestricted Invitation for Bids. Bid opening will be conducted on 02 September 2021 at 11:00 a.m. Bonding will be required; at the time of bid opening, by separate Bid Bonds; Performance and Payment Bonds will be required prior to issuance of Notice to Proceed. The award will be made as a whole to one bidder in accordance to FAR Part 14 Procedures.

Solicitation documents, plans and specifications will only be available via the Sam.gov website (Sam.gov) homepage located at https://www.Sam.gov. Registration for plans and specifications should be made via Sam.gov Internet homepage and hard copies will not be available. No written or fax requests will be accepted. It is the contractor’s responsibility to monitor FBO for any amendments. The solicitation will contain FAR 52.222-38 Compliance with Veterans’ Reporting Requirements, therefore contractors who have received a Federal Contract of $100,000.00 or greater, except as waived, must have submitted the preceding fiscal year Federal Contractor Veterans’ Employment Report (VETS-100 and/or VETS-100A Report) to be eligible for an award. If you have any questions or concerns regarding VETS-100 or VETS-100A reports please contact VETS-100 customer support at 1-866-237-0275 or via email at VETS100- customersupport@dol.gov. The solicitation will contain FAR provision 52.204-7; therefore a bidder must be registered in the System for Award Management (SAM) database prior to award. Davis Bacon rates will be applicable to the construction. Affirmative action to insure equal employment opportunity is applicable to the resulting contract.

Notice history

Notice Type Posted
W912BU21-7 MX dredging philadelphia to trenton Latest solicitation Solicitation
This notice Pre-Solicitation
W912BU21-7 MX dredging philadelphia to trenton Original Pre-Solicitation

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors